A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()A、Install a p615 per application.B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.C、Install the appropriate solution once the requirements are understood.D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
- A、Install a p615 per application.
- B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
- C、Install the appropriate solution once the requirements are understood.
- D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
相关考题:
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()A、Upgrade OS to AIX 5.2.B、Implement Micro-Partitioning.C、Upgrade HMC to support POWER5.D、Install Partition Load Manager.
A customer SAN environment has undergone significant growth over the past two years. They havealso suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus. Which tool should the storage specialist suggest()A、VisioB、TPC Basic EditionC、IBM Tivoli NetViewD、Fabric Manager
The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()A、I/T services and education to help with the implementation of the hardware and softwareB、A Supportline specialist to work directly with the customer to manage any issues that ariseC、The services required to move the currently installed applications from the competitor’s systems to the IBM systemsD、A slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution
A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills. They are planning to implement their first HACMP cluster of two p5-570s. Which of the following should be included in the IBM proposal?()A、HACMP Hardware ServicesB、p5-570 differences updateC、HACMP SmoothStart ServicesD、AIX installation education
A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A、One 7311-D20 drawerB、Two 7311-D20 drawersC、Two 7311-D10 drawersD、One 7311-D10 drawers
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()A、Disk usage will increase in proportion to memory.B、The new database will demand much more memory.C、Memory demand will increase 10% for the next year.D、Processor demand will increase about 10% for the next year.
A customer’s SAN environment has undergone significant growth over the past two years. They have also suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus. Which tool should the storage specialist suggest()A、Tivoli Storage Productivity Center Fabric ManagerB、Tivoli Storage Productivity Center Basic EditionC、IBM TivoliNetViewD、Disk Magic
A new IBM x 3650 M3 customer has experienced support issues with problem resolution from their previous vendor. The biggest problem was with Microsoft applications failing intermittently. Which of the following IBM products covers this issue?()A、IBM Hardware Standard WarrantyB、TechlineC、Tivoli Problem Resolution Manager(TPRM)D、RTS
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()A、A p650 running AIX v5.3B、A p5-550 running AIX v5.3C、A p5-570 running Advanced POWER VirtualizationD、Multiple rack-mounted p615s running dynamic LPAR
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
What is the main reason for doing a Solutions Assurance Review with the customer? ()A、To revalidate the total solutionB、To overcome objections to the solutionC、To review the pricing with the customerD、To ensure the customer has the correct applications
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A、The technical support specialist has completed a UNIX course at college.B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.C、The technical support specialist’s company sells $3M of UNIX computer systems every year.D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()A、The p5-570 would save rack space over a pair of p5-550 servers.B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.
A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel. Which of the following should help IBM meet the customer’s requirements?()A、Propose VMware with Linux on Intel as a solution.B、Provide a special bid on the System x servers.C、Include migration services within the proposal.D、Provide a warranty offering with guaranteed fix levels.
A customer is in the initial stages of implementing a server consolidation project. The Information Technology staff has identified several Microsoft Windows servers that are running single applications on older hardware and averaging under 20% utilization. Part of their server consolidation goal is to lower the number of servers, decrease the operating system license cost, and increase utilization per server. Which of the following IBM Director extensions could be used to satisfy all of these requirements?()A、Aurema Application Workload ManagerB、Remote Deployment ManagerC、Virtual Machine ManagerD、Capacity Manager
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
A customer has Windows servers and applications that use block I/O. The customer cannot affordthe cost of a fibre channel infrastructure but still requires shared storage. Which configurationmeets these requirements at the lowest cost?()A、iSCSI HBAs and N3400B、MicrosoftiSCSI initiator and N3400C、MicrosoftiSCSI initiator and DS3400D、SAN04B-R multi-protocol router and DS3400
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A、Configure a 2 node x3950 X5 B、Customer needs a System p server to support Oracle applications C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D、Configure a system that meets the minimum requirements
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()A、Turn over current design to Techline to create configurationsB、Perform knowledge transfer of design requirements to Business partner then disengageC、Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)D、Work with business partner to engage Techline to create configurations
单选题A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()AConfigure a 2 node x3950 X5 BCustomer needs a System p server to support Oracle applications CDownload the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing DConfigure a system that meets the minimum requirements
单选题What is the main reason for doing a Solutions Assurance Review with the customer? ()ATo revalidate the total solutionBTo overcome objections to the solutionCTo review the pricing with the customerDTo ensure the customer has the correct applications
单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()AThe technical support specialist has completed a UNIX course at college.BThe technical specialist has supported several similar projects and has earned an IBM AIX certification.CThe technical support specialist’s company sells $3M of UNIX computer systems every year.DThe technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
单选题A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()AA p650 running AIX v5.3BA p5-550 running AIX v5.3CA p5-570 running Advanced POWER VirtualizationDMultiple rack-mounted p615s running dynamic LPAR
单选题A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()ADisk usage will increase in proportion to memory.BThe new database will demand much more memory.CMemory demand will increase 10% for the next year.DProcessor demand will increase about 10% for the next year.
单选题______ my opinion, customer service here has improved but not as much as expected over the last 2 years.AOnBInCForDWith
单选题After months of negotiations and several proposals, the customer indicates that they may be ready to purchase a pSeries system. Rather than quickly ordering the last configuration proposed, what is the most appropriate next step for a pSeries technical specialist to improve the chance of a successful project?()AObtain buy-in and feedback from the customer.BFirst ask the client executive if financing has been arranged.CPlan the installation and rollout schedule before ordering.DConfirm that any additional requirements are handled by others.
单选题A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills. They are planning to implement their first HACMP cluster of two p5-570s. Which of the following should be included in the IBM proposal?()AHACMP Hardware ServicesBp5-570 differences updateCHACMP SmoothStart ServicesDAIX installation education