Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()A、Use micropartitioning for test and QA environments, and DLPAR for the production applications B、Use micropartitioning for test and QA environment, and CPU pooling for the production applications C、Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated. D、Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment.
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
- A、Use micropartitioning for test and QA environments, and DLPAR for the production applications
- B、Use micropartitioning for test and QA environment, and CPU pooling for the production applications
- C、Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated.
- D、Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment.
相关考题:
The project life-cycle can be described as(72). A.project concept,project plannin9,project execution,and project close-out B.project planning,work authorization,and project reporting C.project planning,project control,project definition,WBS development,and project termination D.project concept,project execution,and project reporting
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()A、CODB、DLPARC、One big LPARD、Two separate p690 machines
Companycom has restored their mksysb. They notice that the external volume groups cannot be seen. What should be done to access the volume groups?()A、Run importvg commandB、Run synclvodm commandC、Recreate volume groupsD、Update /etc/filesystems
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
After rebooting the machine, Companycom notices that the machine is not performing as well as before. The applications are running slower, and their CPU utilization has increased. How can the customer check to see if a CPU was deallocated?()A、Run the vmstat commandB、Run the iostat commandC、Run the lparstat commandD、Check the logs in the /var/adm/ras directory
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A、128B、254C、320D、640
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()A、Apply OS updates once a yearB、Utilize a GPFS cluster solutionC、Implement a two server deployment with HACMPD、Install a single server implementation with HACMP failover to a second LPAR
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()A、LoadlevelerB、AIX Workload ManagerC、Partition Load ManagerD、Tivoli Provisioning Manager
While planning the logical volume design of a new install, Companycom considered using a striped logical volume for performance. They want to be able to extend the logical volume in the future. Which of the following actions will provide this capability?()A、Add additional logical volumes two at a timeB、Add additional physical volumes two at a timeC、Create a columned striped logical volume using -C option of mklvD、Create an extendable striped logical volume using -E option of mklv
关于LTE的主要网元说法正确的为()A、自配置(Self-deployment)B、LTE的接入网E-UTRAN由e-NodeB组成,提供用户面和控制面C、LTE的核心网EPC由MME,S-GW和P-GW组成D、自规划(Self-plannin)
单选题Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A128B254C320D640
单选题Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()AFrom the HMCBFrom a NFS mountCFrom a FTP serverDFrom any CD or DVD drive on another server
单选题Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()ABy typing diags and then going to the ASMI menusBThrough SSH from a TCP/IP connection on the serverCThrough WebSM which is connected to a system Ethernet portDBy connecting through a web browser to an HMC Ethernet port
单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()AOne single port Ethernet adapterBFour dual port Ethernet adaptersCTwo single port Ethernet adaptersDEight single port Ethernet adapters