Some xSeries servers support 4-way memory interleaving and some support 2-way interleaving.  In both types of interleaving, the data is accessed 256 bits at a time.  How is this 256-bit data access achieved with 2-way interleaving?()A、The DIMMs used for 2-way interleaving are double the width of DIMM used in 4-way interleaving.B、The DIMMs used for 2-way interleaving are 64-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.C、The DIMMs used for 2-way interleaving are 32-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.D、The DIMMs used for 2-way interleaving are double the width and data bits are accessed both on the rising edge and falling edge of the clock cycle.

Some xSeries servers support 4-way memory interleaving and some support 2-way interleaving.  In both types of interleaving, the data is accessed 256 bits at a time.  How is this 256-bit data access achieved with 2-way interleaving?()

  • A、The DIMMs used for 2-way interleaving are double the width of DIMM used in 4-way interleaving.
  • B、The DIMMs used for 2-way interleaving are 64-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.
  • C、The DIMMs used for 2-way interleaving are 32-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.
  • D、The DIMMs used for 2-way interleaving are double the width and data bits are accessed both on the rising edge and falling edge of the clock cycle.

相关考题:

Which three server types are supported for the installation of Cisco CRS?()A、Cisco MCS 78xx serversB、Dell PowerEdge serversC、HP DL Cisco certified serversD、Acer Altos serversE、IBM xSeries Cisco certified serversF、Apple servers

A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution. Which of the following architectural features should be discussed with them?()A、x3650 M3 servers and racksB、x3550 M3 servers, VMware and racksC、BladeCenter, blades and VMwareD、x3620 M3 servers and VMware

An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot.  Which of the following is the FIRST thing the administrator should check?()A、 Default gatewayB、 The ports on the switchC、 Port security on the servers switch portD、 Ethernet cable

An administrator notes that after a recent power outage, some open files were corrupted on oneaffected file server. Which of the following items should the administrator consider to determine the cause of this corruption?()A、 The servers memoryB、 The servers RAID controller batteryC、 The servers processorD、 The servers NIC teaming configuration

An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()A、Share the data over the Ethernet LAN.B、Install the IXA Adapter in the iSeries server.C、Install the IXA Adapter in the xSeries server.D、Attach both servers to an IXS switch.

A Dell customer decided to use IBM Director and xSeries to manage their servers.  They purchased 10 IBM x336 servers and they already have 75 various Dell servers.  Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()A、Verify that the Dell systems have TCP/IP enabledB、Verify that the systems are running the IBM Director AgentC、Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliantD、Verify that the Dell systems have at least a 1GB of memory installedE、Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers

A customer wants to deploy VMWare ESX on four-way Intel systems.  They are considering IBM and Dell.Which of the following is an advantage IBM has over the competition?()A、IBM provides optional Remote Technical Support for hardware, NOS, and VMWare.B、The IBM xSeries EXA chipset has extensions to provide better efficiency for the VMFS file system.C、IBM servers can address larger LUNs on SAN storage than Dell.D、IBM provided VMWare with the majority of their internal drivers for ESX.

A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()A、thereare no potential risksB、the FCIDs of the servers must be changedC、the SVC must be shut down during the migrationD、changing the FCIDs of storage resources will impact some servers

A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution.Which of the following architectural features should be discussed with them?()A、x3650 M3 servers and racks B、x3550 M3 servers, VMware and racks C、BladeCenter, blades and VMware D、x3620 M3 servers and VMware

When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()A、xSeries specialist,as the customer may have some Intel-based systems.B、Hardware customer engineer,as they will be installing the entire solution.C、Services specialist,as they can provide education recommendations for the entire solution. D、Storage specialist,as the customer may need disk to store the data and tape to backup the data.

A company has 20 remotely located Microsoft Windows 2000 xSeries servers which need to deploy a non-IBM software application from a Windows 2000 xSeries server.  How would they take advantage of IBM Director to be able to effectively deploy this application?()A、Use Remote Deployment Manager.B、Use the Update Assistant function of IBM Director.C、Use the Software Deployment Tool of the IBM Director.D、Use Software Distribution Premium Edition for IBM Director.

A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path.  From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.

A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()A、A VIO server requires a dedicated LHEA port.B、There is a limit of 32 LPARs per virtual LAN.C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

A customer is concerned about the high energy cost associated with their data center. Specifically, their concern focuses on the cooling cost of many hundreds of servers. You have a meeting with the CIO and CFO to propose a solution.  How would you prepare yourself for the meeting? ()A、Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.B、Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.C、Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.D、Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.

You have an Exchange Server 2010 organization.  An Edge Transport server sends and receives all e- mail messages from the Internet.  You notice that some servers on the Internet identify e-mail messages from your organization as spam. You need to minimize the possibility that e-mail messages sent from your organization are identified asspam.  What should you do?()A、Implement Microsoft Forefront Security for Exchange Server.B、Create SenderID TXT records for the Edge Transport servers.C、Configure the Edge Transport servers to use a real-time block list (RBL).D、Install a server certificate from a trusted third-party certification authority (CA).

Your virtual environment includes several Windows Server 2008 R2 Hyper-V servers. Some servers have 16 GB of RAM, and some servers have 32 GB of RAM. Each server has a dedicated management network adapter. Several virtual machines (VMs) are configured on local disk arrays.  You plan to enable live migration between all Hyper-V host servers. Your plan must optimize the environment for live migration and enable the live migration of all VMs among all servers. You need to specify the components to add or upgrade.  What should you do?()A、On each Hyper-V host server, provision additional disk resources on the local storage volumes. Add a second network adapter to each host server, and assign this network adapter to a local switchB、On each Hyper-V host server, provision additional disk resources on shared storage volumes. Add a second network adapter to each host server, and assign this network adapter to a local switchC、On each Hyper-V host server, provision additional disk resources on the local storage volumes. Install additional RAM as necessary so that all host servers have the same amount of RAMD、Install additional RAM as necessary so that all host servers have the same amount of RAM. Add a second network adapter to each host server, and assign this network adapter to a local switch

单选题Your company security policy does not allow you to connect your servers directly to the internet. You would like to utilize some of theYour company? security policy does not allow you to connect your servers directly to the internet. You would like to utilize some of the functionality in Solaris 10 to analyze your systems for available OS updates, and also download and install those updates from Sun Microsystems.  Which answer describes how to utilize this functionality to analyze your systems for available OS updates, and also download and install those updates without connecting your server directly to the internet? ()A AB BC CD D

单选题A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()Athereare no potential risksBthe FCIDs of the servers must be changedCthe SVC must be shut down during the migrationDchanging the FCIDs of storage resources will impact some servers

单选题A customer is running system management software on one of their Windows xSeries servers, and the software seems to slow down their database application over time.  The customer is running IBM Director in their environment.  Which IBM Director tool can they utilize to guarantee processor time for the different applications and optimize the server performance?()ASoftware RejuvenationBCapacity ManagerCCapacity Workload ManagerDAurema Application Workload Manager

单选题You are designing an organizational unit (OU) structure to manage the New App servers. What should you do?()ACreate one OU that includes both the web servers and the database servers.  BCreate one OU that includes the web servers and one OU that includes the database servers.  CCreate one OU that includes the web servers. Then Place the database servers in the Computer Containers.DPlace the web server and the database servers in the Domain Controller OU.

单选题An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot.  Which of the following is the FIRST thing the administrator should check?()A Default gatewayB The ports on the switchC Port security on the servers switch portD Ethernet cable

单选题An enterprise has plans to start adding IPv6 support. The initial deployment requires support from some IPv6 - only device s that need to access servers that support only IPv4. Which of the following tools would be most appropriate?()ANative IPv6BPoint - to -point tunnelsCMultipoint tunnelsDNAT - PT

单选题An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment.  The DB2 application contains the database for an order entry application.  An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes.  The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()ApSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.BConsolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.CStorage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.DStorage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).

单选题An administrator notes that after a recent power outage, some open files were corrupted on oneaffected file server. Which of the following items should the administrator consider to determine the cause of this corruption?()A The servers memoryB The servers RAID controller batteryC The servers processorD The servers NIC teaming configuration

多选题Which three server types are supported for the installation of Cisco CRS?()ACisco MCS 78xx serversBDell PowerEdge serversCHP DL Cisco certified serversDAcer Altos serversEIBM xSeries Cisco certified serversFApple servers

单选题A customer wants to deploy VMWare ESX on four-way Intel systems.  They are considering IBM and Dell.Which of the following is an advantage IBM has over the competition?()AIBM provides optional Remote Technical Support for hardware, NOS, and VMWare.BThe IBM xSeries EXA chipset has extensions to provide better efficiency for the VMFS file system.CIBM servers can address larger LUNs on SAN storage than Dell.DIBM provided VMWare with the majority of their internal drivers for ESX.