单选题A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()Athereare no potential risksBthe FCIDs of the servers must be changedCthe SVC must be shut down during the migrationDchanging the FCIDs of storage resources will impact some servers

单选题
A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()
A

thereare no potential risks

B

the FCIDs of the servers must be changed

C

the SVC must be shut down during the migration

D

changing the FCIDs of storage resources will impact some servers


参考解析

解析: 暂无解析

相关考题:

Which type of VPN router is not required to run MPLS?() A. Provider Core (P)B. Provider Edge (PE)C. Customer Edge (CE)D. Customer Boundary (CB)

Which VPN router does not contain customer routing knowledge?() A. Provider Core (P)B. Provider Edge (PE)C. Customer Edge (CE)D. Customer Boundary (CB)

In a collapsed core design, which two benefits are provided by a second-generation Cisco MDS director? ()A、 a higher fan-out ratioB、 fully redundant switchesC、 100 percent port efficiencyD、 all ISLs contained within a single chassisE、 higher latency and throughput than a core-edge design switch

A customer’s support technician finished installing their new x366 server running Windows 2003 Enterprise Server and the IBM Director agent.  The customer applied the latest BIOS and firmware drivers available on the Web for the system.  The problem is that the x366 runs for a few minutes and then reboots itself.  Which of the following should be checked first?()A、Configure the box with RAID-1 and not RAID-5.B、Disable Hyperthreading feature on the machine.C、Ensure the Watchdog timers on the RSA-II are disabled.D、Replace the Windows NTLDR file on the root partition from another copy of the Windows OS files.

A Customer has a functional server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible. What method can achieve this?()A、Install Windows 2003 using the F6 supply Mass Storage Controller optionB、Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director EditionC、Deploy Customer’s existing image and use UXSPi to update IBM specific driversD、Use ServerGuide to install Windows 2003

Which VPN router does not contain customer routing knowledge?()A、Provider Core (P)B、Provider Edge (PE)C、Customer Edge (CE)D、Customer Boundary (CB)

Which type of VPN router is not required to run MPLS?()A、Provider Core (P)B、Provider Edge (PE)C、Customer Edge (CE)D、Customer Boundary (CB)

A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()A、Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.B、Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.C、Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.D、Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.

A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()A、Add External Storage via EXP3000B、Replace current storage with more dense drivesC、Add External Storage via SAND、Add storage expansion blade

A customer plans to deploy Open Fabric Manager (OFM). Which vendors would you recommend?()A、Brocade B、Blade Network Technology (BNT) C、Cisco D、Juniper

A customer has a mixed Dell and IBM server environment.  They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers.  Which TWO features of IBM Director will be an advantage for this customer?()A、IBM Director comes with free Aurema and SteelEye software plug-ins.B、IBM Director supports non-IBM industry standard Intel based servers.C、IBM Director servers can be managed from within the MS Performance Monitor.D、IBM Director requires no agents to be installed and run on the IBM systems.E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.

A customer plans to deploy Open Fabric Manager (OFM). Which vendors meet this need of the following?()A、BrocadeB、Blade Network Technology (BNT)C、CiscoD、Juniper

A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()A、 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.B、 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.C、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.D、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.

A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()A、thereare no potential risksB、the FCIDs of the servers must be changedC、the SVC must be shut down during the migrationD、changing the FCIDs of storage resources will impact some servers

A customer has 12 x445s and 20 x365s in their datacenter that are dedicated to production workloads.  The customer wants to standardize on IBM Director as their Intel environment systems management platform.  Which server platform is supported as a Director server?()A、zSeriesB、pSeriesC、iSeriesD、iSeries with IXA Adapter

A customer is running a number of HP Intel servers within an IBM management environment.  The HP Insight Manager agent is already installed, but they do not want to install the Director agent because of potential conflicts.  Into which system are the MIB files compiled?()A、On the HP managed serverB、On the IBM Director serverC、On the IBM Director Jet databaseD、In the IBM Director database

A customer wants to migrate from McData-based fabrics to native Brocade fabrics. A Brocadedirector in the McData interop mode of operations has already been added to the fabrics, and thedevices moved from McData switches to the Brocade director. The customer is now ready toremove the McData switches from the fabrics and change the Brocade director to native mode ofoperations. What product is needed to migrate the zoning configuration to the Brocade director?()A、TPCB、TSMC、DCFMD、Fabric Watch

A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()A、the production environment does not require an outageB、the production environment requires an outage to install the SVCC、the production environment requires an outage to install the DS8700D、the production environment requires an outage to remove the EMC systems

A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this?()A、UseServerGuide to install Windows 2003rchase PowerVM Standard Edition for the entire systemB、Install Windows 2003 using the F6 supply Mass Storage Controller optionC、Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director EditionD、Deploy Customer’s existing image and useUXSPi to update IBM specific drivers

单选题Which VPN router does not contain customer routing knowledge?()AProvider Core (P)BProvider Edge (PE)CCustomer Edge (CE)DCustomer Boundary (CB)

单选题A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()Athe production environment does not require an outageBthe production environment requires an outage to install the SVCCthe production environment requires an outage to install the DS8700Dthe production environment requires an outage to remove the EMC systems

单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()AContact the IBM FTSS to replace the driveBContact the IBM CSR or SSR to replace the driveCOrder a replacement driveDContact IBM Service

单选题A customer is running system management software on one of their Windows xSeries servers, and the software seems to slow down their database application over time.  The customer is running IBM Director in their environment.  Which IBM Director tool can they utilize to guarantee processor time for the different applications and optimize the server performance?()ASoftware RejuvenationBCapacity ManagerCCapacity Workload ManagerDAurema Application Workload Manager

多选题A customer runs an application on a supported 8-way x445.  The customer needs to monitor operations and wants to be alerted when problems arise.  Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()AFan operationBBottleneck analysisCPower supply operationsDPlanned versus unplanned outagesEApplication predictive failure analysis

单选题A customer is running a number of HP Intel servers within an IBM management environment.  The HP Insight Manager agent is already installed, but they do not want to install the Director agent because of potential conflicts.  Into which system are the MIB files compiled?()AOn the HP managed serverBOn the IBM Director serverCOn the IBM Director Jet databaseDIn the IBM Director database

多选题In a collapsed core design, which two benefits are provided by a second-generation Cisco MDS director? ()Aa higher fan-out ratioBfully redundant switchesC100 percent port efficiencyDall ISLs contained within a single chassisEhigher latency and throughput than a core-edge design switch

单选题A large customer location world-wide needs to remotely update UEFI Firmware on their systems. Which function of IBM System Director will help this customer?()AAutomation ManagerBUpdate ManagerCSystem Maintenance and Update ToolDService and Support Manager