The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()A、Archive the materials in the team’s library.B、Act as the sole technical resource for the team.C、Summarize the information and make it available to the team.D、Evaluate the class and recommend attendance to other team members.
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
- A、Archive the materials in the team’s library.
- B、Act as the sole technical resource for the team.
- C、Summarize the information and make it available to the team.
- D、Evaluate the class and recommend attendance to other team members.
相关考题:
A customer called and indicated that their p690 system did not come with any installation and user manuals. Which of the following sources can best provide this information? ()A、IBM RedbooksB、IBM SupportlineC、pSeries LibraryD、pSeries College
An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment. The DB2 application contains the database for an order entry application. An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes. The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()A、pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.B、Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.C、Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.D、Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
Which website provides access to AIX Technology Level updates?() A、AIX TipsB、Fix CentralC、Critical FixesD、pSeries and AIX Information Center
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()A、Request that the pSeries technical specialist provide the discount percentage to the customer.B、Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.C、Confirm with the customer that the installed inventory accurately reflects what is actually installed.D、Provide options to the customer so they can choose the most appropriate upgrade for their environment.
In addition to AIX, which of the following operating systems is supported in a pSeries LPAR environment?()A、z/OSB、LinuxC、Sun Solaris 9D、Microsoft Windows 2003
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()A、Implementing CoDB、Using Express Configurations with processor upgradesC、Meeting the minimum Value Pak rulesD、Engaging the pSeries representative to identify appropriate discounts
A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems. They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems. They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()A、Combine the file/print servers onto a larger Intel-based machine (x445).B、Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.C、Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.D、Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
A customer wants a configuration for a new system that includes Reserve CoD. Which of the following systems would be the most appropriate to configure for them?()A、p5-550B、p5-520C、pSeries p650D、pSeries p630
A customer needs detailed information on the internal architecture of the new p5-570. Which of the following is the most appropriate place to get this documentation?()A、IBM sales manualB、IBM Redbooks WebsiteC、IBM eServer p5 and pSeries Qs and AsD、IBM eServer p5 and pSeries Facts and Features
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A、TSMB、PSSPC、WebSMD、LoadLeveler
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()A、Sales ManualB、Announcement LetterC、Site and Hardware Planning InformationD、Adapter, Devices, and Cable Information for Multiple Bus Systems
Which of the following application development environments are supported on Linux and AIX on pSeries?()A、C and C#B、C and C++C、C++ and RPGD、RPG and BASIC
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()A、Sales ManualB、Announcement LetterC、POWER4+ p650 Specification SheetD、Site and Hardware Planning Information Manual
A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()A、The pSeries family of servers offers many choices from small entry servers to data-center class systemsB、pSeries systems support both AIX and Linux operating systems providing a single platform for both environmentsC、AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries serverD、Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized
Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()A、ATMB、EthernetC、SP Switch2D、Fibre Channel
What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()A、pSeries eWLM can create classes while pSeries WLM can create tiers.B、pSeries eWLM can create tiers while pSeries WLM can create classes.C、pSeries eWLM is implemented over multiple O/S images while pSeries WLM is implemented within an individual O/S image.D、pSeries eWLM is implemented within an individual O/S image while pSeries WLM is implemented over multiple O/S images.
On what metrics is Software Maintenance for AIX (SWMA) priced?()A、Clock speed and memory capacityB、AIX version and number of usersC、pSeries class and number of CPUsD、pSeries model and number of LPARs
单选题A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()AA DCE domainBA Kerberos domainCA PPP tunnel between the serversDAn IPSEC tunnel between the servers
单选题A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the following limitations?()ASome Express Configurations limit the amount of maximum memory at order time.BThe customer must meet minimum system requirements to obtain Express Configuration pricing. CThe Express Configurations offer less than the maximum number of processors.DThe Express Configurations are only offered through the QuickShip Program.
单选题What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()ApSeries eWLM can create classes while pSeries WLM can create tiers.BpSeries eWLM can create tiers while pSeries WLM can create classes.CpSeries eWLM is implemented over multiple O/S images while pSeries WLM is implemented within an individual O/S image.DpSeries eWLM is implemented within an individual O/S image while pSeries WLM is implemented over multiple O/S images.
单选题After months of negotiations and several proposals, the customer indicates that they may be ready to purchase a pSeries system. Rather than quickly ordering the last configuration proposed, what is the most appropriate next step for a pSeries technical specialist to improve the chance of a successful project?()AObtain buy-in and feedback from the customer.BFirst ask the client executive if financing has been arranged.CPlan the installation and rollout schedule before ordering.DConfirm that any additional requirements are handled by others.
单选题A university researcher needs a large server with high numeric computing capacity to do computational fluid dynamics calculations. The pSeries technical specialist has a recent pSeries and RS/6000 Performance Report. Which of the following tables should be consulted to advise the customer concerning relative performance of various models?()ArPerfBROLTPCSPECfpDSPECint
单选题A system administrator suspects that there were problems with the AIX installation on a pSeries server. Which of the following commands can be used, with the appropriate flags, to view the BOS installation output files?()AalogBerrptClscfgDinstallp
单选题A customer wants to receive automatic notification of critical software problems and fixes for their RS/6000 or eServer pSeries system. Which is the most appropriate services offering to recommend to them?()ATechlineBConsultlineCOperational Support Services - RS/6000 SystemWatchDOperational Support Services - Alert for pSeries
单选题A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()AThe pSeries family of servers offers many choices from small entry servers to data-center class systemsBpSeries systems support both AIX and Linux operating systems providing a single platform for both environmentsCAIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries serverDThousands of AIX operating system-based applications, middleware, and tools are available today and already optimized