除POWER595外,POWER Systems服务器一般内置的硬盘接口为什么规格?()A、ULTRA320 SCSIB、SASC、FC-ALD、IDE
除POWER595外,POWER Systems服务器一般内置的硬盘接口为什么规格?()
- A、ULTRA320 SCSI
- B、SAS
- C、FC-AL
- D、IDE
相关考题:
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()A、Identify which systems are the most critical and bring them up by level of importance.B、Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、Identify the least critical systems and then power those systems on first.D、Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
我是一名IBM合作伙伴的销售代表,非常想通过掌握销售IBM POWER Systems 服务器来提升业绩,我可以做的是()A、参加IBM 的市场活动,从中拿到最及时的讯息B、找IBM 当地的Sales 谈一谈,了解IBM POWER Systems 渠道合作和奖励计划C、浏览IBM 的中文网站,注册成为会员,免费得到电子资料D、参加IBM POWER Systems 销售培训,学习产品销售知识E、以上都可以
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
下列关于IBM产品标准保修说法错误的是()A、POWER Systems服务器(除P 575外)提供3年7X24保修B、UNIX图形工作站提供1年5x9保修C、超过Warrenty部分需要IBM服务部门报价D、无法提供额外的保修
与Sun SPARC Enterprise M4000相比,哪一款POWER Systems服务器性能即可胜出?()A、POWER520即可B、需要POWER550C、需要POWER570D、需要POWER595
客户会在什么样的环境下用POWER Systems服务器?或者说什么样的客户需要POWER Systems服务器?()A、对性能要求高B、对稳定性要求高C、作数据库服务器D、作前端web服务器
What is an advantage of using an HMC rather than IVM for system management?()A、Support for a single VIO Server environmentB、Adapters can be dedicated or virtual for each LPAR environmentC、Interfaces with Systems Director to manage the Power Systems serversD、Supports multiple Power Systems servers from a single point of control
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse
A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A、I/O Planning GuideB、Power Systems data sheetC、Power Systems Facts and FeaturesD、Run FLRT to recommend I/O features
关于POWER Systems和x系列服务器,下列陈述错误的是()A、POWER Systems是UNIX小型机B、X系列是X86服务器C、X系列可以运行linux操作系统D、POWER Systems不可以运行linux操作系统
单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()AA desk, as it not rack mountableBEthernet connections to the POWER5 systemsCSerial connections to the POWER5 systemsDUSB connections for the keyboard and mouse
单选题A customer wants to install a pSeries system into an OEM rack. What critical information is provided in the Site and Hardware Planning Information manual?()ASystem dimensions and weight, system power and cooling requirements, and list of supported OEM racksBSystem dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racksCSystem performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racksDSystem dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A Identify which systems are the most critical and bring them up by level of importance.B Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C Identify the least critical systems and then power those systems on first.D Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
单选题关于POWER Systems和x系列服务器,下列陈述错误的是()APOWER Systems是UNIX小型机BX系列是X86服务器CX系列可以运行linux操作系统DPOWER Systems不可以运行linux操作系统
单选题我是一名IBM合作伙伴的销售代表,非常想通过掌握销售IBM POWER Systems 服务器来提升业绩,我可以做的是()A参加IBM 的市场活动,从中拿到最及时的讯息B找IBM 当地的Sales 谈一谈,了解IBM POWER Systems 渠道合作和奖励计划C浏览IBM 的中文网站,注册成为会员,免费得到电子资料D参加IBM POWER Systems 销售培训,学习产品销售知识E以上都可以
单选题与SUN SPARC Enterprise T5220相比,哪一款POWER Systems服务器性能即可胜出?()APOWER520即可B需要POWER550C需要POWER570D需要POWER595
多选题客户会在什么样的环境下用POWER Systems服务器?或者说什么样的客户需要POWER Systems服务器?()A对性能要求高B对稳定性要求高C作数据库服务器D作前端web服务器