吊机BLACK WIRE OVER RIDE操作,表示()A、松绳旁路B、向右转C、吊臂下降D、吊钩限位旁路
吊机BLACK WIRE OVER RIDE操作,表示()
- A、松绳旁路
- B、向右转
- C、吊臂下降
- D、吊钩限位旁路
相关考题:
Early jazz was identified by its polyrhythmic structure, a clearly contribution from the complex drumming of West Africa brought over to America by black slaves.() 此题为判断题(对,错)。
One advantage of chain over wire rope for a tow bridle is that chain ______.A.is better suited for inland towingB.resists damage from chafingC.handles more easilyD.equalizes towing forces better
In a DSL network,which device terminates the PPP over Ethernet subscriber’s two-wire phone line?() A.RASB.DSLAMC.ATMswitchD.RADIUSserver
During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。
The ()(吊货索套) at hatch No.1 is quite worn out.A、cargo lightB、lashing wireC、cargo slingD、wire rope
A ()(钢丝刷) should be used on all bare metal to remove the last of the scale.A、wire brushB、wire ropeC、wire rodD、wire rope clip
南航波音737-800发动机的吊点()A、前吊点在风扇机匣上,中吊点在HPC上B、前吊点在风扇机匣上,后吊点在HPC上C、前吊点在风扇机匣上,后吊点在PT机匣上D、前吊点在风扇机匣上,中吊点在HPT上
单选题The Coordinator Surface Search in a SAR situation should display by day().Athe code flags FRBa black ball over a black diamond shapeCcode flag Quebec over a black ballDtwo black diamond shapes in a vertical line
单选题A device fitted over the discharge opening on a relief valve consisting of one or two woven wire fabrics is called a().Aflame stopperBflame screenCflame filterDflame restrictor
单选题One advantage of chain over wire rope for a tow bridle is that chain().Ais better suited for inland towingBresists damage from chafingChandles more easilyDequalizes towing forces better
单选题During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()A在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。B在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。C在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。D在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。
单选题In a DSL network,which device terminates the PPP over Ethernet subscriber’s two-wire phone line?()ARASBDSLAMCATMswitchDRADIUSserver
单选题An advantage of nylon rope over manila is that nylon rope().Acan be used in conjunction with wire or spring-lay ropeBcan be stored on decks exposed to sunlightCcan hold a load even when a considerable amount of the yarns have been abradedDgives audible warning of overstress whereas manila does not
单选题What does the term end-for-end refer to in regard to a wire towing hawser().ACutting off the bitter and towing ends of the wire ropeBSplicing two wire ropes togetherCRemoving the wire rope from the drum and reversing it so that the towing end becomes the bitter endDRemoving the wire rope from the drum and turning it over so that the wire bends in the opposite direction when rolled on a drum
单选题During the day,a vessel with a tow over 200 meters in length will show().Aa black ballBa diamond shapeCtwo cones,apexes togetherDone cone,apex upward
单选题What is an advantage of having wire rope with a fiber core over that of a wire rope of the same size with a wire core().AFiber core rope offers greater strengthBFiber core rope offers greater flexibilityCFiber core rope can be used at higher operating temperaturesDFiber core rope is the only type authorized for cargo runners
单选题An advantage of nylon rope over manila rope is that nylon rope().Acan hold a load even when a considerable number of the yarns have been abradedBcan be stored on deck,exposed to sunlightCcan be used in conjunction with wire or spring-lay ropeDgives audible warning of overstress whereas manila does not
单选题A vessel is fishing at anchor on the high seas. Which of the following day signals should she display if she has gear extending out over 150 meters horizontally from the vessel?().AA black ball in the forepart of her vesselBA black double frustum of a coneCA basket where best seenDA black cone point upwards