单选题()belongs to emergency power supplying equipments.AEmergency fire pumpBWindlassCMain sea water pumpDFresh water pump

单选题
()belongs to emergency power supplying equipments.
A

Emergency fire pump

B

Windlass

C

Main sea water pump

D

Fresh water pump


参考解析

解析: 暂无解析

相关考题:

Cathodic protection involves supplying electrons to the metal to be protected from an external source. The external source maybe be an external _______ or by__________. A、dc power sourceB、Alternating Power SourceC、A Galvanic CoupleD、Cathode

For _______the power is supplied by main switchboard directly not through sub-boardA.saving network costB.improving the reliability of supplying power to important loadC.preventing sequence reversingD.increasing the power Factor of important load

Which of the following is the access level of a user that belongs to both the Administrators andUsers groups?() A. UserB. AdministratorC. Power UserD. Remote Desktop User

Which of the following is the access level of a user that belongs to both the Administrators andUsers groups?()A、UserB、AdministratorC、Power UserD、Remote Desktop User

Which of the following is not the emergency equipment?()A、Emergency power supply.B、Quick-close device.C、Emergency squad.D、derricks.

The emergency source of power for Mobile Offshore Drilling Units should be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the services specified in 5.3.6 of the 1989 MODU Code. Which one of the following service is not required to be supplied from the emergency power for a period of 18 hours?()A、Emergency lighting at every embarkation station on deck and over sidesB、Emergency lighting at the storage positions for firemen’s outfitsC、Fire and gas detection and their alarm systemD、Power to operate the watertight doors and their indicators

对于引起HO的原因,下面()描述是错误的。A、Better cell HOB、Emergency HOC、Low battery HOD、Power budget HO

对于引起HO的原因,下面哪些描述是正确的()。A、Better cell HOB、Emergency HOC、Low battery HOD、Power budget HO

Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()A、Turn off all electrical powerB、Remove all backup mediaC、Implement fire suppressionD、Evacuate all personnel

单选题Is extra power available()emergency while maneuvering?AforBinCduringDto

单选题()belongs to emergency power supplying equipments.ANavigation lampBWindlassCMain sea water pumpDCompressor

单选题Which emergency is required to be covered at the required periodic drills on a fishing vessel?()ARecovering an individual from the waterBSteering casualtyCEmergency towingDLoss of propulsion power

单选题After resolving the trouble of main power supply, main switch of emergency generator should(), if power supply is refreshed.Abe switched off by the duty officerBbe switched on by the duty officerCbe switched off automaticallyDbe switched on automatically

单选题Emergency generator is installed on board mainly to ()Aconnect to the busbar when the load increasingBsupply power specially to charging panelCbe put into operation during the ship arriving at or leaving portDensure the power supply to critical equipment after the main switchboard out of power

单选题Which()need NOT be entered in the Official Logbook?AThe testing of the internal combustion engine driven emergency generators at least once each month the vessel is navigatedBThe testing of storage batteries for emergency lighting and power systems once each 6 months the vessel is navigatedCThe actual draft when the vessel arrives in salt water after departing a portDThe testing of the line-throwing appliance once every 3 months

单选题Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?()AThe generator and bus transfer sectionBThe 450 volt, 60 cycle, 3 phase busCThe 120 volt, 3 phase, 60 cycle busDThe 24 volt DC bus

单选题The booster pump, which supplies diesel oil to() , should have a possibility of being powered by compressed air or by emergency power.Athe main enginesBthe auxiliary enginesCthe emergency generator engineDthe auxiliary engines and the main engine(s)

单选题Which of the following is not the emergency equipment?()AEmergency power supply.BQuick-close device.CEmergency squad.Dderricks.

单选题The emergency source of power for Mobile Offshore Drilling Units should be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the services specified in 5.3.6 of the 1989 MODU Code. Which one of the following service is not required to be supplied from the emergency power for a period of 18 hours?()AEmergency lighting at every embarkation station on deck and over sidesBEmergency lighting at the storage positions for firemen’s outfitsCFire and gas detection and their alarm systemDPower to operate the watertight doors and their indicators

单选题The alternating current generator supplying a load has a voltage drop resulted from the loadWhen the load has a lagging power factor this voltage drop ().Ais smallBmay be neglectedCis usefulDis considerable

单选题To () , the power is supplied by main switchboard directly not though sub-board.Asave network costBimprove the reliability of supplying power to important loadCprevent sequence reverseDincrease the power factor of important load

单选题A power failure in the hydraulic system of a compact type steering gear would cause the rudder to()Aswing 35°right or leftBremain locked in its last positionCmove to the mid-ship position automaticallyDjam against the rudder emergency stops

单选题() may have two emergency source of power, thus requiring two emergency switchboards.ALarge passenger vesselsBGeneral cargo shipsCContainer shipsDOil tankers

单选题()belongs to emergency power supplying equipments.Aargo winchBWindlassCSteering gearDAir compressor

单选题Cargo vessels being navigated,and fitted with emergency lighting and power systems,shall have their emergency systems tested at least once().Aa monthBin each weekCin every 6 monthsDin every 12 months

单选题On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().AdayBweekCmonthDyear

单选题Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()AOn the Certificate of InspectionBOn the Muster List (Station Bill)CIn the Operations ManualDIn either the official or unofficial log