单选题Efficient fire-fighting drill demands the full ()of persons in all departments of the ship.AoperateBoperationCco-operateDco-operation

单选题
Efficient fire-fighting drill demands the full ()of persons in all departments of the ship.
A

operate

B

operation

C

co-operate

D

co-operation


参考解析

解析: 暂无解析

相关考题:

The third officer is ___ (负责)the fire-fighting equipment.A.responsibleB.take charge ofC.in charge ofD.control

A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the ______.A.drill stem guideB.guide frameC.drill string frameD.casing guide

A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar

A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps

The Owners warrant that at the date of delivery and throughout the period of service the hull,machinery and equipment of the ship is in a thoroughly efficient state,with a full and efficient __________ of Master,Officers and Crew.A.ComplementB.SupplementC.DeploymentD.Settlement

At the required fire drill conducted aboard a vessel, all persons must report to their stations and demonstrate their ability to perform the duties assigned to them ______.A.by the tool pusherB.in the station billC.by the person conducting the drillD.at the previous safety meeting

Joe’s father,along with his two uncles,( )in London one more day.A.demand that he stayB.demands that he staysC.demands that he stayD.demand that he stays

A switch is configured with all ports assigned to vlan 2 with full duplex FastEthernet to segment existing departmental traffic. What is the effect of adding switch ports to a new VLAN on the switch?()A、More collision domains will be created.B、IP address utilization will be more efficient.C、More bandwidth will be required than was needed previously.D、An additional broadcast domain will be created.

The third officer is () (负责)the fire-fighting equipment.A、responsibleB、take charge ofC、in charge ofD、control

Chief, the ()(灭火队)is ready.A、fire bucket partyB、fire boatC、fire engineD、fire-fighting party

Efficient fire-fighting drill demands the full ()of persons in all departments of the ship.A、operateB、operationC、co-operateD、co-operation

()(除了) the fire drill, there are also boat drill and emergency drill on board.A、ExceptB、AlthoughC、In addition toD、But

drill()A、锉B、扳手C、钻D、凿子

单选题The main function of the drawworks on a ship is to().Atransport tubulars from the pipe racks to the derrick floorBmaintain constant tension on the marine riserCstore and secure the excess drill lineDlower and hoist the drill string into and out of the drilled hole

单选题The sailors are ()the leakage in fire-fighting and life-saving operations.Ablocking upBlooking upClooking outDtaking up

单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().Aheavy-walled drill pipeBtool jointCdown hole toolDdrill collar

单选题接待来船拜访人员。()AReceiving the person who comes on board to do their business.BReceiving the persons who comes on board to visit.CReceiving the persons who comes on board to do the job.DReceiving the persons who comes on board to look around the ship.

单选题Fire drill is carried out once a ().AyearBdayCweekDmonth

单选题The biggest advantage of this product is that ______.Ait will be faster and cheaper than manual laborBit can climb mountainsides, drill holes, insert bars and cementCit can collect data on the slope’ s stabilityDit can drill without a human being on board

单选题At the required fire drill conducted aboard a ship,all persons must report to their stations and demonstrate their ability to perform the duties assigned to them().Aby the toolpusherBin the station billCby the person conducting the drillDat the previous safety meeting

单选题机舱人员应启动机舱里的消防泵。()AEngine room persons should stop their pumps in machinery space.BEngine room persons should start their pumps in machinery space.CEngine room persons should start their pumps in officer’s cabin.DEngine room persons should start their pumps on boat deck.

单选题During the required periodic abandon ship drill aboard a ship,each person not assigned duties in the muster list is().Ainstructed in the use of portable fire extinguishersBshown a video demonstrating lifeboat launchingCinstructed in the use of life jacketsDnot required to attend the boat drill

单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().AliftsBcollarsCelevatorsDclamps

单选题The fire-fighting ()is ready.ApartyBpartCcrewDmembers

单选题A switch is configured with all ports assigned to vlan 2 with full duplex FastEthernet to segment existing departmental traffic. What is the effect of adding switch ports to a new VLAN on the switch?()AMore collision domains will be created.BIP address utilization will be more efficient.CMore bandwidth will be required than was needed previously.DAn additional broadcast domain will be created.

单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().Aclose and seal around the drill pipeBclose and seal around casingCcut off pipe inside the preventer stackDclose and seal around drill collars

单选题()(除了) the fire drill, there are also boat drill and emergency drill on board.AExceptBAlthoughCIn addition toDBut