单选题Procedures for the implementation of corrective action should be established by().AThe AdministrationBThe GovernmentCThe CompanyDThe Organization

单选题
Procedures for the implementation of corrective action should be established by().
A

The Administration

B

The Government

C

The Company

D

The Organization


参考解析

解析: 暂无解析

相关考题:

The cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:A Payment authorizationB Bid cost considerationsC Release paymentD Back chargeE None of the above.

Back charges refers to:A transferring charges from sub-contractors to the ownerB adjusting payments to reflect late invoices consequenceC the cost of corrective action taken by the owner and charged to the contractor for non-conformanceD gaining restitution from the owner for non paymentE C and D only

9 Back charges refers to:A. transferring charges from sub-contractors to the ownerB. adjusting payments to reflect late invoices consequenceC. the cost of corrective action taken by the owner and charged to the contractor for non-conformance D. gaining restitution from the owner for non paymentE. C and D only

114 The cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:A. Payment authorizationB. Bid cost considerationsC. Release paymentD. Back chargeE. None of the above

CDE is working. However, the customized PATH environment has not been implemented. Which of the following procedures should be performed to activate the implementation?() A.Update the .kshrc fileB.Edit $HOME/.dtprofile, and uncomment the DTSOURCEPROFILE=trueC.Copy /etc/.profile to $HOME/.dtprofile and edit the file as neededD.Double click on the System Administration icon and select CDE profile

请说明被审部门对内部评审所提出的“不符合规定事项”进行纠正措施(corrective action)的步骤。

CDE is working. However, the customized PATH environment has not been implemented. Which of the following procedures should be performed to activate the implementation?()A、Update the .kshrc fileB、Edit $HOME/.dtprofile, and uncomment the DTSOURCEPROFILE=trueC、Copy /etc/.profile to $HOME/.dtprofile and edit the file as neededD、Double click on the System Administration icon and select CDE profile

对一项在发生之前未界定的风险事件作出响应称作:()A、缓和风险响应。(risk mitigation response)B、权变措施。(workaround  response)C、纠正行动。(corrective  action response)D、应急响应。(contingency response)

Which item is the most important factor during deployment of high-availability features?()A、Test major changes before deployment and defer minor changes until during deployment. B、Document and verify rollback procedures.C、Ensure consistency of code versions across the network.D、Progressively modify procedures and documentation during implementation.

Which of the following is the MOST important consideration before making a change to a server?()A、Explore the ramification of the change before implementation.B、Determine the service level agreement in place before implementation.C、Review the equipment disposal procedures and policies before implementation.D、Notify all staff members of the planned system outage before implementation.

A business partner wants to identify risks, develop action plans to manage the risks, and confirm resources required for a successful implementation of a BladeCenter solution to their customer. Which addresses this situation of the following?()A、Conduct a TDAB、Use IBM System xConfiguratioin and Option Guide (COG)C、UsexREFD、Conduct aServerProven Opportunity Request for Evaluation (SPORE)

Which of the following procedures should be performed to minimize possible problems for a customer when updating software?()A、Apply the updates without committing.B、Commit the new updates to be certain there is no change after the next reboot.C、Update one fileset at a time and test to ensure that it works before updating the next fileset.D、No action is necessary since the software can always be uninstalled and re-installed.

An SSA disk that is part of the mirrored volume group needs to be replaced. Which of the following procedures should be performed before the disk is physically able to be replaced?()A、reducevg, rmdev, syncvg B、rmlvcopy, exportvg, rmdev C、rmlvcopy, reducevg, rmdev D、No action is required since SSA is a Hot Swap device and is mirrored

An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()A、Select the option to automatically reboot the HMCB、Select the option to automatically reboot the HMC after each diskC、Shutdown all managed LPARs prior to beginning the install processD、Copy all disks into the "SERVICE" directory and select concurrent install

An administrator is applying a corrective service to their HMC .The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()A、Select the option to automatically reboot the HMC .B、Select the option to automatically reboot the HMC after each disk.C、Shutdown all managed LPARs prior to beginning the install process.D、Copy all disks into the ""SERVICE"" directory and select concurrent install.

Given a new implementation, which of the following procedures should be used to determine a default gateway’s IP address?()A、The address will always end in 255.B、The address will always be the first interface’s IP addressC、The address will always be the network with a 1 as the final octet.D、It is important to consult with the network administrator prior to making assumptions regarding the default gateway’s IP addres

CDE is working. However, the customized PATH environment has not been implemented. Which of the following procedures should be performed to activate he implementation?()A、Update the .kshrc fileB、Edit $HOME/.dtprofile, and uncomment the DTSOURCEPROFILE=trueC、Copy /etc/.profile $HOME/.dtprofile and edit the file as neededD、Double click on the System Administration icon and select CDE profile

Which two statements regarding the Policy Framework in Enterprise Manager (EM) are correct?()A、Policy violations are prioritized as High, Medium, or Informational by category B、Policies can be disabled completely, or flagged as ignored, for the specified target C、Policies can be flagged as ignored, but never completely disabled, for the specified targetD、Policy violations must be corrected, otherwise the database will shut down until corrective action occurs

单选题Which of the following is the MOST important consideration before making a change to a server?()A Explore the ramification of the change before implementation.B Determine the service level agreement in place before implementation.C Review the equipment disposal procedures and policies before implementation.D Notify all staff members of the planned system outage before implementation.

单选题Given a new implementation, which of the following procedures should be used to determine a default gateway’s IP address?()AThe address will always end in 255.BThe address will always be the first interface’s IP addressCThe address will always be the network with a 1 as the final octet.DIt is important to consult with the network administrator prior to making assumptions regarding the default gateway’s IP addres

单选题Your vessel is damaged and is listing to port. The rolling period is short. There is sufficient freeboard so that deck edge submersion is not a problem. What corrective action should be taken FIRST in regard to the vessel’s stability?().APress up any slack double-bottom tanks to eliminate free surfaceBFlood any empty double-bottom tanks to add weight low and downCJettison topside weights to reduce KG and KBDShift any off-center weights from port to starboard

多选题Which two statements regarding the Policy Framework in Enterprise Manager (EM) are correct?()APolicy violations are prioritized as High, Medium, or Informational by categoryBPolicies can be disabled completely, or flagged as ignored, for the specified targetCPolicies can be flagged as ignored, but never completely disabled, for the specified targetDPolicy violations must be corrected, otherwise the database will shut down until corrective action occurs

单选题An SSA disk that is part of the mirrored volume group needs to be replaced. Which of the following procedures should be performed before the disk is physically able to be replaced?()Areducevg, rmdev, syncvg Brmlvcopy, exportvg, rmdev Crmlvcopy, reducevg, rmdev DNo action is required since SSA is a Hot Swap device and is mirrored

单选题When planning to access the on-line documentation from a remote client, which of the following procedures should be performed on the server?()AInstall and configure the HTTPServer. BAdd the name(s) of the client(s) to the httplite.conf file. CAdd the names of any clients expecting to access the documentation to the /etc/hosts file. DNo action is required.

单选题Before a Master relieves a Pilot of the conn,the ().AMaster should foresee any danger to the vessel on the present courseBvessel must be in extremisCMaster should agree to sign a release of liability formDMaster must first request the Pilot to take corrective action

单选题Which is the MOST important consideration before making a change to a server?()AExplore the ramification of the change before implementation.BDetermine the service level agreement in place before implementation.CReview the equipment disposal procedures and policies before implementation.DNotify all staff members of the planned system outage before implementation.

单选题You are attempting to create an Oracle-Managed Files (OMF) tablespace in a production database with the following statement and receive the following error message:   CREATE TABLESPACE tbsl;  ORA-02199: missing DATAFILE/TEMPFILE clause oerr ora 2199  02199, 00000, “missing DATAFILE/TEMPFILE clause”  *Cause: A CREATE TABLESPACE statement has no DATAFILE/TEMPFTLE clause.  *Action: specify DATAFILE/TEMPFILE clause.   What is the corrective action to create the OMF based tablespace?()A AB BC CD D