单选题The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in () of operation are immediately implemented.Aahead or asternBfore or aftCup or downDspeed or direction

单选题
The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in () of operation are immediately implemented.
A

ahead or astern

B

fore or aft

C

up or down

D

speed or direction


参考解析

解析: 暂无解析

相关考题:

When will an Engineer Officer in charge of watch call Chief Engineer?

At an unsheltered anchorage the chief engineer officer shall consult with_______whether or not to maintain an underway watchA.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate

STCW78/95 Convention states that the officer in charge of the engineering watch is the representativeA.ship-owner'sB.master'sC.chief engineer'sD.manager's

The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in ______of operation are immediately implemented(执行).A.ahead or asternB.fore or aftC.up or downD.speed or direction

The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A.shall take overB.shall not take overC.shall hand overD.shall not hand over

At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.A.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate

Maritime Administration personnel may be allowed in the pilothouse upon the responsibility of the ______.A.Chief OfficerB.NavigatorC.most senior person present from the Maritime AdministrationD.officer in charge of the watch

If at any time the officer in charge of the navigational watch is to be relieved when a manoeuvre or other action to avoid any hazard is taking place,______.A.the relief of that officer shall be made prior to such action has been completedB.the relief of that officer shall never be madeC.the relief of that officer shall be deferred until such action has been completedD.the relief of that officer shall be made by the captain

A qualified deck officer should be______the watch.A.in charge ofB.arrangedC.decided toD.the depth of

单选题Prior to taking over the deck watch in port,the relieving officer shall not be informed by the officer in charge of the deck watch as to().Athe depth of the water at the berthBthe ship‟s draughtCthe duty of the relieving officerDthe arrangement of anchor and the scope of the anchor chain

单选题STCW78/95 states that the office in charge of the engineering watch is the representative ().Aship-owner’sBmaster’sCchief engineer’sDmanager’s

单选题At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.Athe engineer officer in charge of watchBthe deck officer in charge of watchCthe masterDthe chief mate

单选题The officer in charge of the deck watch in port shall not().Amake rounds to inspect the ship at appropriate interalsBtake every precaution to prevent pollution of the environment by the shipCenter, in the bell book, all important events affecting the shipDoffer assistance to ships or person in distress

单选题The officer in charge of the engineering ()the watch to the reliving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.Ashall take overBshall not take overCshall hand overDshall not hand over

单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.Aas long asBunlessCdespiteDtill

单选题The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in () of operation are immediately implemented.Aahead or asternBfore or aftCup or downDspeed or direction

单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().Ain any emergency or if in any doubt as to what decision or measures to takeBin the event of any impending action in machinery spaces that may cause reduction in ship’s speedCwhen isolating and bypassing machinery to be worked onDco-operating with any engineer in charge of maintenance work

单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can immediately be placed in the () of operation when notified that the ship is in congested waters.Amanual modeBautomatic modeCremote modeDfollow-up mode

单选题When the ship is in restricted visibility, the officer in charge of the engineering watch shall ensure that () Ⅰ.Bridge order relating to changes in speed or direction of operation areimmediately implemented Ⅱ.auxiliary machinery used for maneuvering is readily available Ⅲ.permanent air or steam pressure is available for sound signalsAⅠ+ⅡBⅠ+ⅢCⅡ+ⅢDⅠ+Ⅱ+Ⅲ

单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()Acontinue to be responsible for machinery space operations despite the presence of the CEBhand over the responsibility activelyCbe responsible for the watching together with the chief engineerDassistant the chief engineer to control the machinery

单选题When the machinery spaces are in the periodic unmanned condition, shall be immediately available and on call to attend the machinery space().Athe chief engineerBthe designated engineer from shipyardCthe designated duty officer in charge of the engineering watchDthe designated surveyor from classification society

单选题The officer in charge of the navigational watch shall not hand over the watch to the relieving officer if().Athere is reason to believe that the latter is not capable of carrying out the watchkeeping duties effectivelyBthe ship is fitted with automatic steeringCthere is daylight or darknessDat no time shall the bridge be left unattended

单选题If in any doubt as to the pilot’s actions or intentions,the officer in charge of the navigational watch shall().Anotify the master immediatelyBtake whatever action is necessary before the master arrivesCtake necessary actions at his/her discretionDseek clarification from the pilot

单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()Aa watch which is kept with lower standardBa watch which is kept when the ship isnt sailingCa watch which is kept when the ship is sailingDa watch which is kept when the ship is in a restricted visibility area

单选题Which of the following shall not the officers in charge of the navigational watch do?()Acontinue to be responsible for the safe navigation of the shipBLeave the bridgeCKeep the watch on the bridgeDUse any available navigational aids necessary to ensure that the ship follows the planned course

单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can be immediately be placed in the manual mode of operation when notified that the ship is ()Aat anchorBat unsheltered anchorageCin congested watersDin an open road-stead

单选题A qualified deck officer should be()the watch.Ain charge ofBarrangedCdecided toDthe depth of

单选题The responsibilities of the engineer officer in charge of the watch do not include ()Ato ensure the main propulsion plant are kept under constant surveillanceBto ensure the auxiliary systems are kept under constant surveillanceCto inspect the steering gear spaces at suitable intervalsDto inspect and overhaul the equipments in his charge