名词解释题控制(Controlling)

名词解释题
控制(Controlling)

参考解析

解析: 暂无解析

相关考题:

_________[A] controlling [B] former [C] remaining [D] original

(b) Discuss how the operating statement you have produced can assist managers in:(i) controlling variable costs;(ii) controlling fixed production overhead costs. (8 marks)

______is not the tool name for quality controlling used in the figure below.A.Cause and Effect DiagramsB.Ishikawa DiagramsC.Fishbone DiagramsD.Scatter Diagram

__________ is the process of motivating a group of people towards achieving a common goal. A、PlanningB、OrganizingC、LeadingD、Controlling

下列关于Proj ECt Controlling模式的表述中,正确的是( )。A.Proj ECt Controlling方是业主的决策支持机构B.Proj ECt Controlling模式的核心是以工程的信息流指导和控制工程的物质流C.业主可以向ProjE Ct Controlling方的具体工作人员下达指令D.采用Proj ECt Controlling模式时,不再需要建设项目管理咨询单位的信息管理工作E.ProjE Ct Controlling模式是工程咨询与信息技术相结合的产物

Project Controlling与建设项目管理的不同之处是( )。A.工作属性B.工作内容C.控制目标D.控制原理

We must reduce the danger of war by controlling nuclear, chemical and () arms. A、accustomedB、usedC、conventionalD、adjusted

()is the process of documenting,analyzing,tracing,prioriiting on requirements and then controlling change and communicating to stakeholders it is a continuous process throughout a projectA.integratend managementB.configurationmanagemenC.scopemanagementD.requirementmanagement

A channel is started as having a controlling depth of 38 feet. Which statement is TRUE?_____A.At least 80% of the channel is cleared to the charted depth.B.At least 50% of the channel is cleared to the charted depth.C.100% of the channel depth is clear to 38 feet.D.The sides of the channel conform to at least 50% of the controlling depth.

作为Controlling的重要手段,源于会计系统的各种比率在企业控制中发挥着巨大作用,这些比率包括(  )。A:资产负债率B:流动比率C:速动比率D:合作率E:支持信息使用率

Project Controlling咨询单位直接向( )的决策层负责,相当于业主决策层的智囊,为其提供决策支持,业主不向Project Controlling咨询单位在该项目上的具体工作人员下达指令。A.设计单位B.业主C.分包单位D.监理单位

Project Controlling与建设项目管理的相同点是(  )。A.服务对象相同B.控制目标相同C.服务时间相同D.工作内容相同

Project Controlling与工程项目管理的地位不同,Project Controlling咨询单位为()服务。A.施工单位B.设计单位C.业主D.监理单位

Project Controlling 与工程项目管理服务的不同之处是()。A.工作属性B.工作内容C.控制目标D.控制原理

在多平面Project Controlling模式中,总Project Controlling机构对外服务于( )。A.专职安全生产管理人员B.施工管理负责人C.业主项目总负责人D.项目技术负责人

控制(Controlling)

负责新开店铺代码的系统创建是集团controlling(控制部)

负责店铺日常报销管理的是集团controlling(控制部)

单选题Which one of following statement is not true concerning the suitable sites of the direct acting relief valve and the pilot operated relieve valve?()Athe direct acting relief valve is used for controlling lower flows and pressureBthe pilot operated relief valve is used for controlling higher flows and pressureCthe pilot operated relief valve is used for controlling lower flows and pressureDthe controlling accuracy of direct acting relief valve is worse than that of the pilot operated relief valve

单选题Project Controlling 与建设项目管理的相同点是(  )。A工作内容相同 B控制原理相同 C权力相同 D服务时间相同

单选题What is the function of thermostatic expansion valve in a compression refrigeration system?()AnonexistentBfor controlling pressureCfor controlling superheatDfor controlling the solenoid valve

单选题Project Controlling与建设项目管理的相同点是( )。A服务对象相同B控制目标相同C服务时间相同D工作内容相同

单选题Project Controlling与工程项目管理的地位不同,Project Controlling咨询单位为()服务。A施工单位B设计单位C业主D监理单位

单选题How is “radio silence” imposed?()ABy the On Scene Coordinator (OSC)BBy the Coast Earth Station (CES) controlling the distress communications on that frequencyCIt is imposed by the Public Correspondence Station (PCS) controlling the distress communications on that frequency or channelDIt is imposed by the High Seas Service (HSS) controlling the distress communications on that frequency or channel

单选题Ship’s steering gear refers to().Acargo handling machinesBdeck winches and derricksCengine-room toolsDcourse controlling system

多选题关于项目总控模式的内涵,下列说法正确的有(  )。A将运用于企业管理的Controlling理论运用于建设项目管理,逐步形成了项目总控模式B控制者的主要任务是通过信息处理,计算各种比率,作为公司领导层决策的依据C项目总控模式是Controlling理论在建设项目实施中的应用D项目总控的工作内容超脱传统的日常项目管理业务E项目总控模式用资金流控制物质流

问答题简述Project Controlling模式的类型和应用中需注意的问题。