单选题The()defines the phases that connect the beginning of a project to its end.AscheduleBproject life cycleCtemporaryDmilestone

单选题
The()defines the phases that connect the beginning of a project to its end.
A

schedule

B

project life cycle

C

temporary

D

milestone


参考解析

解析: 该题的关键词为"phases",其语句结构为"______(主语)defines(谓语)the phases",含义为"什么定义了项目的多个阶段",通过筛选首先排除A和C,选项D也容易排除,因为Milestone(里程碑)只是关键点上发生的活动,不具备阶段的持续性特点,因而只能选择选项B。

相关考题:

PremierePro项目文件的扩展名是()。A.prprojB.premiereC.proD.proj

The(67)defines the phases that connect the beginning of a project to its end.A.scheduleB.project life cycleC.temporaryD.milestone

● 给定工程项目PROJ 和职工EMP 实体集,若一个职工可以参加多个项目,一个项目可以由多个职工参加,那么,PROJ 与EMP 之间应是一个 (57) 的联系。(57)A.1:1B.n: 1C.1:nD.m:n

下列关于Proj ECt Controlling模式的表述中,正确的是( )。A.Proj ECt Controlling方是业主的决策支持机构B.Proj ECt Controlling模式的核心是以工程的信息流指导和控制工程的物质流C.业主可以向ProjE Ct Controlling方的具体工作人员下达指令D.采用Proj ECt Controlling模式时,不再需要建设项目管理咨询单位的信息管理工作E.ProjE Ct Controlling模式是工程咨询与信息技术相结合的产物

下列选项中不会引起二义性的宏定义是( )。A.defineS(x)x*xB.defineS(x)(x)*(x)SXB 下列选项中不会引起二义性的宏定义是( )。A.#defineS(x)x*xB.#defineS(x)(x)*(x)C.#defineS(x)(x)*xD.#defineS(x)(x*x)

The (71) defines the phases that connect the beginning of a project to its end.A.milestoneB.scheduleC.temporaryD.project life cycle

创建新项目的命令是( )。A.CREATE NEW ITEMB.CREATE ITEMC.CREATE NEWD.CREATE PROJ ECT

下列选项中不会引起二义性的宏定义是( )。A.#defineS(x)x*xB.#defineS(x)(x)*(x)C.#defineS(x)(x*x)D.#defineS(x)((x)*(x))

The life cycle ofa project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,itis_( )A.devclopmentB.conceptC.system analysisD.implementation

The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).A.developmentB.conceptC.system analysisD.implementation

The passage offers information to answer which of the following questions?( ) A.What is a theme concerning art that appears in the final book of Remembrance of Things Past? B.Precisely when in 1909 did Proust decide to connect the beginning and the end of Remembrance of Things Past? C.What was the subject of the novel that Proust attempted in 1908? D.What specific criticisms of Saint-Beuve appear,in fictional form,in Remembrance of Things Past?

143、PremiereProCS3的项目文件的扩展名是()。A、prprojB、premiereC、proD、proj

PremiereProCS3的项目文件的扩展名是()A、prprojB、premiereC、proD、proj

Which of these is the best definition of the Cisco Lifecycle Services approach? Select exactly 1 answer(s) from the following:()。A、It defines the minimum set of services required to successfully deploy and operate a set of Cisco technologiesB、It determines how best to price Cisco productsC、It provides partners with a useful way to leverage Cisco resourcesD、It consists of these phases: plan, deploy, support, and troubleshoot

There are six phases of the Cisco Lifecycle Services framework. In which of the following phases would a proposal be developed and delivered?()A、PrepareB、OperateC、PlanD、Design

Premiere Pro CS3的项目文件的扩展名是().A、prprojB、premiereC、proD、proj

What is the result of issuing the frame-relay map ip 192.168.1.2 202 broadcast command?()A、defines the source IP address that is used in all broadcast packets on DLCI 202B、defines the DLCI that is used for all packets that are sent to the 192.168.1.2 IP addressC、defines the destination IP address that is used in all broadcast packets on DLCI 202D、defines the DLCI on which packets from the 192.168.1.2 IP address are received

There are six phases of the Cisco Lifecycle Services framework. During which of the following phases would the Acceptance Testing be developed and documented?()A、OperateB、DesignC、ImplementD、Prepare

Which three are the phases of the Cisco Smart Business Roadmap?()A、foundationB、optimizedC、implementedD、growthE、finishedF、beginning

The() defines the phases that connect the beginning of a project to its end.A、scheduleB、project life cycleC、temporaryD、milestone

When tuning a network module what is the purpose of the grace period?()A、It defines the maximum permissible time period between missed heartbeats before a failure is detectedB、It defines the time period to wait to activate the network module after starting the cluster managerC、It defines the period between detecting a missed heartbeat and initiating a network down, allowing thenetwork to stabilizeD、It defines the time period during which, after a network failure was detected, further network failures of thesame type will be ignored

What is the purpose of a zone in JUNOS Software?()A、A zone defines a group of security devices with a common management.B、A zone defines the geographic region in which the security device is deployed.C、A zone defines a group of network segments with similar security requirements.D、A zone defines a group of network segments with similar class-of-service requirements.

Which statement is true regarding IPsec VPNs?()A、There are five phases of IKE negotiation.B、There are two phases of IKE negotiation.C、IPsec VPN tunnels are not supported on SRX Series devices.D、IPsec VPNs require a tunnel PIC in SRX Series devices.

多选题What are three main phases of an attack?()ADoSBexploitCpropagationDport scanningEreconnaissance

单选题In context, which word or phrase is best inserted at the beginning of sentence 4 to connect it with the rest of the paragraph?ATo breed them,BAlthough,CAnd,DTo protect them,EAdditionally,

单选题What is the purpose of a zone in JUNOS Software?()AA zone defines a group of security devices with a common management.BA zone defines the geographic region in which the security device is deployed.CA zone defines a group of network segments with similar security requirements.DA zone defines a group of network segments with similar class-of-service requirements.

单选题When tuning a network module what is the purpose of the grace period?()AIt defines the maximum permissible time period between missed heartbeats before a failure is detectedBIt defines the time period to wait to activate the network module after starting the cluster managerCIt defines the period between detecting a missed heartbeat and initiating a network down, allowing thenetwork to stabilizeDIt defines the time period during which, after a network failure was detected, further network failures of thesame type will be ignored

单选题Which of these is the best definition of the Cisco Lifecycle Services approach? Select exactly 1 answer(s) from the following:()。AIt defines the minimum set of services required to successfully deploy and operate a set of Cisco technologiesBIt determines how best to price Cisco productsCIt provides partners with a useful way to leverage Cisco resourcesDIt consists of these phases: plan, deploy, support, and troubleshoot