单选题After "F.W.E" is given, the air system is shut down, the () gear put in, all drains and indicator cocks opened, and the cooling water kept running.AsteeringBtimingCturningDrunning

单选题
After "F.W.E" is given, the air system is shut down, the () gear put in, all drains and indicator cocks opened, and the cooling water kept running.
A

steering

B

timing

C

turning

D

running


参考解析

解析: 暂无解析

相关考题:

What is the function of the after-coolers installed in the diesel engine air intake system?A.Decrease the air densityB.Increase the exhaust temperatureC.Decrease the lube oil temperatureD.Increase the air density

The main propulsion diesel continues running after you try to shut down. You should now attempt to .A.stop the fuel oil booster pumpB.engage the jacking gearC.secure the lube oil pumpD.shut off the fuel at the settling tank

After installing a new hydraulic pump in a system, what special attention should be given to the hydraulic system?A.The relief valves in the system should be readjustedB.The filters and strainers should be checked frequentlyC.All system pressure should be readjustedD.The system should be drained and renewed with a fluid of different operating characteristics

When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should ______.A.secure all ventilationB.shut down the exhaust blowersC.shut down the intake blowersD.ventilate the cargo holds

If ______ is shut down for an extended time optimum position fixing will take up to 2 hours after power is reapplied.A.radarB.DFC.Satellite NavigatorD.Automatic Omega Navigator

After completion, an original copy of the air waybill is given to the()as evidence of the acceptance of goods and as proof of contract of carriage.A、shipperB、carrierC、freight forwarderD、consignee

Which tasks can NOT be performed at the management console if the Client ID is being used?()A、Reboot the HMCB、Access the storage managerC、Shut down the consoleD、Access the storage system diagnostics

A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()A、Add or remove the resources in the profile, click 'apply', then 'save'.B、Add or remove the resources using DLPAR and change the partition profile.C、Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.D、Add or remove the resources in the system profile and reboot the managed system.

Two data files have been deleted at the operating system level by accident. Your database is running in ARCHIVELOG mode and online backups are taken nightly. One of the data files that has been deleted belongs to the USERS tablespace on the other belongs to the SYSTEM tablespace. How can you recover from this situation?()A、Shut down the database, restore the two data files and then start up the database. B、Take the system and users tablespace offline, restore the two data files, recover the two datafiles, and then bring the SYSTEM and USERS tablespaces online. C、Shut down the database, restore the two data files, start up the database in MOUNT mode, recover the two data files, and then alter the database open. D、Take the SYSTEM and USERS tablespaces offline, recover the two datafiles and then bring the SYSTEM and USERS tablespaces online.

单选题To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()ASpeed limiting governorBOver-speed governorCOver-speed tripDOver-speed relay

单选题When operating the air supply system in a covered lifeboat the().Afuel supply valve should be closedBhatches,doors,and oar ports should be closedCair cylinder shut-off valve should be closedDengine should be shut off

单选题If()is shut down for an extended time optimum position fixing will take up to 2 hours after power is reapplied.AradarBDFCSatellite NavigatorDAutomatic Omega Navigator

单选题After the order “()” is given, the air system is shut down, the turning gear put in.AFinished with EngineBStop the EngineCStand-by EngineDSlow-down Engine

单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.

单选题While maneuvering, you discover heavy smoke coming from the turbocharger casing, you should ()Acheck the air filter for dirtBcheck for an exhaust leakCcheck the cooling water temperatureDnotify the bridge that you are going to shut the engine down

单选题After installing a new hydraulic pump in a system, what special attention should be given to the hydraulic system?()AThe relief valves in the system should be readjustedBThe filters and strainers should be checked frequentlyCAll system pressure should be readjustedDThe system should be drained and renewed with a fluid of different operating characteristics

单选题Which of the following problems could cause the high pressure cutout switch to shut down the compressor in a refrigeration system?()AA shortage of liquid refrigerantBExcessive frost on the evaporatorCExcessive condenser cooling waterDInsufficient condenser cooling water flow

单选题You have three production databases, HRDB, FINDB, and ORGDB, that use the same ASM instance. At the end of the day, you execute the following command on the ASM instance to shut down: SQL shutdown immediate; What is the result of executing this command?()AAll the instances, including the ASM instance, are shut down in the ABORT modeBThe ASM instance is shut down, but the other instances are still running CThe ASM instance is still functional, but the other instances are shut down DAll the instances, including the ASM instance, are shut down in the IMMEDIATE mode. EHRDB, FINDB, and ORGDB instances are shut down in the ABORT mode and the ASM instance is shut down in the IMMEDIATE mode FHRDB, FINDB, and ORGDB instances are shut down in the NORMAL mode and the ASM instance is shut down in the IMMEDIATE mode

单选题An emergency diesel generator should automatically shut down in the event of ()Adangerous over-speedingBa loss of lube oil pressureCactivation of the fixed CO2 system for the emergency generator spaceDall of the above

单选题After the order “()” is given, the air system is shut down, the turning gear put in, all drains and indicator cocks opened, and the cooling water and lubricating oil systems kept running.AStand-by EngineBStop EngineCFinished With EngineDDead Slow Ahead

单选题After received the “finished with engine” instruction, which of the following operations is false?()Ashut off the starting air receiver outlet valveBstop the FO priming transfer pump and shut off the correspondence inlet and outlet valveCstop the SW pump immediately and shut off the correspondence inlet and outlet valveDstop the FW pump immediately and shut off the correspondence inlet and outlet valve

单选题An automated diesel engine should normally shut down due to ()Alow lube oil temperatureBhigh ambient air temperatureClow tube oil pressureDhigh exhaust system back pressure

单选题After finished the engine, which of valves cannot be shut off by the duty engineer?()Afuel valveBthe starting air valveCthe sea chestDthe main sea pump inlet valve

单选题Adequate attention must be given to the water cooling system of the air compressors, for () can cause condensation on the cylinder walls.AovercoolingBpoor coolingCoverloadingDunloading

单选题When an engine is starting and has got a sufficiently high speed, say about 20 rpm,()Athe starting air supply is cut off and fuel is injected into the cylindersBthe fuel feeding is cut off and the turning gear is put inCthe starting air supply is cut off and turning gear is taken outDthe electric blower is shut down and fuel is injected into the cylinders

单选题The main propulsion diesel continues running after you try to shut downYoushould now attempt to()Astop the combustion air supplyBengage the jacking gearCsecure the lube oil pumpDshut off the fuel at the day tank

单选题What is the function of the after-cooler installed in the diesel engine air intakes system?()ADecrease the air densityBIncrease the exhaust temperatureCDecrease the lube oil temperatureDIncrease the air density