单选题A company has recently upgraded all backup hardware and media from DLT IV to LTO3 tapes and tape drives. Several weeks after the upgrade, the development team discovers a corruption in one of the application servers and must restore from one of the DLT IV tapes.  Which of the following steps arenecessary for the server administrator to use these tapes?()A Reformat the DLT IV tape in LTO3 format. Load the tape.B Install the DLT IV driver on the LTO3 drive. Load the tape.C Load the DLT IV tape into the LTO3 drive.D Replace the LTO3 drive with a DLT IV tape drive. Load the tape.

单选题
A company has recently upgraded all backup hardware and media from DLT IV to LTO3 tapes and tape drives. Several weeks after the upgrade, the development team discovers a corruption in one of the application servers and must restore from one of the DLT IV tapes.  Which of the following steps arenecessary for the server administrator to use these tapes?()
A

 Reformat the DLT IV tape in LTO3 format. Load the tape.

B

 Install the DLT IV driver on the LTO3 drive. Load the tape.

C

 Load the DLT IV tape into the LTO3 drive.

D

 Replace the LTO3 drive with a DLT IV tape drive. Load the tape.


参考解析

解析: 暂无解析

相关考题:

— You are the manager of the marketing department in your company. A new assistant manager has recently been appointed and will start work soon.— Write an email to all staff in the department:— explaining the need for the appointment— saying when the assistant manager will start work— describing the experience the assistant manager has.— Write 40 - 50 words.From: Candace WoodwardTo: All marketing staffSubject: New assistant manager

A company has recently received a new ADSL backup Internet connection. Which of the followingwill MOST likely be used between the modem and the ISP?() A.PPPoEB.RASC.IPSecD.MSCHAP

A company has recently upgraded all backup hardware and media from DLT IV to LTO3 tapes and tape drives. Several weeks after the upgrade, the development team discovers a corruption in one of the application servers and must restore from one of the DLT IV tapes.  Which of the following steps arenecessary for the server administrator to use these tapes?()A、 Reformat the DLT IV tape in LTO3 format. Load the tape.B、 Install the DLT IV driver on the LTO3 drive. Load the tape.C、 Load the DLT IV tape into the LTO3 drive.D、 Replace the LTO3 drive with a DLT IV tape drive. Load the tape.

A System p administrator needs to document system changes that have occurred recently. The company has a policy of making all possible changes via the smit interface.  Which of the following files would show the commands that have been performed from within smit and their resulting output()A、/smit.logB、/smit.scriptC、/var/log/smit.logD、/.history

While reviewing the backup logs a server administrator notices that a backup job for an application server on the same subnet has failed. Which of the following is MOST likely the problem?()A、The remote agent was not running.B、The management card has failed.C、The proxy server was blocking access.D、The hardware firewall was blocking access.

Which of the following is the MOST important reason for referencing the HCL?()A、 To ensure that all hardware being used has previously been testedB、 To ensure that all hardware being used has the latest firmwareC、 To ensure that all hardware being used is the most energy efficientD、 To ensure that all hardware being used can be upgraded in the future

A company has recently received a new ADSL backup Internet connection. Which of the followingwill MOST likely be used between the modem and the ISP?()A、PPPoEB、RASC、IPSecD、MSCHAP

A customer reports to Karen, a technician, that a PC’s video card has recently been upgraded and the computer reboots randomly. The last few restarts have happened during movie playback, playing a video game, and video editing. Which of the following is the MOST likely source of this issue?()A、The card is not compatible with the hardware of the machine.B、The graphic driver for the card is corrupt.C、The video card requires additional power.D、The software the user is running is incompatible for the video card.

A company has just implemented a disaster recovery plan in which critical business must be restored in a four hour window.  Which of the following methods should be used to backup theservers?()A、Incremental backupB、Data only backupsC、SAN replicationD、Full backup

A SAN attached production file server is required to be backed up nightly according to company  policy.Recently the data to be backed up has increased to approximately 4TB. Currently, the server has a single attached LTO2 tape drive.  Which of the following should the server administrator do to provide enough backup capacity for the nightly job? ()A、 Replace the backup software with a more efficient application.B、 Reduce the amount of data to be backed up.C、 Replace the LTO2 tape drive with an LTO3 tape drive.D、 Replace the single tape drive with a tape library.

A server has 500GB of data that must be backed up nightly. The administrator has upgraded the oldLTO2 drive to an LTO3, but the data still will not fit on a single tape.  Which of the following additional stepsshould the administrator perform to accommodate the data?()A、 Enable compression on the new driveB、 Reformat all tapesC、 Delete unnecessary system filesD、 Purchase LTO3 tapes for use in the new driveE、 Purchase new backup software

Company.com recently experienced an unanticipated system outage when the VIO server was upgraded. The current p5-570 has six Micro-Partitions and a VIO server partition. How can a similar outage be avoided in the future?()A、Use DLPAR to avoid an outage.B、Deploy a redundant VIO server in the POWER5 system.C、Add additional Host Bus Adapters and Network adapters to the VIO server.D、Implement a standby server and move all partitions to it before applying future updates.

The sales team has just sold the first pSeries solution to a Windows NT customer.   The team has identified concerns with a non-existent backup strategy and some workable environmental issues.   In addition to these concerns,what other major concern should be considered?()A、Customer skill levelB、Hardware availabilityC、Lack of executive sponsorshipD、Hardware and software compatibility

A company has recently placed an order for a POWER4+ p650 server.   Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server.   They have requested a picture of the power cord plug to show to their electrician.  Where would the pSeries technical specialist find the required information?()A、Sales ManualB、Announcement LetterC、POWER4+ p650 Specification SheetD、Site and Hardware Planning Information Manual

What does it mean if a backup is expired?()A、The backup set has exceeded the retention criteria set in RMAN and is eligible for removal. B、The backup set has one or more invalid blocks in it and is not usable for recovery. C、The backup set contains one or more tablespaces no longer in the database.  D、The backup set contains one or more missing backup set pieces.E、The backup set is from a previous version of RMAN and was not upgraded.

You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last weekly backup. You need to minimize the amount of time taken to restore the data in the event of a hardware failure. What should you do? ()(Choose two)()A、Perform a normal backup every week.B、Perform a copy backup every week.C、Perform a differential backup every week.D、Perform an incremental backup every weekE、Perform a normal backup every day.F、Perform a copy backup every day.G、Perform a differential backup every day.H、Perform an incremental backup every day.

You are the network administrator for Company. Company has recently upgraded its network to a 100Mbps standard and you are now in the process of removing all the old adapter and installing a new Token Ring network adapter into the Windows 2000 Professional computer. On the first computer you install the new hardware and configure the static TCP/IP protocol settings to be the same as they were for the previously installed network adapter. When you restart the computer, however, you cannot access the network. You try to ping your network adapter's TCP/IP address locally. You receive the following error message: "Request timed out." You want to enable the computer to communicate on the new network. What should you do? ()A、Enable DHCP in the TCP/IP properties.B、Replace the Token Ring network adapter with an Ethernet network adapter.C、Configure a different TCP/IP address on the same subnet.D、Configure a valid DNS Server in the TCP/IP properties.

单选题You work as a network Exchange administrator at Company.com.The Company.com network currently consists of a single Active Directory forest named Company.com containing three sites named KingSite1, KingSite2 and KingSite3.The Company.com organization makes use of Microsoft Exchange Server 2007 Service Pack 1 (SP1) as their messaging solution.Company.com has additionally configured each site with two Client Access server, Mailbox server and Hub Transport Server.During the course of the business week you receive instruction from Company.com to install Microsoft Exchange Server 2010 in KingSite1 whilst ensuring that you use the least amount of administrative effort.What should you do?()AYou should consider having all Exchange servers in the organization upgraded to Microsoft Exchange Server 2007 Service Pack 2 (SP2).BYou should consider having all Exchange servers in KingSite1 and all Client Access servers in the organization upgraded to Microsoft Exchange Server 2007 Service Pack 2 (SP2).CYou should consider having all Client Access servers in the organization upgraded to Microsoft Exchange Server 2007 ServicePack 2 (SP2)DYou should consider having all Exchange servers in KingSite1 upgraded to Microsoft Exchange Server 2007 ServicePack 2 (SP2).

单选题While reviewing the backup logs a server administrator notices that a backup job for an application server on the same subnet has failed. Which of the following is MOST likely the problem?()AThe remote agent was not running.BThe management card has failed.CThe proxy server was blocking access.DThe hardware firewall was blocking access.

单选题A technician works for a company that has recently been affected by a virus. The virus entered the network by using port 6000. Port 6000 is used by an application located on a server. The technician has been asked to block this port on all servers and computers except for the one server which uses this port. Which of the following should the technician do?()AUpdate the antivirus applicationBInstall critical update security patchesCAdjust the software firewall settingsDReplace the current antivirus program

单选题A company has a policy that states that all servers will be fully backed up on the weekend.Additionally, all changed items will be backed up each night. In the event of a server failure, the administrator wants to be able to fully recover the system using two restore jobs. Which of the following backup levels should be used nightly?()AIncrementalBNormalCDifferentialDFull

单选题What does it mean if a backup is expired?()A The backup set has exceeded the retention criteria set in RMAN and is eligible for removal. B The backup set has one or more invalid blocks in it and is not usable for recovery.C The backup set contains one or more tablespaces no longer in the database.D The backup set contains one or more missing backup set pieces.E The backup set is from a previous version of RMAN and was not upgraded.

单选题Recently, Jim has lost all his_______.Awage and saving at cardBwage and savings at cardCwages and saving at cardDwages and savings at cards

单选题A SAN attached production file server is required to be backed up nightly according to company  policy.Recently the data to be backed up has increased to approximately 4TB. Currently, the server has a single attached LTO2 tape drive.  Which of the following should the server administrator do to provide enough backup capacity for the nightly job? ()A Replace the backup software with a more efficient application.B Reduce the amount of data to be backed up.C Replace the LTO2 tape drive with an LTO3 tape drive.D Replace the single tape drive with a tape library.

单选题A customer reports to Karen, a technician, that a PC’s video card has recently been upgraded and the computer reboots randomly. The last few restarts have happened during movie playback, playing a video game, and video editing. Which of the following is the MOST likely source of this issue?()AThe card is not compatible with the hardware of the machine.BThe graphic driver for the card is corrupt.CThe video card requires additional power.DThe software the user is running is incompatible for the video card.

多选题You are the administrator of the TestKing company network. The network consists of a single Active Directory domain named The network includes 20 member servers running Windows Server 2003 and 4 domain controllers running Windows Server 2003. All client computers run Windows XP Professional. A member server named TestKingSrvA functions as a file server. TestKingSrvA has a locally attached tape device. You need to create a backup schedule for TestKingSrvA. All data on TestKingSrvA must be backed up once a week. Every day, you need to back up only the data that was changed after the last weekly backup. You need to minimize the amount of time taken to restore the data in the event of a hardware failure. What should you do? ()(Choose two)()APerform a normal backup every week.BPerform a copy backup every week.CPerform a differential backup every week.DPerform an incremental backup every weekEPerform a normal backup every day.FPerform a copy backup every day.GPerform a differential backup every day.HPerform an incremental backup every day.

单选题Which of the following is the MOST important reason for referencing the HCL?()A To ensure that all hardware being used has previously been testedB To ensure that all hardware being used has the latest firmwareC To ensure that all hardware being used is the most energy efficientD To ensure that all hardware being used can be upgraded in the future