单选题When loading or unloading baled cargo on board,the straps()to lift or drag the bales.Aare forbiddenBare allowedCcan be usedDare usually used
单选题
When loading or unloading baled cargo on board,the straps()to lift or drag the bales.
A
are forbidden
B
are allowed
C
can be used
D
are usually used
参考解析
解析:
暂无解析
相关考题:
The time of voyage insurance with cargo on board will,in accordance with PICC Clauses, commence from the time of ________ .A.unmooring at port of sailingB.weighing anchor at port of sailingC.loading at port of sailingD.sailing from port of sailing
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch
The port State control officer will ensure that ______ is performed by all crude carriers either required to have a crude oil washing system or where the owner or operator chooses to install a crude oil washing system.A.cargo loading operationsB.cargo unloading operationsC.cargo control operations in the transportD.crude oil washing
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition
When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list
在船上应当日出时升起国旗。()A、On board national flags should be hoisted when the sun sets.B、On board national flags should be hoisted when the sun rises.C、On board national flags should be lowered when the ship is in port.D、On board national flags should be hoisted flag when loading and discharging
Get ready the mooring machinery, mooring lines and the gangway for ().A、loading cargoB、arrival in portC、departure from portD、unloading cargo
单选题The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().Aafter its arrival at the destinationBduring the ship's voyage at seaCbefore they come to the dockDduring the time when the loading or diacharging is going on
单选题Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().Aa subsequent temperature rise will cause the cargo to overflowBair pockets may cause the cargo to bubble out of the ullage holeCthe increased viscosity of the product requires higher loading pressure which increases the chances of a spillDthe tank valve may be stiff and a spill will occur before the valve can be closed
单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().Aremove an existing list that would slow down cargo operationsBinitiate loading in conjunction with unloading at the hatchCimprove stability during cargo operationsDallow longshoremen easy access to the hatch
单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().Athe port of destinationBthe next port of callCthe port of arrivalDthe last port of call
单选题在船上应当日出时升起国旗。()AOn board national flags should be hoisted when the sun sets.BOn board national flags should be hoisted when the sun rises.COn board national flags should be lowered when the ship is in port.DOn board national flags should be hoisted flag when loading and discharging
单选题A ship is responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBafter the cargo is checked by tallymenCas soon as the cargo loading or unloading beginsDduring the time when loading or unloading is going on
单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()AAny internal transfer of oil cargo during a voyageBThe discharge overboard in port or at sea of any bilge water accumulated in machinery spacesCThe loading or unloading of any or all oil cargoDAll of the above
单选题The ship will be responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBduring the time when loading or unloading is going onCafter the cargo is checked by tallymenDas soon as loading or discharging begins
单选题The ship will be responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBduring the time when loading or ynloading is going onCafter the cargo is checked by tallymenDas soon as loading or discharging begins
单选题The term Loading and unloading Cargo means().Aarranging cargoBshipping cargoCcargo handlingDweighing cargo
单选题The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().Athe port of destinationBthe next port of callCthe port of arrivalDthe last port of call
单选题When the seller pays for all charges up to an including the loading of a consignment on board the carrying vessel, the term is ().ADDUBFCACFOBDCIF
单选题Bonding cables are used during cargo transfer to().Aprovide safe electrical power connection to barge equipmentBkeep the vessel from surging excessivelyCprevent an accidental discharge of static electricityDsecure the cargo hose to a hatch when loading overall
单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().Aprovide the proper trimBprevent negative stability from developingCprevent excessive longitudinal stressesDcontrol list