单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()AA power module has failed and there is not enough power to see video on all blades.BMUX 3 on theBladeCenter backplane has failed.CA firmware update is required on the AMM.DA second AMM is required to view video on blades 9-14.
单选题
A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()
A
A power module has failed and there is not enough power to see video on all blades.
B
MUX 3 on theBladeCenter backplane has failed.
C
A firmware update is required on the AMM.
D
A second AMM is required to view video on blades 9-14.
参考解析
解析:
暂无解析
相关考题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A、12 B、10 C、8 D、6
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer
A customer has purchased an IBM BladeCenter H chassis and needs the following servers: --Two HS21 blade servers each with 8GB memory and 2 drives --Two HS21 blade servers each with 24GB memory and 2 drives --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives How many total server bays will be required for this configuration?()A、6B、8C、10D、12
A customers has asked you to investigate their current x86 server environment to determinate if they can achieve a reduction in power and rack consumption. They plan to implement VMware and the local storage shared. Which of the following consolidation proposals meets these needs?()A、BladeCenter SB、BladeCenter HC、BladeCenter ED、BladeCenter HT
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()A、Send the customer information on VMwareB、Send the customer information on IBM BladeCenter C、Call the customer to ask why they are consolidatingD、Send the customer information on IBM System P
A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()A、SATA internal disksB、iSCSIC、Solid State StorageD、SAS Internal Disk
A manufacturing customer wants a consolidation solution that provides scale-out capability and the highest processor density per rack unit. Which of the following solution meets customer’s requirement?()A、x3650 M3 with Microsoft Virtual ServerB、BladeCenter JS43 with VMwareC、x3850 X5 with VMwareD、BladeCenter HS22V with VMware
A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()A、VirtualizationB、Replace each server with energy efficient serversC、Upgrade in place to improve performanceD、Implement BladeCenter
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()A、Fiber Channel Switch ModuleB、Gb Ethernet expansion cardC、Myrinet Cluster expansion cardD、Ethernet Switch Module
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which is causing the problem of the following?()A、Copper Pass-thru Modules only support 1000Mb line speeds.B、Spanning Tree has been enabled on the Copper Pass-thru Module.C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module.D、The customer is using LS21 Blades
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()AAn IBM BladeCenter H chassis for the JS22 Blade serversBA concurrent KVM daughter cardCA pair of IBM BladeCenter Power SuppliesDA second Management Module
单选题A customer has a BladeCenter H chassis with a single AMM. The AMM is defective. Which of the following is the method to backup the existing AMM so the new AMM automaticlally picks up the configuration? ()ABack up the AMM configuration to a file BBack up the AMM configuration to the chassis CBack up the AMM using IBM Systems Director DBack up the AMM using Tivoli Storage Manager
单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.
单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()A4B3C2D8
单选题A Customer has Director V5 installed and is considering Systems Director V6. They ask how BladeCenter Configuration Manager works with this new version. Which of the following is the correct answer? ()AThis was replaced by Configuration Manager for V6 BThis must be upgraded to BladeCenter Open Fabric Manager (BOFM) for V6 CThis is common to both V5 and V6, no change is required DAutomation Manager must be used in V6
单选题Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()ARemote Supervisor Adapter II (RSA II Slimline)BManagement Module, which comes standard on the BladeCenterCAcoustic Attenuation ModuleDEthernet NICs
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()ASupport for10Gb internal networkBSupport for SSDCSupport for integrated disk drivesDSupport for8Gb FC Switch Modules
多选题A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()AInstall the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra coolingBEnsure a 260V power source for the x445 and BladeCenter is available for fully redundant powerCEnsure a 220v power source for the x445 is available for fully redundant powerDInstall the new 10GBit Ethernet network to take advantage of the new network switch in the x445.EHave their Network Operation Staff review and assist connecting the new server to their existing network.
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A6B8C10D12
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A12 B10 C8 D6
单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()ACopper Pass-thru Modules only support 1000Mb line speeds. BSpanning Tree has been enabled on the Copper Pass-thru Module. CThe customer does not have the latest firmware loaded on the Copper Pass-thru Module. DThe customer is using LS21 Blades