单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()ACopper Pass-thru Modules only support 1000Mb line speeds. BSpanning Tree has been enabled on the Copper Pass-thru Module. CThe customer does not have the latest firmware loaded on the Copper Pass-thru Module. DThe customer is using LS21 Blades
单选题
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
A
Copper Pass-thru Modules only support 1000Mb line speeds.
B
Spanning Tree has been enabled on the Copper Pass-thru Module.
C
The customer does not have the latest firmware loaded on the Copper Pass-thru Module.
D
The customer is using LS21 Blades
参考解析
解析:
暂无解析
相关考题:
During the implement phase, systems acceptance testing provides which two of the following services for the customer()A、It installs, configures, and verifies monitoring tools and processes in accordance with the operations implementation.B、It verifies that the Cisco Unified Communications solutions is ready for production.C、It verifies that the Cisco Unified Communications solution meets their business and technical requirements.D、It executes and verifies the migration plan by migrating network services from an existing state to a future state.E、It provides automated tools for measuring system performance under load.
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT
retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()A、Is the web content static or dynamic information B、Consider two servers for redundancy and failover C、What is the average CPU utilization of the existing web servers D、Will the servers need a SCSI or Fibre Channel storage solution
A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request?()A、Brocade Enterprise 20-port 8Gb SAN switch module B、Brocade 20-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter share C、Brocade Enterprise 10-port 8Gb SAN switch module D、Brocade 10-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()A、Add Rear Door HeateXchangerB、Add fans to the top of the racksC、Increase circulation from Data Center raised floorD、Change to perforated doors
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()A、One 50 GB SATA 1.8 inch SSDB、Two 73GB 10K SAS HDD SFFC、Two 31 GB SATA 2.5 inch SSDD、Two 50GB SATA 1.8 inch SSD
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()A、Send the customer information on VMwareB、Send the customer information on IBM BladeCenter C、Call the customer to ask why they are consolidatingD、Send the customer information on IBM System P
A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()A、SATA internal disksB、iSCSIC、Solid State StorageD、SAS Internal Disk
A manufacturing customer wants a consolidation solution that provides scale-out capability and the highest processor density per rack unit. Which of the following solution meets customer’s requirement?()A、x3650 M3 with Microsoft Virtual ServerB、BladeCenter JS43 with VMwareC、x3850 X5 with VMwareD、BladeCenter HS22V with VMware
A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()A、Consider two servers for redundancy and failoverB、Web content static or dynamic informationC、Processor utilization of the existing web serversD、SCSI orFibre Channel storage solution
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D、The blade servers do not work with the Optical Pass-Thru Module.
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()A、Add Rear Door Heat eXchanger B、Add fans to the top of the racks C、Increase circulation from Data Center raised floor D、Change to perforated doors
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which is causing the problem of the following?()A、Copper Pass-thru Modules only support 1000Mb line speeds.B、Spanning Tree has been enabled on the Copper Pass-thru Module.C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module.D、The customer is using LS21 Blades
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()AAn IBM BladeCenter H chassis for the JS22 Blade serversBA concurrent KVM daughter cardCA pair of IBM BladeCenter Power SuppliesDA second Management Module
单选题A customer has a BladeCenter H chassis with a single AMM. The AMM is defective. Which of the following is the method to backup the existing AMM so the new AMM automaticlally picks up the configuration? ()ABack up the AMM configuration to a file BBack up the AMM configuration to the chassis CBack up the AMM using IBM Systems Director DBack up the AMM using Tivoli Storage Manager
单选题retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()AIs the web content static or dynamic information BConsider two servers for redundancy and failover CWhat is the average CPU utilization of the existing web servers DWill the servers need a SCSI or Fibre Channel storage solution
单选题Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()ARemote Supervisor Adapter II (RSA II Slimline)BManagement Module, which comes standard on the BladeCenterCAcoustic Attenuation ModuleDEthernet NICs
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()ASupport for10Gb internal networkBSupport for SSDCSupport for integrated disk drivesDSupport for8Gb FC Switch Modules
多选题A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()AInstall the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra coolingBEnsure a 260V power source for the x445 and BladeCenter is available for fully redundant powerCEnsure a 220v power source for the x445 is available for fully redundant powerDInstall the new 10GBit Ethernet network to take advantage of the new network switch in the x445.EHave their Network Operation Staff review and assist connecting the new server to their existing network.
单选题A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request of the following?()ABrocade Enterprise 20-port 8Gb SAN switch moduleBBrocade 20-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenterCBrocade Enterprise 10-port 8Gb SAN switch moduleDBrocade 10-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A6B8C10D12
单选题A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()ABladeCenter EBBladeCenter HCBladeCenter TDBladeCenter HT
多选题During the implement phase, systems acceptance testing provides which two of the following services for the customer()AIt installs, configures, and verifies monitoring tools and processes in accordance with the operations implementation.BIt verifies that the Cisco Unified Communications solutions is ready for production.CIt verifies that the Cisco Unified Communications solution meets their business and technical requirements.DIt executes and verifies the migration plan by migrating network services from an existing state to a future state.EIt provides automated tools for measuring system performance under load.