● The (75) process analyzes the effect of risk events and assigns a numerical rating to those risks.A.Risk IdentificationB.Quantitative Risk AnalysisC.Qualitative Risk Analysis.Risk Monitoring and Control

Sensitivity analysis can be used in risk analysis to:A Substitute for uncertainty analysis in risk quantificationB estimate the level of risk aversion adopted by managementC estimate the effect of change of one project variable on the overall projectD A and BE All of the above.

157 Sensitivity analysis can be used in risk analysis to:A. Substitute for uncertainty analysis in risk quantificationB. estimate the level of risk aversion adopted by managementC. estimate the effect of change of one project variable on the overall projectD. A and BE. All of the above

The( )process ascertains which risks have the potential of affecting the project and documenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control

The()process analyzes the effect of risk events and assigns a numerical rating to those risks.()A.Risk Identification B.Quantitative Risk AnalysisC.Qualitative Risk Analysis D.Risk Monitoring and Control

The ( ) process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring anD.Control

( ) Assesses the priority of identified risks using their probability of occurring,the corresponding impact on project objectives if the risks do occur,as well as other factors such as the time frame and risk tolerance of the project constraints of cost,schedule,scope,and quality. A.Quantitative Risk Analysis B.Qualitative Risk Analysis C.Enterprise Environmental Factors D.Risk Management Plan

Pest Risk Analysis(PRA)

Which of the following is the best reason for the use of an automated risk analysis tool?下列哪个是使用自动化的风险分析工具最好的理由?()A、Automated methodologies require minimal training and knowledge of risk analysis.自动化方法需要最小限度的风险分析知识培训B、Most software tools have user interfaces that are easy to use大部分软件工具有易于使用的用户界面C、Information gathering would be minimized and expedited due to the amount of information built into the tool.由于工具内置了大量的信息,信息收集过程将会缩减和加速D、Much of the data gathere dduring the review cannot be reused for subsequent analysis.在评估期间大部分被收集的数据不能被重用为后续分析

有害生物风险分析(PRA)

有害生物风险分析的国际标准:《有害生物()》ISPMs2、《()风险分析准则》ISPMs11、《()有害生物风险分析准则》、《()(GMO)风险分析》、《潜在的经济重要性和相关术语解释与应用指南》、《()》 。

什么是有害生物风险分析?

风险分析(risk analysis)是包含三个部分的一个过程,即()、()、()。

危险性有害生物(限定的有害生物,regulated pest)

检疫性有害生物(quarantine pest)

有害生物风险分析地区

有害生物风险分析

有害生物风险分析的必要性(为什么要进行PRA)?

有害生物风险分析(Pest Risk Analysis,PRA)

有害生物(Pest)

名词解释题危险性有害生物(限定的有害生物,regulated pest)

填空题风险分析(risk analysis)是包含三个部分的一个过程,即()、()、()。

名词解释题Pest Risk Analysis(PRA)

名词解释题检疫性有害生物(quarantine pest)

填空题有害生物风险分析的国际标准:《有害生物()》ISPMs2、《()风险分析准则》ISPMs11、《()有害生物风险分析准则》、《()(GMO)风险分析》、《潜在的经济重要性和相关术语解释与应用指南》、《()》 。

名词解释题有害生物(Pest)

问答题什么是PRA?有害生物风险分析的国际标准有哪些?