单选题Which of the following components channels air flow through a server chassis?()A FanB Heat sinkC ShroudD Radiator
单选题
Which of the following components channels air flow through a server chassis?()
A
Fan
B
Heat sink
C
Shroud
D
Radiator
参考解析
解析:
暂无解析
相关考题:
Which of the following problems can occur if you continually fail to drain off condensate from a starting air receiver?A.Corrosion and eventual failure of the tankB.Gumming of the tank relief valvesC.Immediate failure of components downstream of the compressed air systemD.Boiling of the water oil mixture as pressure is reduced
Which of the following cable types is rated to be run through air ducts?() A.STPB.PlenumC.PVCD.UTP
Which of the following ensures that air is passed through a server chassis correctly?() A. U-size templatesB. Phase changersC. BafflesD. Molex connectors
After a server has been installed into a rack, an administrator must ensure which of the following?() A. Warm air flow is permitted through the front bezelB. The system is labeled so that it can be identifiedC. Verify the change control process can be implementedD. Determine the correct power requirements
Which of the following BEST describes a DAS?() A. A collection of disks presented as storage to multiple servers through dedicated channels.B. A collection of disks presented as storage to a single server through an existing network.C. A collection of disks presented as storage to a single server through directly attached technologies.D. A collection of disks presented as storage to multiple servers through an existing network.
题干材料:Due to the large amount of heat picked up by the air in boiler and engine rooms, it would be impracticable to maintain ambient conditions within the comfort zone by air conditioning or any other means. The normal practice is to provide copious mechanical ventilation; in boiler rooms, the quantity is equated to the combustion requirements, while in a motor ship engine room the supply may be 25-50% in excess of the requirements of the engines.The axial flow fan is particularly suited to handle these large air volumes at the moderate pressures required, while of course the “straight-through” flow feature places it at an advantage over the centrifugal fan.The increasing adoption of automation, with the provision of a separate control room makes less significant the fact that comfort conditions cannot be maintained in the engine room all the time.问题:Which of the following devices should be taken to maintain ambient conditions of the boiler and machinery space?A.air compressorB.air coolerC.air-conditioning plantD.mechanical ventilation plantIn a motor vessel, the air quantity which the engine room need is_______ of the requirements of the engines.A.less than 25-50%B.more than 125-150%C.more than 25-50%D.less than 125-150%According to this passage, which of the following statements is true?A.In boiler and machinery spaces, there is the air conditioningB.In the boiler rooms the requirement of air volume should meet 25-50% of combustion requirementC.To maintain the comfort zone in the separate control room the air conditioning plant should be fittedD.The comfort conditions can be maintained in the engine room all the timeAt the middle pressure and large air quantity,_________ is more suitable.A.an axial flow fanB.a radial flow blowerC.a centrifugal fanD.an auxiliary blower请帮忙给出每个问题的正确答案和分析,谢谢!
On a Cisco network, which of the following modes of flow control are commonly used to mitigate the effects of busy data networks?()A、Source Quench.B、Learning.C、Buffering.D、Windowing.E、Cut-Through.
When conducting an Assisted Site Survey, the WLSE does which of the following during the Radio Scan process?()A、chooses the least congested channelB、uses the configured channelC、sets all access points to the same channelD、steps through each of the allowed channels
After a server has been installed into a rack, an administrator must ensure which of the following?()A、Warm air flow is permitted through the front bezelB、The system is labeled so that it can be identifiedC、Verify the change control process can be implementedD、Determine the correct power requirements
Which of the following BEST describes a DAS?()A、A collection of disks presented as storage to multiple servers through dedicated channels.B、A collection of disks presented as storage to a single server through an existing network.C、A collection of disks presented as storage to a single server through directly attached technologies.D、A collection of disks presented as storage to multiple servers through an existing network.
Which of the following channels air flow through a server chassis?()A、FansB、DuctsC、Heat sinksD、Condensers
Which of the following ensures that air is passed through a server chassis correctly?()A、U-size templatesB、Phase changersC、BafflesD、Molex connectors
Which of the following multimeter settings should only be used when there is no electrical flow through the part being tested? ()(Select TWO).A、AmpereB、ContinuityC、VoltD、ResistanceE、Wattage
Which of the following cable types is rated to be run through air ducts?()A、STPB、PlenumC、PVCD、UTP
Which of the following components channels air flow through a server chassis?()A、 FanB、 Heat sinkC、 ShroudD、 Radiator
单选题Propulsion engines and the vast majority of auxiliary generator engines are designed to allow a generous through-flow of scavenge air in order to control ()Athe lubricating oil consumptionBthe turbine blade temperatureCthe flow rate of fuelDscavenge air pressure
单选题After a server has been installed into a rack, an administrator must ensure which of the following?()AWarm air flow is permitted through the front bezelBThe system is labeled so that it can be identifiedCVerify the change control process can be implementedDDetermine the correct power requirements
多选题On a Cisco network, which of the following modes of flow control are commonly used to mitigate the effects of busy data networks?()ASource Quench.BLearning.CBuffering.DWindowing.ECut-Through.
单选题Which of the following methods is used to prevent throttling of compressed air through the diesel engine air starting valves?()AHolding the valve open for a long periodBIncreasing the starting air pressure usedCOpening the stating air valve quicklyDReducing the starting air valve size
单选题The most serious effect of air trapped in a diesel engine jacket water cooling system is that it().Acauses colloid suspension in the cooling waterBreduces the capability of the lubrication systemCcan form pockets which block the flow of coolant through the systemDleads to the scuffing of cylinder walls
单选题Which statement is TRUE concerning the gooseneck().AIt is a sailing maneuver which brings the vessel's head through the windBIt connects the boom to the mast and allows the boom to swing freelyCIt is a sailing condition where there is a loss of air flow over the sailsDNone of the above
单选题Which of the following statements concerning fire-tube boilers is correct?()ACombustion gases flow through the tubesBFlames impinge on the tubesCCombustion occurs in the tubesDWater flows through the tubes
单选题Which of the following problems could cause air to blow out through the inlet air filter of a running compressor?()AExcessive compression in the cylinderBA broken intake valveCA dirty inlet filter elementDAn improperly adjusted discharge valve
单选题Which of the following BEST describes a NAS?()AA collection of disks presented as storage to a single server through an existing network.BA collection of disks presented as storage to a single server through directly attached technologies.CA collection of disks presented as storage to multiple servers through dedicated channels.DA collection of disks presented as storage to multiple servers through an existing network.
多选题Which of the following multimeter settings should only be used when there is no electrical flow through the part being tested? ()(Select TWO).AAmpereBContinuityCVoltDResistanceEWattage
单选题Which of the following methods is normally used to control the temperature of air distributed from individual cooling coils in an air conditioning system using a chilled water circulation system?()AA room thermostat activates an electric heater at each individual chilled air outlet when necessaryBVarying the number of passes the air makes across the coilsCVarying the temperature of the water through the coilsDVarying the quantity of water flowing through the coils
单选题Which of the following components channels air flow through a server chassis?()A FanB Heat sinkC ShroudD Radiator
单选题Which of the following problems can occur if you continually fail to drain off condensate from a starting air receiver?()ACorrosion and eventual failure of the tankBGumming of the tank relief valvesCImmediate failure of components downstream of the compressed air systemDBoiling of the water oil mixture as pressure is reduced