单选题Topping wires fix the height of the derricks and () to the deck may be used to prevent fore and aft movement.AstaysBwinchesCbarrelsDbrakes

单选题
Topping wires fix the height of the derricks and () to the deck may be used to prevent fore and aft movement.
A

stays

B

winches

C

barrels

D

brakes


参考解析

解析: 暂无解析

相关考题:

Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.A.PreventersB.Side ropesC.StaysD.Guide lines

Who usually adjust the derricks during the loading and discharging?

How many derricks are there at each hold?

Lower down and secure all derricks.

What does “evel-luffing” accomplish during crane operations ________.A.It prevents the load from swinging when the boom level is adjustedB.Less power is needed when topping the boom with a load on the hookC.It maintains the height of the load above the deckD.All of the above

For a floating vessel, the result of subtracting KG from KM is the ______.A.height of the metacenterB.height of the righting armC.height of the center of buoyancyD.metacentric height

很多船上在每个舱口处都有两个吊杆及两台起货机。()A、Many ships have two derricks at each hatch.B、Many ships have two winches at each hatch.C、Many ships have two derricks and two winches at each hatch.D、Many ships have two derricks and two winches at each hatch cover.

我们每航次拆卸一次吊杆。()A、We dismantle the jumbo boom twice a voyage.B、We dismantle the derricks once a voyage.C、We examine the derricks once a voyage.D、We dismantle the heavy derricks once a voyage.

()are used to clean the bridge.A、RagsB、RatsC、RubbishD、Derricks

数据结构与算法里,变量height要比原来少15,则应写成()A、height-15B、height=15C、height=-15D、height-=15

This cargo wires has more than ten percent () wires.A、damagedB、brokenC、missingD、repaired

滑车()A、guyB、tackleC、topping liftD、block

船舶离港之前,所有的吊杆必须纵向收放好。()A、Before leaving the harbour, all derricks must be stowed.B、After leaving the harbour, all derricks must be stowed fore and aft.C、Before leaving the harbour, all derricks must be stowed fore and aft.D、Before leaving the harbour, all heavy derricks must be stowed fore and aft.

The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires

集装箱是由龙门吊装卸。()A、Containers are loaded and discharged by gantry cranes.B、Cases are loaded and discharged by gantry cranes.C、Cases are loaded and discharged by heavy derricks.D、Containers are loaded and discharged by heavy derricks.

以下各表达式中,计算结果为0的是().A、INT(12.4)+INT(-12.6)B、CINT(12.4)+CINT(-12.6)C、FIX(13.6)+FIX(-12.6)D、FIX(12.4)+FIX(-12.6)

Which of the following BEST describes CAT5e?()A、Contains four pair of wires of various gaugeB、Contains two wires in a red fireproof jacketC、Contains four twisted pairs of wiresD、Contains eight wires within a thick jacket with a rip cord

从中间定位点或点至最后进近定位点之间的航段。()A、The segment between the intermediate fix and the last approach fix.B、The segment between the middle fix and the last approach fix.C、The segment between the middle fix and the final approach fix.D、The segment between the intermediate fix and the final approach fix.

单选题船舶离港之前,所有的吊杆必须纵向收放好。()ABefore leaving the harbour, all derricks must be stowed.BAfter leaving the harbour, all derricks must be stowed fore and aft.CBefore leaving the harbour, all derricks must be stowed fore and aft.DBefore leaving the harbour, all heavy derricks must be stowed fore and aft.

单选题A flounder plate,on a topping lift,is().Aa fairlead blockBa swivel pin for the topping lift blockCa triangular steel plate with a hole at each cornerDthe lower block of a multiple part topping lift

单选题The cargo gear includes().Aderrick, winches, cargo ropes and wiresBderricks, windlass, capstanChatch covers, derricks, windlassDcranes, hatches, lashing wires

单选题Please swing the derricks to ().AbridgeBshore sideCdeckDengine room

单选题我们每航次拆卸一次吊杆。()AWe dismantle the jumbo boom twice a voyage.BWe dismantle the derricks once a voyage.CWe examine the derricks once a voyage.DWe dismantle the heavy derricks once a voyage.

单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).AA capstanBA holdCA warp endDA mooring drum

单选题opes or wires attached to derricks to prevent them from swinging during cargo handling operations are().APreventersBSide ropesCStaysDGuide lines

单选题What does “evel-luffing” accomplish during crane operations().AIt prevents the load from swinging when the boom level is adjustedBLess power is needed when topping the boom with a load on the hookCIt maintains the height of the load above the deckDAll of the above

单选题很多船上在每个舱口处都有两个吊杆及两台起货机。()AMany ships have two derricks at each hatch.BMany ships have two winches at each hatch.CMany ships have two derricks and two winches at each hatch.DMany ships have two derricks and two winches at each hatch cover.