单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()AFree up one HMC and update the software for use with the p5 570BConnect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCCOrder a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570DBackup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

单选题
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
A

Free up one HMC and update the software for use with the p5 570

B

Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC

C

Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570

D

Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software


参考解析

解析: 暂无解析

相关考题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()A.An additional switch for the new HMCB.Asynchronous adapters on the new HMCC.The two 570 servers are directly connected to the new HMCD.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc  B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc  D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、Asynchronous adapters on the new HMCC、The two 570 servers are directly connected to the new HMCD、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A、New install of AIXB、Migrate the 7040-61DC、Utilize alt_disk_installD、Use the enterprise back up strategy

A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on theD、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A、An 8-port adapter to the HMCB、A hub for the private networkC、An additional Ethernet card to the HMCD、An additional Ethernet card for each partition

Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

The account executive is asking about post-sales support for a new p5 HMC.  They need the pSeries technical specialist to configure an HMC with software support for the customer.  Which of the following should the specialist include in the configuration?()A、SupportlineB、ServiceSuiteC、Software Maintenance Agreement (SWMA)D、Machine Control Program Remote Support Agreement (MCPRSA)

Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A、Include a new HMC in the order to connect to the p5 595B、Include a pair of new HMCs in the order to connect to the p5 595C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A、Implement a proxy server to provide multiple sources to one destination B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C、Purchase a network hub or switch so both p5 570s can connect to the single HMC D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A、Explain to the customer that they need an additional HMC for the POWER5 system.B、Obtain a PO from the customer to purchase additional serial connections to the HMC.C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()ATelnet into the machine and do a shutdown -FrBLog into ASMI as Administrator and use ASMI menusCLog into the service processor using WebSM and use ASMI menusDUse the off button which is located to the left below the LEDs

单选题Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()AInclude a new HMC in the order to connect to the p5 595BInclude a pair of new HMCs in the order to connect to the p5 595CInclude a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesDInclude a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMCBAsynchronous adapters on the new HMCCThe two 570 servers are directly connected to the new HMCDOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()AAn 8-port adapter to the HMCBA hub for the private networkCAn additional Ethernet card to the HMCDAn additional Ethernet card for each partition

单选题A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()AImplement a proxy server to provide multiple sources to one destination BPurchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two CPurchase a network hub or switch so both p5 570s can connect to the single HMC DPurchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()APurchase a second HMC and use this to manage the new servers.BConnect all of the new servers to the existing private HMC network.CConfigure a second private network on their existing HMC for the new servers.DConnect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()AAn 8-port adapter to the HMCBA hub for the private networkCAn additional Ethernet card to the HMCDAn additional Ethernet card for each partition

单选题A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()AOrder a new HMC to support the p5 system.BAttach the new p5 system to the existing HMC.CUpgrade the existing HMC to accommodate both the POWER4 and p5 systems.DDo nothing.  This system does not require an HMC.

单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()AFree up one HMC and update the software for use with the p5 570BConnect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCCOrder a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570DBackup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()ANew install of AIXBMigrate the 7040-61DCUtilize alt_disk_installDUse the enterprise back up strategy

单选题Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC. What is the probable cause?()AAPV key is not registeredBNetworking and DNS are not configuredC/etc/hosts table on HMC is not configuredDVirtual IO Server dose not support DLPAR