单选题Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().Aone hourBtwo hoursCten hoursDfour hours

单选题
Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().
A

one hour

B

two hours

C

ten hours

D

four hours


参考解析

解析: 暂无解析

相关考题:

A mobile offshore drilling unit must display obstruction lights when it is on the waters over the Outer Continental Shelf and is ______.A.under towB.fixed to the seabedC.underwayD.All of the above

A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?A.When the towing vessel enters the fogB.When the drilling rig enters the fogC.When the towing vessel can no longer be seen from the rigD.Immediately

A mobile offshore drilling unit will show the day-shape in DIAGRAM 10 to indicate that it is ______.A.at anchorB.being towedC.agroundD.drilling

A report of casualty to a mobile offshore drilling unit must be made in writing to which office?A.Commandant of the Coast GuardB.Owner of the unitC.Nearest Coast Guard Marine Safety OfficeD.Captain of the nearest port

When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he ______.A.becomes responsible for the safe movement of the rigB.relieves the Offshore Installation Manager at the moment the rig is free from the bottomC.must be designated as the person in charge of the rigD.is a specialist who is hired to provide advice and guidance on aspects of the move

In the case of an injury causing a person to be incapacitated,the Master or person in charge of a mobile offshore drilling unit must submit a report to the ______.A.nearest Marine Safety or Marine Inspection OfficeB.nearest hospitalC.Department of EnergyD.American Bureau of Shipping

An offshore drilling unit is required to carry on board an operations manual approved by the ______.A.Coast GuardB.National Cargo BureauC.Minerals Management ServiceD.builder

An offshore drilling unit must be equipped with a first aid kit approved by the ______.A.Coast GuardB.American Bureau of ShippingC.Minerals Management ServiceD.Mine Safety and Health Administration

According to the regulations for mobile offshore drilling units,"industrial personnel" are considered to be all persons carried on the ship for the sole purpose of carrying out the industrial business of the unit,except for ______.A.the operator's representativeB.the crew required by the Certificate of InspectionC.the galley personnelD.the designated person in charge

To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the ______.A.load line certificateB.Operations ManualC.Safety of Life at Sea CertificateD.Certificate of Inspection

The emergency source of power for Mobile Offshore Drilling Units should be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the services specified in 5.3.6 of the 1989 MODU Code. Which one of the following service is not required to be supplied from the emergency power for a period of 18 hours?()A、Emergency lighting at every embarkation station on deck and over sidesB、Emergency lighting at the storage positions for firemen’s outfitsC、Fire and gas detection and their alarm systemD、Power to operate the watertight doors and their indicators

单选题A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()AWhen the towing vessel enters the fogBWhen the drilling rig enters the fogCWhen the towing vessel can no longer be seen from the rigDImmediately

单选题A report of casualty to a mobile offshore drilling unit must be made in writing to which office? ()ACommandant of the Coast GuardBOwner of the unitCNearest Coast Guard Marine Safety OfficeDCaptain of the nearest port

单选题On offshore drilling units,each EPIRB or SART must be tested once every().AdayBweekCmonthDyear

单选题An offshore drilling unit is required to carry on board an operations manual approved by the ().ACoast GuardBNational Cargo BureauCMinerals Management ServiceDbuilder

单选题A mobile offshore drilling unit will show the day-shape in DIAGRAM 10 to indicate that it is ().Aat anchorBbeing towedCagroundDdrilling

单选题When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he().Abecomes responsible for the safe movement of the rigBrelieves the Offshore Installation Manager at the moment the rig is free from the bottomCmust be designated as the person in charge of the rigDis a specialist who is hired to provide advice and guidance on aspects of the move

单选题Under the regulations implementing MARPOL, a mobile offshore drilling unit is required to have an International Oil Pollution Prevention (IOPP) certificate when the unit ().Ais drilling on the Outer Continental ShelfBmoves to a new drilling location in U-SwatersCengages in a voyage to a port of another country which is a party of MARPOLDAll of the above

单选题A mobile offshore drilling unit must display obstruction lights when it is on the waters over the Outer Continental Shelf and is().Aunder towBfixed to the seabedCunderwayDAll of the above

单选题In the case of an injury causing a person to be incapacitated,the Master or person in charge of a mobile offshore drilling unit must submit a report to the().Anearest Marine Safety or Marine Inspection OfficeBnearest hospitalCDepartment of EnergyDAmerican Bureau of Shipping

单选题To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the().Aload line certificateBOperations ManualCSafety of Life at Sea CertificateDCertificate of Inspection

单选题A report of casualty to a mobile offshore drilling unit must include ().Athe estimated cost of damage to the unitBan evaluation of who was at faultCthe amount of ballast on boardDthe name of the owner or agent of the unit

单选题An offshore drilling unit must be equipped with a first aid kit approved by the().ACoast GuardBAmerican Bureau of ShippingCMinerals Management ServiceDMine Safety and Health Administration

单选题The emergency source of power for Mobile Offshore Drilling Units should be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the services specified in 5.3.6 of the 1989 MODU Code. Which one of the following service is not required to be supplied from the emergency power for a period of 18 hours?()AEmergency lighting at every embarkation station on deck and over sidesBEmergency lighting at the storage positions for firemen’s outfitsCFire and gas detection and their alarm systemDPower to operate the watertight doors and their indicators

单选题The International Regulations for Preventing Collisions at Sea contain the requirements for ().Alights that must be displayed on anchor buoysBthe display of load line markingsCminimum horsepower for tugs involved in rig movesDlighting of mobile offshore drilling units being towed

单选题On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().AdayBweekCmonthDyear

单选题On a ship,each emergency generator must be tested at least once each().AweekBmonthCthree monthsDsix months