单选题A technician needs to add network capacity. However, when plugging a second switch into the first switch, there is no link light. Which of the following is the cause of this situation?()AThe switches are not stackableBThe cable was not wired using 568ACThe cable needs to be a crossover cableDThe switches have IGMP snooping enabled
单选题
A technician needs to add network capacity. However, when plugging a second switch into the first switch, there is no link light. Which of the following is the cause of this situation?()
A
The switches are not stackable
B
The cable was not wired using 568A
C
The cable needs to be a crossover cable
D
The switches have IGMP snooping enabled
参考解析
解析:
暂无解析
相关考题:
A technician needs to manage a switch by using the management port on the back of the switch.Which of the following cables would the technician use?() A.StraightB.ConsoleC.CrossoverD.Loopback
An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?() A. Battery needs to be replacedB. Light switch is turned offC. Smart cable is disconnectedD. UPS needs a firmware update
A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?() A. The switch port link lights will be off on both switches indicating the ports are not connected.B. The switch port link light will be off on one switch indicating that STP has disabled the port.C. The switch port link lights will flash amber indicating an error.D. The switch port link lights will be green indicating normal operation.
A network administrator needs to force a high-performance switch that is located in the MDF to become the root bridge for a redundant path switched network. What can be done to ensure that this switch assumes the role as root bridge()。A.Establish a direct link from the switch to all other switches in the network.B.Assign the switch a higher MAC address than the other switches in the network have.C.Configure the switch so that it has a lower priority than other switches in the network.D.Configure the switch for full-duplex operation and configure the other switches for half-duplex operation.E.Connect the switch directly to the MDF router, which will force the switch to assume the role of root bridge.
A technician needs to manage a switch by using the management port on the back of the switch.Which of the following cables would the technician use?()A、StraightB、ConsoleC、CrossoverD、Loopback
A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()A、The switch port link lights will be off on both switches indicating the ports are not connected.B、The switch port link light will be off on one switch indicating that STP has disabled the port.C、The switch port link lights will flash amber indicating an error.D、The switch port link lights will be green indicating normal operation.
While troubleshooting a network connectivity problem, a technician observes steady link lights on both the workstation NIC and the switch port to which the workstation is connected. However, when the ping command is issued from the workstation, the output message "Request timed out." is displayed. At which layer of the OSI model does the problem most likely exist()。A、the session layerB、the protocol layerC、the data link layerD、the access layerE、the network layerF、the application layer
A user on a network cannot access any network resources. The link light on the computer showsthat a connection is present. Which of the following is the MOST likely cause of the problem?()A、The wrong cable type has been used.B、. IDS has shut down the computer's switch port.C、The port on the switch is configured incorrectlyD、Spanning tree protocol was implemented.
A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()A、CAT3 cableB、Serial cableC、Crossover cableD、Rollover cable
A technician needs to add network capacity. However, when plugging a second switch into the first switch, there is no link light. Which of the following is the cause of this situation?()A、The switches are not stackableB、The cable was not wired using 568AC、The cable needs to be a crossover cableD、The switches have IGMP snooping enabled
A user is unable to connect to the network. A network technician is able to determine that there is a problem on the switch. All other users on that switch are able to connect successfully to the network. Which of the following is a probable cause?()A、Switching loop is occurring on the switch.B、Wrong subnet mask on the switch.C、Incorrect SNMP settings on the switch.D、Port is misconfigured on the switch.
A technician needs to find an end of a network cable drop. Which of the following tools would the technician use?()A、Cable testerB、MultimeterC、Toner probeD、Loopback plug
An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()A、Battery needs to be replacedB、Light switch is turned offC、Smart cable is disconnectedD、UPS needs a firmware update
When testing a CAT5 cable, the technician notices that pin A is open. However, the cable stillworks fine. Which of the following describes how this is possible?()A、The cable was tested for 100Base-TX.B、The cable is a 1000BaseT cable.C、The switch uses link aggregation,D、The switch was setup to use MDIX
单选题An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()ABattery needs to be replacedBLight switch is turned offCSmart cable is disconnectedDUPS needs a firmware update
单选题A user has just moved a PC from one office to another. The patch cable and the NIC do notappear to be functioning in the new office but were working before the move. The patch cable is plugged in correctly to both the NIC and the wall jack. Which of the following actions should the technician take FIRST?()AVerify that the network card is compatible with the operating system.BVerify that the port on the switch is enabled.CUpdate the network card driver.DReplace the network cable with a crossover cable.
单选题A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()AThe switch port link lights will be off on both switches indicating the ports are not connected.BThe switch port link light will be off on one switch indicating that STP has disabled the port.CThe switch port link lights will flash amber indicating an error.DThe switch port link lights will be green indicating normal operation.
单选题A network administrator needs to force a high-performance switch that is located in the MDF to become the root bridge for a redundant path switched network. What can be done to ensure that this switch assumes the role as root bridge()。AEstablish a direct link from the switch to all other switches in the network.BAssign the switch a higher MAC address than the other switches in the network have.CConfigure the switch so that it has a lower priority than other switches in the network.DConfigure the switch for full-duplex operation and configure the other switches for half-duplex operation.EConnect the switch directly to the MDF router, which will force the switch to assume the role of root bridge.
单选题A technician needs to find an end of a network cable drop. Which of the following tools would the technician use?()ACable testerBMultimeterCToner probeDLoopback plug
单选题A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()ACAT3 cableBSerial cableCCrossover cableDRollover cable
单选题A user on a network cannot access any network resources. The link light on the computer showsthat a connection is present. Which of the following is the MOST likely cause of the problem?()AThe wrong cable type has been used.B. IDS has shut down the computer's switch port.CThe port on the switch is configured incorrectlyDSpanning tree protocol was implemented.
单选题A technician is troubleshooting a laptop LCD, and when the cover is opened nothing shows on the screen. Then all of a sudden the screen comes on and works fine. Which of the following should the technician check FIRST?()ABacklightBInverterCLoose cableDLid switch
单选题A technician needs to add network capacity. However, when plugging a second switch into the first switch, there is no link light. Which of the following is the cause of this situation?()AThe switches are not stackableBThe cable was not wired using 568ACThe cable needs to be a crossover cableDThe switches have IGMP snooping enabled
单选题A technician needs to manage a switch by using the management port on the back of the switch.Which of the following cables would the technician use?()AStraightBConsoleCCrossoverDLoopback
单选题When testing a CAT5 cable, the technician notices that pin A is open. However, the cable stillworks fine. Which of the following describes how this is possible?()AThe cable was tested for 100Base-TX.BThe cable is a 1000BaseT cable.CThe switch uses link aggregation,DThe switch was setup to use MDIX
单选题A user is unable to connect to the network. A network technician is able to determine that there is a problem on the switch. All other users on that switch are able to connect successfully to the network. Which of the following is a probable cause?()ASwitching loop is occurring on the switch.BWrong subnet mask on the switch.CIncorrect SNMP settings on the switch.DPort is misconfigured on the switch.
单选题An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()A Battery needs to be replacedB Light switch is turned offC Smart cable is disconnectedD UPS needs a firmware update