During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A、The IBM CE will install the cardB、The card will not be supported by IBMC、The AIX device driver should work fineD、The customer is correct, there should be no problem
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()
- A、The IBM CE will install the card
- B、The card will not be supported by IBM
- C、The AIX device driver should work fine
- D、The customer is correct, there should be no problem
相关考题:
Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()A、mksysbB、restvgC、AIX install CDsD、Veritas NetBackup
One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()A、Two p5 570 16 way 1.9 MHz machinesB、One p5 590 32 way 1.65 MHz machinesC、One p5 595 32 way 1.65 MHz machinesD、Two p5 570 16 way 1.65 MHz machines
A company wants to buy memory efficiently on their p5 590 to allow for the best performance. What is the best practice for adding memory for performance?()A、Install more cards of smaller capacity and same size across MCMs. Use DDR2(dual data rate) memory if using HPC (High Performance Computing). B、Install fewer cards of larger capacity of the same size across MCMs. Servers with one processor book must have a minimum of four memory cards installed. C、Intermix DDR1 and DDR2 memory so that partitions requiring the higher performance can take advantage of them. Half of the available memory slots in the system should contain memory. D、Use fewer higher density memory cards so that a few memory slots are left open for future growth. Each processor book provides sixteen memory card slots. The p5 590 supports a maximum of 64 memory cards.
Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()A、The p5 595 would allow for CODB、The p5 595 includes the Advanced Power Virtualization hardware and softwareC、The p5 595 is priced the same as the p5 590 given the same number/type of CPUsD、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()A、Use lquerypv to read the driveB、Use lspv and look at PP Size valueC、Look on the outside of the drive itselfD、Use bootinfo to find the LTG on the drive
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()A、LPAR Validation Tool (LVT)B、Personal Systems Configurator (PSC)C、IBM Configuration for eBusiness (eConfig)D、Advanced System Management Interface (ASMI)
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()A、Upgrade the p690 to a p5 590 server running AIX 5.3B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationC、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersD、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A、A CD or DVD with installation mediaB、An internal SCSI adapter in the target LPARC、An Ethernet adapter for access to an FTP serverD、Advanced Power Virtualization feature of the p5 590
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A、128B、254C、320D、640
Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()A、Use the 60 Amp line cordsB、Change the 100 Amp connector to a 60 Amp circuitC、Submit an RPQ to order the p5 590 with 100 Amp power cordsD、Change the configuration and order the p5 590 with the 100 Amp power cords
Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()A、Enable DHCP server on the HMCB、Configure host name and IP address on DNS serverC、Manually set the IP address of the service processorD、Connect a RS-232 cable from the HMC to the service processor
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()A、Use eConfig to configure and validate each pSeries and p5 system.B、Engage Advanced Technical Support to review any outstanding technical issues.C、Confirm with the customer that the solution design meets their requirements.D、Perform a Pre-Install Solution Assurance Review to validate required power requirements.
Which server houses the database partitions in the AIX BCU V2.1? ()A、 IBM System p5 570 B、 IBM System p5 575 C、 IBM System p5 590 D、 IBM System p5 595
单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()AA CD or DVD with installation mediaBAn internal SCSI adapter in the target LPARCAn Ethernet adapter for access to an FTP serverDAdvanced Power Virtualization feature of the p5 590
单选题Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()AWhen the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. BV5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. CWhen the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. DV5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
单选题Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()ALPAR Validation Tool (LVT)BPersonal Systems Configurator (PSC)CIBM Configuration for eBusiness (eConfig)DAdvanced System Management Interface (ASMI)
单选题During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()AThe IBM CE will install the cardBThe card will not be supported by IBMCThe AIX device driver should work fineDThe customer is correct, there should be no problem
单选题Which server houses the database partitions in the AIX BCU V2.1? ()A IBM System p5 570 B IBM System p5 575 C IBM System p5 590 D IBM System p5 595
单选题The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()AUse eConfig to configure and validate each pSeries and p5 system.BEngage Advanced Technical Support to review any outstanding technical issues.CConfirm with the customer that the solution design meets their requirements.DPerform a Pre-Install Solution Assurance Review to validate required power requirements.
单选题Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()AVIO ServerBAIX 5.2 ML4CShared Ethernet AdapterDAIX 5.3 with Advanced Power Virtualization
单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()APOWER5 runs in an SMP mode as defaultBPOWER5 can run in a full system mode the same as the p690CPOWER5 can run in full system mode with the purchase of PLMDPOWER5 can run in a full system mode, but it is in LPAR mode
单选题Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A128B254C320D640
单选题During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()AThe IBM CE will install the cardBThe card will not be supported by IBMCThe AIX device driver should work fineDThe customer is correct, there should be no problem
单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()AA CD or DVD with installation mediaBAn internal SCSI adapter in the target LPARCAn Ethernet adapter for access to an FTP serverDAdvanced Power Virtualization feature of the p5 590