多选题关于ups说法正确的是()Aups是一种含有储能装置的不间断电源BUPS可净化市电CUPS在市电突然中断时持续一定时间给设备供电D当市电中断时,ups输出直流电
多选题
关于ups说法正确的是()
A
ups是一种含有储能装置的不间断电源
B
UPS可净化市电
C
UPS在市电突然中断时持续一定时间给设备供电
D
当市电中断时,ups输出直流电
参考解析
解析:
暂无解析
相关考题:
单选题Which of the following is a benefit of NAS over SAN?()A Higher data integrityB Lower cost of implementationC Higher redundancyD Increased performance
多选题建筑工程施工检验批质量验收合格的规定有()A主要功能项目的抽查结果应符合相关专业质量验收规范的规定B具有完整的施工操作依据、质量检查记录C观感质量验收应符合要求D质量控制资料应完整E主控项目和一般项目的质量经抽样检验合格
单选题After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()AThe cfgmgr command was not run to reconfigure the devicesBThe machine was not booted into SMS MultiBoot mode after configurationCThe machine was not in full system partition mode when the volume was createdDThe alt_disk_install command was not run with the -O option to remove references in the ODM
单选题建设项目管理信息化指的是(),以及信息技术在建设项目管理中的开发和应用A信息存储数字化和存储相对集中B信息处理和变换的程序化C信息传输的数字化和电子化D建设项目管理信息资源的开发和利用
单选题项目经理发展团队会议由于主导讨论的人迟到而中断。若要提高团队会议的效率,项目经理应怎么做?()A使用专业引导师B认可按时到达的团队成员C为团队会议设定基本规则D开展团队建设活动