单选题A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()ABecause additional systems would require more power receptaclesBBecause the customer may need to do additional facilities planningCBecause the customer needs additional funding to cover the servicesDBecause postponing the eventual discussion will likely lead to customer dissatisfaction

单选题
A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
A

Because additional systems would require more power receptacles

B

Because the customer may need to do additional facilities planning

C

Because the customer needs additional funding to cover the services

D

Because postponing the eventual discussion will likely lead to customer dissatisfaction


参考解析

解析: 暂无解析

相关考题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?() A.0B.1C.2D.4

Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)A. no single point of failureB. trading database server locationC. redundant application servers locationD. deterministic response to all failuresE. determine which protocol to use

A vessel is described as a two compartment vessel when it ______.A.has no more than two compartmentsB.has two compartments in addition to the engine roomC.will sink if any two compartments are floodedD.will float if any two adjacent compartments are flooded

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction

A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A、One 7311-D20 drawerB、Two 7311-D20 drawersC、Two 7311-D10 drawersD、One 7311-D10 drawers

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A、0B、1C、2D、4

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers.  This is the first p650 in the enterprise.  What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A、Have the PDU requirements been met?B、Are there sufficient KVM connections?C、Is there sufficient service clearance?D、Is there sufficient space in the existing rack?

A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()A、 Two of DPI C13 Enterprise PDU 39Y8941B、 One of DPI Universal Rack PDU 39Y8951C、 One of DPI C13 Enterprise PDU 39Y8941D、 Two of DPI C19 Enterprise PDU 39Y8948

The pSeries technical specialist has a number of tasks to perform and does not have time to do them all.  It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority.  How should the following task list be prioritized? () 1. Return a call from customer seeking compatibility information.  2. Configure three p690 servers to be ordered in two weeks.  3. Prepare a POWER5 presentation to give to a customer in two weeks.  4. Configure three p690 servers to be ordered this quarter.A、4,2,1,3B、4,3,1,2C、2,4,3,1D、2,3,4,1

A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()A、add one SVCB、install one DS8700C、install one DS8800D、install one XIV system

A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

A customer requires a deskside solution that they will rack-mount in the future.  Space is at a premium.  The solution must support two AIX 5.2 applications that require two processors each.  Which of the following deskside configurations should the pSeries Technical Specialist recommend?()A、One p5-550 4-wayB、Two 2-way p5-520sC、One p630 4-wayD、Two 2-way p615s

A customer’s new rack contains 12 x p655 servers.   The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s.  What upgrades, if any, are needed to the HMC to support the new p655 servers?()A、No upgrades are needed.B、Add another 16-port RAN.C、Add an 8-port async adapter.D、Add an additional 128-port adapter.

A customer needs a new database server.  The database application has a high memory overhead but does not benefit from 8-way processing.  They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory.  Which of the following will satisfy the customer’s requirements?()A、x445 with four Xeon DP processors and 16GB of memory in a single SMP moduleB、x445 with four Xeon MP processors and 16GB of memory in a single SMP moduleC、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memoryD、x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory

A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers

A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products

A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()A、One 50 GB SATA 1.8 inch SSDB、Two 73GB 10K SAS HDD SFFC、Two 31 GB SATA 2.5 inch SSDD、Two 50GB SATA 1.8 inch SSD

A manufacturing customer has a requirement to add 12 additional dual-attached servers to theirexisting two Brocade 16 port SAN switches that have no more ports available. Which of thefollowing should be recommended to accommodate the current capacity requirements, allow forfuture growth and provide 8 and 4 Gb support?()A、two SAN16B B、two SAN80B-4 C、two SAN24B-4 D、two SAN04B-R

A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A、0B、1C、2D、4

单选题A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A0B1C2D4

单选题A customer has a p650 on order and plans to put it in a current OEM rack.  They are concerned that the p650 power supply may demand more current than the OEM PDU can provide.  Which planning guide specification would provide the necessary requirements?()AVoltageBFrequencyCPower Source Loading (max)DPower Source Loading (typical)

单选题A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A0B1C2D4

单选题A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers.  This is the first p650 in the enterprise.  What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()AHave the PDU requirements been met?BAre there sufficient KVM connections?CIs there sufficient service clearance?DIs there sufficient space in the existing rack?

多选题Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)Ano single point of failureBtrading database server locationCredundant application servers locationDdeterministic response to all failuresEdetermine which protocol to use

单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()Acompatibility of copy functionsBdifference in capacities in the two systemsCcache size discrepancies between the two systemsDthe necessity of using two storage management products