单选题Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()AVerify the ISV application runs on AIX 5.2BPower4 to POWER5 upgrades are not supported without a application recompileCCheck the placement and size of the boot logical volume and disk space requirements on the S85DAIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
单选题
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()
A
Verify the ISV application runs on AIX 5.2
B
Power4 to POWER5 upgrades are not supported without a application recompile
C
Check the placement and size of the boot logical volume and disk space requirements on the S85
D
AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
参考解析
解析:
暂无解析
相关考题:
A company is upgrading from DSL to a new T1. When the ISP sends a technician out, the technicianwill terminate the T1 at which of the following locations in the building?() A. Patch panelB. FirewallC. SwitchD. Demarc
Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()A、From the HMCB、From a NFS mountC、From a FTP serverD、From any CD or DVD drive on another server
Which feature is added when upgrading from IPCC Express Standard to Enhanced?()A、text chat B、Log Out/Not Ready reason codes C、WrapUp State D、WrapUp timer E、competency-based routing
What types of orders are exempt from using the IPCC Express Configuration and Ordering Tool? ()A、orders for coresident deployments B、orders for adding more seats C、orders for upgrading from standard D、orders with less than five seats E、all orders require using the IPCC Express Configuration and Ordering Tool
Which two features are added when upgrading from IPCC Express Standard to Enhanced? ()A、Agent Routing B、Historical Reporting C、Conditional Routing D、Prioritized Queueing E、Agent Queueing
What are two benefits for the Cisco Partner, derived from the Cisco SBR Methodology?()A、There is less risk through the implementation of proven solutionsB、Proactive planning enhances customer satisfactionC、Thereare faster implementation of new business applicationsD、Solution differentiation from the competition allows for premium margins
Internet cookies are lost when upgrading from Windows 98 or Windows Me to Windows XP. What is the MOST likely cause?()A、Internet Explorer cookies from Windows 98 or Windows Me are incompatible with Windows XPB、Internet Explorer 4x was installed prior to upgrading to Windows XPC、Windows XP has a different user profile structure than Windows 98 or Windows Me and the upgrade process does not migrate cookiesD、Windows XP default Internet security option settings delete cookies during upgrades from Windows 98 or Windows Me
A company is upgrading from DSL to a new T1. When the ISP sends a technician out, the technicianwill terminate the T1 at which of the following locations in the building?()A、Patch panelB、FirewallC、SwitchD、Demarc
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
Which installation method enables the quickest recovery in the event of failure when upgrading from AIX 5.3 to AIX 6.1?()A、Use alt_disk_install.B、Apply the upgrade without commit.C、Use a backup image from a NIM server.D、Use a mksysb image from a locally attached DVD-RAM.
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()A、IBM TechlineB、IBM SupportlineC、IBM Software DistributionD、IBM Hardware Support
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()A、Sales ManualB、Announcement LetterC、Site and Hardware Planning InformationD、Adapter, Devices, and Cable Information for Multiple Bus Systems
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A、Verify the ISV application runs on AIX 5.2B、Power4 to POWER5 upgrades are not supported without a application recompileC、Check the placement and size of the boot logical volume and disk space requirements on the S85D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A、128B、254C、320D、640
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()A、Sales ManualB、Announcement LetterC、POWER4+ p650 Specification SheetD、Site and Hardware Planning Information Manual
A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()A、The pSeries family of servers offers many choices from small entry servers to data-center class systemsB、pSeries systems support both AIX and Linux operating systems providing a single platform for both environmentsC、AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries serverD、Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized
What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()A、pSeries eWLM can create classes while pSeries WLM can create tiers.B、pSeries eWLM can create tiers while pSeries WLM can create classes.C、pSeries eWLM is implemented over multiple O/S images while pSeries WLM is implemented within an individual O/S image.D、pSeries eWLM is implemented within an individual O/S image while pSeries WLM is implemented over multiple O/S images.
You are planning an upgrade strategy for a Windows Azure application. You need to identify changes that will require application downtime. Which change will always require downtime?()A、 Changing the virtual machine sizeB、 Adding an HTTPS endpoint to a web roleC、 Changing the value of a configuration settingD、 Upgrading the hosted service by deploying a new package
单选题Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A128B254C320D640
单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()AThe resources must be unallocated in an LPARBThe microcode on the pSeries must be currentCAll network adapters on the LPAR must be definedDNetwork connectivity and name resolution capability between HMC and LPARs
单选题Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。Ainitiation planning analysis design development implementation operations and maintenanceBproject planning, site assessment risk assessment solution selection and acquisition, testing, and operationsCprepare, plan, design, implement operate, and optimizeDanalysis, design, deployment testing, implementation, and productionEpresales, project planning, development implementation, operations testing, and operations sign- off
单选题Which feature is added when upgrading from IPCC Express Standard to Enhanced?()Atext chat BLog Out/Not Ready reason codes CWrapUp State DWrapUp timer Ecompetency-based routing
多选题Which two features are added when upgrading from IPCC Express Standard to Enhanced? ()AAgent RoutingBHistorical ReportingCConditional RoutingDPrioritized QueueingEAgent Queueing
单选题What types of orders are exempt from using the IPCC Express Configuration and Ordering Tool? ()Aorders for coresident deployments Borders for adding more seats Corders for upgrading from standard Dorders with less than five seats Eall orders require using the IPCC Express Configuration and Ordering Tool
单选题The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()AI/T services and education to help with the implementation of the hardware and softwareBA Supportline specialist to work directly with the customer to manage any issues that ariseCThe services required to move the currently installed applications from the competitor’s systems to the IBM systemsDA slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution
单选题You are planning an upgrade strategy for a Windows Azure application. You need to identify changes that will require application downtime. Which change will always require downtime?()A Changing the virtual machine sizeB Adding an HTTPS endpoint to a web roleC Changing the value of a configuration settingD Upgrading the hosted service by deploying a new package
单选题The inputs of developing project management plan do not include()Aproject charterBstakeholder management strategyCproject scope statementDoutputs from planning processes