cargo list ()A、配载图B、仓单C、收据D、货物清单
cargo list ()
- A、配载图
- B、仓单
- C、收据
- D、货物清单
相关考题:
The derrick to be laid down on deck,cargo blocks,span tackles,guide rollers and all moving parts of derrick to be dismantled,cleaned and greased with special grease.This sentence is most possibly found in ________.A.Chief Mate's remark on stowage planB.Store list made by Chief EngineerC.Collision Report made by MasterD.Repair List
From ______ the mariner can know the data of tide.A.the Sea PilotB.the Cargo PlanC.the Tide TableD.the Port List
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch
In accordance with LOF,the owners of the vessel their Servants and Agents shall use their best endeavours to ensure that ______.A.the cargo owners provide their proportion of security before the cargo is releasedB.the cargo owners provide their proportion of security after the cargo is releasedC.the cargo owners dose not provide their proportion of security before the cargo is releasedD.the cargo owners does not provide their proportion of security after the cargo is released
TRANSVERSE MOVEMENT OF CARGO,ESPECIALLY BULK,CAUSED BY ROLLING OR A HEAVY LIST defines ______.A.Shifting cargoB.Moving cargoC.Removing cargoD.Trimming cargo
When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo
______is an angle at which a cargo settles in the hold of a ship,between the horizontal and the slope made by a bulk cargo such as grain or iron ore.A.Angle of lollB.Angle of inclinationC.Angle of reposeD.Angle of list
Bulk cargo refers to ______.A.cargo which occupies a large volume of spaceB.cargo which requires refrigerationC.cargo which is very denseD.homogeneous cargo not enclosed in a container
Cargo may be divided into two basic types:().A、bulk cargo and container cargoB、bulk cargo and general cargoC、bulk cargo and liquid cargoD、dry cargo and liquid cargo
Which of the following is not dangerous cargo?()A、Coal.B、Explosive cargo.C、Flammable cargo.D、Poisonous cargo.
湿货要远离干货。()A、Wet cargo must be kept away from dry cargo.B、Heavy cargo must be kept away from dry cargo.C、Light cargo must be kept away from dry cargo.D、Wet cargo must be kept away from light cargo.
()carries not only general cargo but also bulk cargo.A、A bulk carrierB、A multi-purpose shipC、A general cargo shipD、A dry cargo ship
Duty sailors will consider the conditions of (装卸货)().A、cargo handledB、cargo handlesC、cargo handleD、cargo handling
单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().Aremove an existing list that would slow down cargo operationsBinitiate loading in conjunction with unloading at the hatchCimprove stability during cargo operationsDallow longshoremen easy access to the hatch
单选题TRANSVERSE MOVEMENT OF CARGO,ESPECIALLY BULK,CAUSED BY ROLLING OR A HEAVY LIST defines().AShifting cargoBMoving cargoCRemoving cargoDTrimming cargo
单选题From () the mariner can know the data of tide.Athe Sea PilotBthe Cargo PlanCthe Tide TableDthe Port List
单选题While loading cargo,a white trimming light on the starboard side comes on. This indicates that().Athe vessel has a list of about 1` to starboardBthe chutes should be directed to the starboard sideCthe chutes in No. 1 hold should be directed to the starboard sideDa severe list to starboard has developed and all loading should cease
单选题The supplement to the IOPP Certificate contains what type of data? ()AThe grades of cargo that an oil tanker is permitted to carryBA checklist of the equipment installed for controlling the discharge of oilCThe trade routes upon which the vessel may operateDA list of the underwriters who will assume financial responsibility in the event of an oil spill
单选题If any cargo is damaged,the insurance company usually pays to the cargo owner a sum of money equal to the value of().Athe cargoBthe cargo damagedCthe cargo minus the franchiseDthe cargo damaged minus the franchise
单选题During cargo operations, your vessel develops a list due to the center of gravity rising above the transverse metacenter. To correct the list, you should().Ashift weight to the high sideBshift weight to the centerlineCadd weight in the lower holds or double bottomsDremove weight from the lower holds or double bottoms
单选题When cargo is shifted from the main deck into the lower hold of a vessel,().AThe metacenter will move downwardBThe GM will increaseCThe center of buoyancy will move upwardDThe list of the vesel will become great
单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().Aprovide the proper trimBprevent negative stability from developingCprevent excessive longitudinal stressesDcontrol list
单选题I HAVE DANGEROUS LIST means().AI have some dangerous cargo on boardBMy cargo is dangerousCMy vessel is inclinedDMy vessel has not been trimmed properly