救生艇下水每隔三个月进行一次。()A、Lifeboat launching is operated at intervals of three months.B、Lifeboat launching is operated at intervals for three months.C、Fire drill is carried out once a month.D、Don’t operate two or more hatch covers at the same time.

救生艇下水每隔三个月进行一次。()

  • A、Lifeboat launching is operated at intervals of three months.
  • B、Lifeboat launching is operated at intervals for three months.
  • C、Fire drill is carried out once a month.
  • D、Don’t operate two or more hatch covers at the same time.

相关考题:

______ of the following statements is INCORRECT regarding a fire and boat drill on board your cargo vessel.A.At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedB.The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months.C.Lifeboat equipment shall be examined at least once each month to insure that it is completeD.An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill

______ of the following statements is(are)correct regarding motor lifeboats on cargo vessels.① The motor of each lifeboat shall be operated in the ahead and astern position for a period of not more than 5 minutes once in each week;② The fuel tank of all motor-propelled lifeboats shall be emptied and the fuel changed at least once in every year.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

The launching ramp for the lifeboat is ______.A.the rollerB.the skidC.the slideD.the davit

During a fire drill on a vessel, what action is required? ______.A.Start each fire pump.B.Launch and run a lifeboat.C.Inventory rescue and fire equipment.D.Inspect fire hoses

Line throwing equipment should not be operated ______.A.during a rain stormB.in an explosive atmosphereC.near a lifeboat stationD.by other than licensed officers

Lifeboat launching is operated at intervals of three months.()A、救生艇下水每隔三周进行一次。B、救生艇下水每三个月进行一次。C、救生艇下水每三年进行一。D、救生艇下水三个月。

Lifeboat launching is operated at intervals of ()months.A、oneB、twoC、threeD、four

Bosun, I’ve never operated the hatch covers ()by hydraulic power.A、poweredB、drivenC、movedD、opened

Don’t operate two or more ()(舱盖)at the same time.A、capsB、leversC、hatch coversD、hatches

Lifeboat launching is operated ().A、quarterlyB、annuallyC、monthlyD、yearly

According to the customs of the port, hatch covers are to be operated by ().A、stevedoresB、watchmenC、winchmenD、foremen

Don’t operate two or more hatch ()at the same time.A、capsB、leversC、coversD、coamings

Fire drill is carried out once a ().A、yearB、dayC、weekD、month

To ensure the safety in operating hatch covers, oil the moving parts ().A、monthlyB、every three monthsC、once monthlyD、every two months

Which of the following items isn’t belonging to Docking survey?()A、Examination of the shell including bottom, side and bow platingB、Examination of sea suctions, overboard discharging valves and sea chestsC、Load testing of lifeboat launching devicesD、Poker gauge of propeller shaft taken

单选题In launching a covered lifeboat,what would safely lower the lifeboat from inside the lifeboat cabin?()AFrapping lineBTricing lineCRottmer releaseDWinch remote control wire

单选题A ROUND THROUGH THE VESSEL CARRIED OUT BY A CREW MEMBER OF THE WATCH AT CERTAIN INTERVALS SO THAT AN OUTBREAK OF FIRE MAY BE PROMPTLY DETECTED defines().AFire patrolBFire controlCSmoke detectionDFire drill

单选题救生艇下水每隔三个月进行一次。()ALifeboat launching is operated at intervals of three months.BLifeboat launching is operated at intervals for three months.CFire drill is carried out once a month.DDon’t operate two or more hatch covers at the same time.

单选题You are Master of a towing vessel engaged in towing three barges astern.The middle barge of the tow would be required to sound which of the following during restricted visibility ().ANo fog signalBA prolonged blast at intervals never to exceed more than two minutesCA prolonged blast followed by two short blasts at intervals never to exceed more than two minutesDA prolonged blast followed by three short blasts at intervals never to exceed more than one minute

单选题To ensure the safety in operating hatch covers, oil the moving parts ().AmonthlyBevery three monthsConce monthlyDevery two months

单选题()of the following statements is incorrect regarding a fire and boat drill ao board your cargo vessel.AAt least one fire and drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedBThe Master is responsible in seeing thst each lifeboat is lowered to the water at least once in each 6 monthsCLifeboat equipment shall be examined at least once each month to insure that it is completeDAn entry shall be made in the vessels official Logbook relative eo each fire and boat drill

单选题Don’t operate two or more ()(舱盖)at the same time.AcapsBleversChatch coversDhatches

单选题After conducting an abandonment drill,the Master or person in charge of a ship shall log().Athe names of crew members who participated in the drillBthe length of time that each motor propelled lifeboat was operated in the drillCthe length of time the lifeboat was in the waterDthe time it took to lower the boat

单选题When a survival craft drill is held,the person in charge must insure that().Aall survival craft are lowered to the water,launched,and operated for thirty minutesBall davits used for launching liferafts are operatedCeach emergency position indicating radio beacon is tested for thirty minutesDthe helicopter pad landing lights are operating in a quick-flashing mode

单选题Line throwing equipment should not be operated().Aduring a rain stormBin an explosive atmosphereCnear a lifeboat stationDby other than licensed officers

单选题When abandoning ship,after launching the motor lifeboat you should().Aplot a course for the nearest landBtake a vote on which direction you should goCstay in the immediate areaDgo in one direction until fuel runs out

单选题What is required by regulations concerning the stowage of lifeboats on cargo vessels?()AEach lifeboat must have a launching applianceBLaunching appliances must be of the gravity typeCThere may not be more than two launching appliances on the same deckDAll of the above