单选题When a survival craft drill is held,the person in charge must insure that().Aall survival craft are lowered to the water,launched,and operated for thirty minutesBall davits used for launching liferafts are operatedCeach emergency position indicating radio beacon is tested for thirty minutesDthe helicopter pad landing lights are operating in a quick-flashing mode

单选题
When a survival craft drill is held,the person in charge must insure that().
A

all survival craft are lowered to the water,launched,and operated for thirty minutes

B

all davits used for launching liferafts are operated

C

each emergency position indicating radio beacon is tested for thirty minutes

D

the helicopter pad landing lights are operating in a quick-flashing mode


参考解析

解析: 暂无解析

相关考题:

The air cylinder bottles in the survival craft should be refilled with ______.A.oxygenB.nitrogenC.compressed airD.nitrogen and oxygen

What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill?A.Which survival craft was used in the drillB.The number of each lifeboat not lowered during each drillC.Only the number of each motor propelled lifeboat that is loweredD.The length of time an oar propelled lifeboat is rowed

During an abandonment or drill,the first person to arrive at the survival craft should ______.A.pass out food and water to personnelB.open the doors and start the sprinkler systemC.activate the emergency release handleD.open the doors and prepare the craft for boarding

A survival craft being used to pick up a person who has fallen overboard from a ship should approach the person ______.A.at a high rate of speedB.under oarsC.against the windD.with the wind

When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?A.Once a dayB.At the change of every watchC.Only when in fresh or brackish waterD.Prior to getting underway

Which step should be taken,if possible,when the vessel must be abandoned because of a distress situation ________.A.Alert the Coast Guard by using the survival craft's portable INMARSAT unitB.Program the SART and EPIRB to transmit the vessel's location and situationC.Place the SART and EPIRB in the“ON”position and secure them to the survival craftD.No additional steps are needed as the SART and EPIRB will both automatically float free and operate properly

The person in charge on the vessel and the person in charge at the facility must hold a meeting before starting the transfer of oil.Who must decide to start the transfer ________.A.The person in charge on the vesselB.The person in charge at the facilityC.Both persons in chargeD.The person in charge of either place that is doing the pumping

An on-load release system on a survival craft means the cable can be released ______.A.only when the load is taken off the cableB.only when there is a load on the cableC.only when activated by the controls at the lowering stationD.at any time

单选题The purpose for the bag or box on top of some survival craft is to().Aright the craft in case of capsizingBincrease area for radar detectionCact as a sail in case of a power lossDsteady the craft in heavy seas

单选题The backup system on an electric start survival craft is a().Ahydraulic systemBpneumatic systemCspare batteryDhand crank

单选题What must the Master or person in charge of a ship enter in the logbook after conducting an abandonment drill? ()AThe sea condition at the time of the drillBWhich survival craft was usedCThe names of all crew members participating in the drillDThe name of the lifeboatman in charge of each boat

单选题The sprinkler system of a survival craft is used to().Acool the craft in a fireBcool the engineCspray oil on the sea to calm itDspray personnel during a fire

单选题The survival craft’s engine is fueled with().AkeroseneBunleaded gasolineCdiesel oilDliquefied gas

单选题Survival craft EPIRBs (Class S) are().Apermanently mounted in the survival craftBportable and stowed for carriage to the survival craftCpermanently mounted on the bridge wingsDportable and stowed in the emergency gear locker

单选题During an abandonment or drill,the first person to arrive at the survival craft should().Apass out food and water to personnelBopen the doors and start the sprinkler systemCactivate the emergency release handleDopen the doors and prepare the craft for boarding

单选题In evacuation from a ship,an individual without the option of a survival craft or liferaft should enter the water on the leeward side,except when().Athere is burning oil on the waterBthere is a rescue craft in the areaCwater temperature is below 40°FDa rigid survival craft is in the area

单选题The limit switches on a ships survival-craft winch system().Astop the winch just before the craft reaches the final stowage positionBlimit the amount of cable on the drumClimit the ascent rateDstop the winch in case the craft weighs too much

单选题The air cylinder bottles in the survival craft should be refilled with().AoxygenBnitrogenCcompressed airDnitrogen and oxygen

单选题The survival craft is manufactured with fire retardant().AfoamBmarine plywoodCsteelDfiberglass

单选题What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()AWhich survival craft was used in the drillBThe number of each lifeboat not lowered during each drillCOnly the number of each motor propelled lifeboat that is loweredDThe length of time an oar propelled lifeboat is rowed

单选题A survival craft being used to pick up a person who has fallen overboard from a ship should approach the person().Aat a high rate of speedBunder oarsCagainst the windDwith the wind

单选题When retrieving the survival craft,the winch operator should stop the winch and check().Athat all personnel are seated in the craftBthat the cable has not jumped any grooves on the drumCwhich way the wind is blowingDthe hydraulic fluid level before lifting

单选题An on-load release system on a survival craft means the cable can be released().Aonly when the load is taken off the cableBonly when there is a load on the cableConly when activated by the controls at the lowering stationDat any time

单选题It is the responsibility of the person in charge to().Arevise the operating manual when rig personnel changeBbe fully aware of the provisions in the operating manualCmaintain the rig's construction portfolioDAll of the above

单选题Which step should be taken,if possible,when the vessel must be abandoned because of a distress situation().AAlert the Coast Guard by using the survival craft's portable INMARSAT unitBProgram the SART and EPIRB to transmit the vessel's location and situationCPlace the SART and EPIRB in the“ON”position and secure them to the survival craftDNo additional steps are needed as the SART and EPIRB will both automatically float free and operate properly

单选题After conducting an abandonment drill,the Master or person in charge of a ship shall log().Athe names of crew members who participated in the drillBthe length of time that each motor propelled lifeboat was operated in the drillCthe length of time the lifeboat was in the waterDthe time it took to lower the boat

单选题When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?()AOnce a dayBAt the change of every watchCOnly when in fresh or brackish waterDPrior to getting underway