单选题Guide tolerances during elevation of the jack-up rig will().Areduce spud can bearing pressureBkeep the unit level and reduce overloadingCreduce stresses on the hullDminimize the potential for punch-through
单选题
Guide tolerances during elevation of the jack-up rig will().
A
reduce spud can bearing pressure
B
keep the unit level and reduce overloading
C
reduce stresses on the hull
D
minimize the potential for punch-through
参考解析
解析:
暂无解析
相关考题:
A good tour guide tells visitors().A. What they couldn't miss during the tripB. What during the trip they couldn't missC. What couldn't miss they during the trip
Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.A.PreventersB.Side ropesC.StaysD.Guide lines
A jack-up drilling rig being towed must ______.A.turn off all lights that interfere with the navigation lightsB.turn on all available working lights on deckC.ring the bell rapidly for five seconds once a minuteD.display two black diamonds in a vertical line during the day
It is the responsibility of the person in charge to ______.A.revise the operating manual when rig personnel changeB.be fully aware of the provisions in the operating manualC.maintain the rig's construction portfolioD.All of the above
OAG的全称是( )。 A.Official Airlines Guide B.Official Airways Guide C.Online Airlines Guide D.Online Airways Guide
OAG的全称是()。A.OffiCiAl Airlines GuiDE.B.OffiCiAl AirwA.ys GuiDE.C.Online Airlines GuiDE.D.Online AirwA.ys GuiDe
把引航员梯装在下风舷。()A、Fit the rope ladder in the lee side.B、Rig the rope ladder in the lee side.C、Rig the pilot ladder on the lee side.
The running wheel runs along ()on top of the hatch coaming.A、the guide railB、the guide ropeC、the side coamingD、the guide roller
What other type of document accompanies the SAPR Guide to provide guidelines and pointers for use during Pre-Sale Reviews? ()A、TechdocsB、Process GuideC、Product ChecklistsD、Site Planning Guide
单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().Aallow greater than normal loads to be handled by the gearBact as an inboard guy in the event the inboard guy parts during cargo handlingCassist the outboard guy in supporting stresses during cargo handlingDprevent the inboard guy from parting due to stresses during cargo handling
单选题When cargo aboard a jack-up in transit becomes adrift,the tow vessel should be asked to ().Aturn into the seasBturn to be parallel to the seasCreduce speedDincrease speed
单选题The plunger is machined to very fine tolerances, as is the matched()in which it reciprocates.AbarrelBramCpistonDrod
单选题Guide tolerances during elevation of the jack-up rig will().Areduce spud can bearing pressureBkeep the unit level and reduce overloadingCreduce stresses on the hullDminimize the potential for punch-through
单选题Maintaining the close tolerances in diesel fuel pumps and injectors requires the use of().Afuel/water separatorsBday tanksCinjector test standDfuel filters
单选题The running wheel runs along ()on top of the hatch coaming.Athe guide railBthe guide ropeCthe side coamingDthe guide roller
问答题Practice 1 Suppose you had a bad cold during your last trip to a famous mountain. The tourist guide has helped you a lot. Write a letter of thanks to the travel agency. Your letter should include: (1) a description of your case (2) thanks to the tourist guide and the travel agency You should write approximately 100 words. Do not sign your own name at the end of the letter. Use “Wang Lin” instead.
单选题Fighting a rig fire in a watertight compartment with hoses could reduce the stability of the rig by().Aprogressive downfloodingBreducing the level of drill water from the storage tanksCcausing a list due to the water in the compartmentDreducing the KG to minimum allowable
单选题The muster list shows each rig hand’s muster station,his duties during abandonment,basic instructions,and().Aall emergency signalsBinstructions for lowering the survival craftCthe time each weekly drill will be heldDwork schedule
单选题During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().Aimmediately flush the spill with large quantities of fresh waterBcover the contaminated surface with soda-ash-soaked lime solutionCadd sodium bisulfate on the contaminated surface and spray it down with waterDmove to a position upwind of the spill and allow the product to boil off
单选题Before replacing a piston you should check the rings to see that all clearances and gaps are () the permissible tolerances.AaboveBatCoverDwithin
单选题It is the responsibility of the person in charge to().Arevise the operating manual when rig personnel changeBbe fully aware of the provisions in the operating manualCmaintain the rig's construction portfolioDAll of the above
单选题A jack-up drilling rig being towed must().Aturn off all lights that interfere with the navigation lightsBturn on all available working lights on deckCring the bell rapidly for five seconds once a minuteDdisplay two black diamonds in a vertical line during the day
单选题Where would you find the call sign or call letters of the radio station on your ship?()AIn the rig safety manualBOn the Certificate of InspectionCOn the Ship Station LicenseDOn the rig Watch Bill
单选题Where would you find the “call sign” or “call letters”of the radio station on your rig?()AIn the rig safety manualBOn the Certificate of InspectionCOn the Ship Station LicenseDOn the rig Watch Bill