单选题An inland oil barge must have equipment available to remove an on-deck oil spill of at least().Aone barrelBtwo barrelsCfive barrelsDten barrels

单选题
An inland oil barge must have equipment available to remove an on-deck oil spill of at least().
A

one barrel

B

two barrels

C

five barrels

D

ten barrels


参考解析

解析: 暂无解析

相关考题:

If you carry packaged hazardous cargoes on a break bulk vessel bound foreign,you must ______.A.stow the hazardous cargoes on deck available for jettisoning if necessaryB.remove the hazardous cargo labels from a portable tank after the tank is emptiedC.have the shipping papers indicate the proper shipping name and the technical name of n.o.s. cargoesD.log the receipt of hazardous cargoes in the Official Logbook

Hanging a barge off means to ______.A.moor a damaged barge to the bank and leaveB.remove and deliver a loaded barge from a multiple towC.remove a barge while locking throughD.tow an empty barge astern

If you have a liquefied flammable gas barge in tow,which is NOT required of you with respect to the barge and its cargo ________.A.Make periodic inspections of bilgesB.Keep the barge under constant surveillanceC.Have a properly certificated tankerman or at least one licensed officer on board the towing vesselD.Verify ullage readings

You are planning to use a crude oil washing system.What precaution must be taken with the tank as the source for the washing machines ________.A.It must be debottomed and the level lowered by at least one meterB.The oil in the source tank must be sampled for compatibilityC.The source tank must have been crude oil washed at least once in the past 150 daysD.The inert gas system must lower the oxygen content to a maximum of 12% oxygen in the tank

You are moving a gas free tank barge to dry dock for repairs.The barge must have onboard a valid ______.A.Gas Free CertificateB.Certificate of InspectionC.Permit to Proceed and Hot Work PermitD.All of the above

During an annual FCC inspection ______.A.All required documents and publications may have to be producedB.Licensed GMDSS radio operators may be required to demonstrate equipment competenciesC.All required equipment must be fully operationalD.All of the above

The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.A.on a tug standing byB.available by contract with the shore facilityC.kept at the shoreside hose connection during transferD.kept in a protected shoreside location readily accessible

You are underway with a tow consisting of six barges containing hazardous chemicals.Which statement is FALSE concerning a cargo information card ________.A.It must be carried in the pilothouse,readily available for each chemical carriedB.It must be posted on the lead barge of the tow onlyC.It must be posted on each barge on the towD.It contains information on procedure for spills or leaks

The ()(油驳) is a barge carrying oil.A、oil bargeB、oil shipC、pilot boatD、barge

The()(液货船) includes oil tanker, VLCC, LNG ,etc.A、chemica lcarrierB、tankerC、refrigeratorD、barge

The()takes a pilot to an oceangoing ship.A、container shipB、oil shipC、pilot boatD、barge

The ()carries people, cargo, and car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge

The()(渡船 carries people, cargo, car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge

单选题During an annual FCC inspection().AAll required documents and publications may have to be producedBLicensed GMDSS radio operators may be required to demonstrate equipment competenciesCAll required equipment must be fully operationalDAll of the above

单选题A loaded hopper barge with independent tanks has a placard,with alternating red and white quadrants,on each side and end. Which statement concerning this barge is TRUE?()AThe cargo will spontaneously ignite if released to the atmosphereBYou must operate this barge as a lead bargeCThe barge should be spotted as far away from the towboat as possibleDThe barge must be in a protected position within the tow

单选题The fourth engineer accompanied by the workers on oil barge measures the oil levels, temperature and () in the tanks.Atank tableBtrimCwater contentsDoil pressure

单选题You have orders to drop off a barge loaded with propylene oxide at a fleet.In doing so,you must ensure that().AAll wing voids and rakes are pumped dry before tying off the bargeBThe barge is moored next to the bank where it will be protected from a possible collisionCThe barge is under the care of a watchmanDA rake end is facing upstream to minimize the effect of current on the mooring lines

单选题When fuel oil has seriously contaminated a diesel engine lubricating oil, you should ().Afilter to remove the fuel oilBuse the settler to remove the fuel oilCremove the fuel oil by centrifugingDdrain and then renew the lube oil supply

单选题Fire protection regulations apply to those towing vessels().Aused only for pollution responseBowned and operated by the US governmentCused only within a barge fleeting areaDused only on inland waters

多选题Acme Booster Corporation has a corporate policy stating that all routing devices will have their configurations backed up to a corporate server on a weekly basis. Their CUE module is a component of the Cisco CallManager Express device. Which three parameters will ensure successful backup of the CUE module configuration?()AATFTP server must be present and available to the CUE module.BThe CUE module must have modify permissions on the backup server directory.CThe CUE module must be in an offline mode prior to instituting the backup.DAn FTP server must be present and available to the CUE module.EThe CUE module must copy the configuration and messages to separate directories on the backup server.FThe CUE module must have read and write permissions on the backup server directory.

单选题The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().Aon a tug standing byBavailable by contract with the shore facilityCkept at the shoreside hose connection during transferDkept in a protected shoreside location readily accessible

单选题Before the oily water is installed on board ships, it must have ()AIOPPBtype approval certificateCcargo ship safety equipment certificateDcargo ship safety certificate

单选题“Before disconnecting the oil pipe, would you flush the oil retained in the pipe?” asked the oil barge owner ()Aby using of fresh waterBwith compressed airCby using of sea waterDwith chemical compound

单选题Fuel oil day tanks for diesel engines must be checked and cleaned and cleaned at regular intervals in order to remove()AsludgeBwaterCmicro-organism growthDall of the above

单选题All inspected vessels on unrestricted ocean routes must have equipment on board for testing an individual’s().AbloodBbreathCurineDAll of the above

单选题() providing lubricating films, oil used in marine diesel engines have to remove heat from oil cooled piston.AExcept forBBesideCExceptDIn addition to

单选题The number of flashlights required as lifeboat equipment on a seagoing barge is().AnoneBoneCtwoDthree