单选题The fourth engineer accompanied by the workers on oil barge measures the oil levels, temperature and () in the tanks.Atank tableBtrimCwater contentsDoil pressure
单选题
The fourth engineer accompanied by the workers on oil barge measures the oil levels, temperature and () in the tanks.
A
tank table
B
trim
C
water contents
D
oil pressure
参考解析
解析:
暂无解析
相关考题:
During UMS rounds, a duty engineer notices that the fuel oil overflow observation glass is full of oil. Should he ____.A.Stop all F.O. transfers immediately, and inform the chief engineer.B.Make a sounding of the F.O. overflow tank and decide if there is enough capacity to leave it until the following morning.C.Call a motorman and have him sound the F.O. overflow tank periodically during the night.D.start the F.O. purifier
Immediately after any diesel engine is started, the engineer should check the ______.A.crankcase pressureB.lube oil pressureC.saltwater pressureD.exhaust temperature
A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil ________.A.The loading dockB.The midpoint of the bargeC.Within 25 feet of the pump engineD.Above the forward rake end
The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.A.on a tug standing byB.available by contract with the shore facilityC.kept at the shoreside hose connection during transferD.kept in a protected shoreside location readily accessible
The ()carries people, cargo, and car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge
The()(渡船 carries people, cargo, car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge
The pilot boat takes a pilot to an/a()(远洋船).A、container shipB、oil shipC、ocean-going shipD、barge
单选题If the overflow tank high-level alarm sounds while the fuel oil tanks are being topped off, the engineer should ().Aclose the static leg filling valveBclose the overflow tank falling valveCreduce the fuel oil pumping rateDstop the fuel oil pumping operation
单选题After oil pollution occurs in Chinese ports,what action shall be first taken by ship’s Captain and Chief Engineer?()Ato use the oil dispersantBto organize the persons to collect the oilCto report the matter to MSA and ask for instructionsDto put forward an accident report within 24 hours
单选题Before starting a diesel engine that has an engine driven lube oil pump, the engineer should ().Aopen the bypass lineBcut in the lube oil coolerCpressurize the lube oil systemDtop off the expansion tank
单选题A shipboard oil pollution emergency plan is required of ().Aall vessels, regardless of size and commercial applicationBany barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveDan oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
单选题A shipboard Oil Pollution Emergency Plan is required of().Aall vessels,regardless of size and commercial applicationBany barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveDan oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above
单选题Usually() handles the majority of the correspondence and negotiation needed during transactions of stores and spare parts in the engine department.Athe chief engineerBthe second engineerCthe third engineerDthe fourth engineer
单选题The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().Aon a tug standing byBavailable by contract with the shore facilityCkept at the shoreside hose connection during transferDkept in a protected shoreside location readily accessible
单选题Immediately after any diesel engine is started, the engineer should check the ()Acrankcase pressureBlube oil pressureCsaltwater pressureDexhaust temperature
单选题The ash content of a fuel oil is significant to the operating engineer because it ()Ais an indication of the amount of noncombustible material present in the oilBindicates the quantity of energy released by burning a unit amount of the fuelCis useful for determining proper atomization temperaturesDreflects the overall thermal efficiency of the fuel oil service system
单选题“Before disconnecting the oil pipe, would you flush the oil retained in the pipe?” asked the oil barge owner ()Aby using of fresh waterBwith compressed airCby using of sea waterDwith chemical compound
单选题How do the militants justify their kidnapping of oil workers?AThey argue that oil resources in the Niger Delta region are exhausting.BThey are not satisfied with the generous Pay of the oil workers.CThey claim that the Niger Delta region is off limit to foreign oil companies.DThey see their action as protest against the uneven distribution of the oil wealth.
单选题Who is in charge of the auxiliary boilers?()AThe chief engineerBThe second engineerCThe third engineerDThe fourth engineer
单选题An inland oil barge must have equipment available to remove an on-deck oil spill of at least().Aone barrelBtwo barrelsCfive barrelsDten barrels
单选题Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().AThe loading dockBThe midpoint of the bargeCWithin 25 feet of the pump engineDAbove the forward rake end