单选题The bunker barge will leave. Please ()(解开)the mooring lines.AtightBcutCreleaseDopen

单选题
The bunker barge will leave. Please ()(解开)the mooring lines.
A

tight

B

cut

C

release

D

open


参考解析

解析: 暂无解析

相关考题:

Would you please ____ the mooring lines ?A.adjustedB.adjustingC.adjustD.adjusts

Mooring winch should be equipped with mechanical brakes capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

Hanging a barge off means to ______.A.moor a damaged barge to the bank and leaveB.remove and deliver a loaded barge from a multiple towC.remove a barge while locking throughD.tow an empty barge astern

You are making tow.A loaded,open-hopper barge with independent tanks has placards,with alternating red and white quadrants,located at each side and end.You inspect the barge and find slight traces of water in the wing voids due to condensation.What should you do?A.Refuse to accept the barge until all wing voids are dryB.Accept the barge and when weather conditions permit run with the wing voids open to ventilate the spacesC.Accept the barge and periodically check the wing voidsD.Return the barge to the fleet and depart without the barge

Which barge in your tow would require a cargo information card to be carried in the pilothouse ________.A.A tank barge with a sign reading No Visitors,No Smoking,No Open LightsB.An open hopper barge carrying coalC.A gas-free chlorine bargeD.An empty(not gas-free)barge that last carried benzene

The ()(油驳) is a barge carrying oil.A、oil bargeB、oil shipC、pilot boatD、barge

Would you please ()the mooring lines ?A、adjustedB、adjustingC、adjustD、adjusts

在集合地点集合。()A、Meet in front of the muster station.B、Get hold of the ladder.C、Drop me a heaving line to lift my bag.D、A ship is made fast to the equipment by mooring lines.

Please tell deckhands to get ready for mooring fore and aft.()A、请告诉水手准备前后撇缆。B、请告诉水手准备带缆。C、请告诉水手准备带前后缆。D、请告诉水手准备前后系泊。

This mooring line is a little slack. Please ()it.A、fastB、fastenC、slack awayD、slack

他们应该注意装卸货情况。()A、They should pay attention to the safety of the ship.B、They should pay attention to the rise and fall of tide.C、They should pay attention to the conditions of loading and unloading.D、They should pay attention to take care of the mooring lines.

Please help me ()(解开) the guy.A、fastenB、unfastenC、moveD、shift

We will take bunker. Please ()(塞住) deck drains.A、plusB、plugC、punchD、put

及时调整缆绳。()A、Adjust the mooring lines on time.B、Adjust the mooring lines in time.C、Adjust the mooring lines quickly.D、Adjust the mooring lines slowly.

Would you please adjust the mooring lines?()A、请你调整一下缆绳好吗?B、请你调整一下舷梯好吗?C、请你调整一下引水梯好吗?D、请你调整一下软梯好吗?

单选题A loaded hopper barge with independent tanks has a placard,with alternating red and white quadrants,on each side and end. Which statement concerning this barge is TRUE?()AThe cargo will spontaneously ignite if released to the atmosphereBYou must operate this barge as a lead bargeCThe barge should be spotted as far away from the towboat as possibleDThe barge must be in a protected position within the tow

单选题You have orders to drop off a barge loaded with propylene oxide at a fleet.In doing so,you must ensure that().AAll wing voids and rakes are pumped dry before tying off the bargeBThe barge is moored next to the bank where it will be protected from a possible collisionCThe barge is under the care of a watchmanDA rake end is facing upstream to minimize the effect of current on the mooring lines

单选题The bunker barge will leave. Please ()(解开)the mooring lines.AtightBcutCreleaseDopen

单选题在集合地点集合。()AMeet in front of the muster station.BGet hold of the ladder.CDrop me a heaving line to lift my bag.DA ship is made fast to the equipment by mooring lines.

单选题A mooring system that results in a spread system without anchor buoys is called a().Apermanent chasing systemBwire rope mooring systemCshepherd's crook mooring systemDspring buoy mooring system

单选题Please tell deckhands to get ready for mooring fore and aft.()A请告诉水手准备前后撇缆。B请告诉水手准备带缆。C请告诉水手准备带前后缆。D请告诉水手准备前后系泊。

单选题他们应该注意装卸货情况。()AThey should pay attention to the safety of the ship.BThey should pay attention to the rise and fall of tide.CThey should pay attention to the conditions of loading and unloading.DThey should pay attention to take care of the mooring lines.

单选题Hanging a barge off means to().Amoor a damaged barge to the bank and leaveBremove and deliver a loaded barge from a multiple towCremove a barge while locking throughDtow an empty barge astern

单选题You are making tow.A loaded,open-hopper barge with independent tanks has placards,with alternating red and white quadrants,located at each side and end.You inspect the barge and find slight traces of water in the wing voids due to condensation.What().ARefuse to accept the barge until all wing voids are dryBAccept the barge and when weather conditions permit run with the wing voids open to ventilate the spacesCAccept the barge and periodically check the wing voidsDReturn the barge to the fleet and depart without the barge

单选题The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().AThe Charterers should sing new bunker contract with oil chandlersBThe Charterers can use the bunker contracts signed by the Owners with oil chandlersCThe Charterers shall not sign bunker contracts with oil chandlersDThe Charterers shall sign bunker contracts with oil chandlers

单选题A ship is made fast to the quayside by mooring lines. ()A船舶用锚停泊在锚地。B船舶用系泊缆绳挽牢在码头边。C船舶用缆绳系在浮筒上。D船舶用缆绳挽牢浮筒上。

单选题Would you please adjust the mooring lines?()A请你调整一下缆绳好吗?B请你调整一下舷梯好吗?C请你调整一下引水梯好吗?D请你调整一下软梯好吗?