单选题Company.com has an application that requires a serial connection for Electronic Data Interchange. What must be done to integrator the serial connection into an HACMP cluster?()A Use an RS3232/422 serial Y cable.B Alter the device settings to 9600 8/n/1 xon/xoff.C Use a network based terminal server for the serial connection.D Nothing because HACMP does not support native serial connection fallovers.
单选题
Company.com has an application that requires a serial connection for Electronic Data Interchange. What must be done to integrator the serial connection into an HACMP cluster?()
A
Use an RS3232/422 serial Y cable.
B
Alter the device settings to 9600 8/n/1 xon/xoff.
C
Use a network based terminal server for the serial connection.
D
Nothing because HACMP does not support native serial connection fallovers.
参考解析
解析:
暂无解析
相关考题:
During a planning meeting, Company.com indicates that they intend to make a relational Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab. How would this be managed in an HACMP environment?() A、 It can be started with a crontab entry.B、 It can be created as an Application Server.C、 It can be added to a resource group as a dependency.D、 It cannot be done because HACMP provides no method to order application start/stop scripts.
Company.com with a newly installed cluster has been checking the logfiles to determine if the cluster has had any recent activity. The non-IP RS232 heartbeat connection seems to be having a difficulty. The serial network goes down,and then a couple of minutes later comes back up again. This pattern is repeated many times in the log. If this system was installed without regard to best practices, what is the most likely problem with the serial network?() A、 The serial port is malfunctioning and needs to be repaired.B、 The baud rate is incorrectly specified in the AIX devices configuration.C、 The serial port is not a port approved to support HACMP heartbeat traffic.D、 The baud rate is incorrectly specified in the HACMP interface configuration.
Company.com has an application that has a hard-coded hostname in the startup routines. The application is being made highly available using HACMP. During testing, the application does not start on the standby node because the hostname was not what the application expected. What can be done to fix this problem?()A、 Manage the hostname in the application server start ands top scriptsB、 Nothing, because this application cannot be controlled by HACMP and should be startedwith /etc/inittabC、 Change the hard-coded hostname in the application startup routines to use the uname rather than the hostnameD、 Override the default ha_hostname in the cluster configuration to reflect the shared hostname rather than the default ha_hostname
Company.com has a six-node concurrent resource group with an application that is accessed by a web connection to the cluster nodes. How is the workload moved to another cluster node during a node failure?() A、 The concurrent application must control the web interface through application monitoring.B、 A second resource group will be required to move the web application and IP label to a new node during a node failure.C、 The concurrent resource group can support multiple IP labels through IP aliasing so all IP labels are defined in the concurrent resource group.D、 The dynamic node priority facility in HACMP will relocate the web application and the IP label,if it is correctly defined in the application start and stop script.
Company.com has non-IBM fibre attached storage. The storage is connected to a node in the cluster that has multiple adapters and virtual paths. There is a concern about detecting the loss of one of the fibre adapters since there is no indication to the administrator that one has failed. What feature of HACMP can be sued to assist with this issue?() A、 Disk heartbeatB、 Error notificationC、 Event notificationD、 Application monitor
Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()A、Create a VLAN between the web server and database server.B、Purchase APV and install the VIOS.C、Increase the priority of the Web server.D、Create separate LPARs for Web and database workloads.
Company.com has crated a process application monitor for an application that is initiated by a "c" Shell script. The application monitor is not functioning as designed. What could be the issue with eh application monitor?() A、 A process monitor cannot monitor an application started by a shell.B、 For process monitors to function correctly, they must use the "korn" shell.C、 A custom monitor cannot de3termine the status of applications started by shell scripts.D、 The process monitor script is not existing with a zero return code after checking the status of the application.
During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?() A、 Only one application server per resource group can be monitored.B、 Process monitoring is part of RSCT and requires no special scripts.C、 Any application can be monitored as long as it has an application server.D、 Having all application servers in one resource group improves recovery time.
Company.com has installed HACMP and is configuring a three-node cluster. One of the Applications uses the AIX hostname as a key for authorization to execute on the specific computer. The application vendor was contacted and consented to having multiple copies of the application but required that only one application be active at any one point in time. How can the AIX host name dependency be managed in an HACMP environment.() A、 It cannot be managed because the application will not work properly with HACMP.B、 The application start and stop script for the application can manage the hostname.C、 HACMP will require customization to correctly manage a change in the hostname since it is tied to the primary network adapter.D、 HACMP will have to be restarted if the hostname is changed. This can be done with customization in the node_up and node_down event scripts.
Company.com is implementing an HACMP solution. The application ahs a license key based on The hostname. The hostname is also the name used for one of the TCP/IP interfaces. The application vendor has worked with HACMP systems before and is aware of the issue. The preferred method for resolving this issue is to:() A、 include the hostname in the resource group definition.B、 include the license key in the resource group definition.C、 obtain a second license key for a "standby" system from the application vendor.D、 Set the hostname to be one of the TCP/IP interface included in a resource group.
A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()A、the production environment does not require an outageB、the production environment requires an outage to install the SVCC、the production environment requires an outage to install the DS8700D、the production environment requires an outage to remove the EMC systems
Your company has a server that runs Windows Server 2008 R2.You have a new application that locates remote resources by name. The new application requires IPv6.You need to ensure that the application can locate remote resources by using IPv6. What should you do?()A、CreateanewPointer(PTR)DNSrecord.B、CreateanewQuad-A(AAAA)DNSrecord.C、CreateanewSignature(SIG)DNSrecord.D、CreateanewRouteThrough(RT)DNSrecord.
单选题Company.com has an application that has a hard-coded hostname in the startup routines. The application is being made highly available using HACMP. During testing, the application does not start on the standby node because the hostname was not what the application expected. What can be done to fix this problem?()A Manage the hostname in the application server start ands top scriptsB Nothing, because this application cannot be controlled by HACMP and should be startedwith /etc/inittabC Change the hard-coded hostname in the application startup routines to use the uname rather than the hostnameD Override the default ha_hostname in the cluster configuration to reflect the shared hostname rather than the default ha_hostname
单选题Company.com with a newly installed cluster has been checking the logfiles to determine if the cluster has had any recent activity. The non-IP RS232 heartbeat connection seems to be having a difficulty. The serial network goes down,and then a couple of minutes later comes back up again. This pattern is repeated many times in the log. If this system was installed without regard to best practices, what is the most likely problem with the serial network?()A The serial port is malfunctioning and needs to be repaired.B The baud rate is incorrectly specified in the AIX devices configuration.C The serial port is not a port approved to support HACMP heartbeat traffic.D The baud rate is incorrectly specified in the HACMP interface configuration.
单选题Company.com has decided to use the FUBAR Application Server to host their web application. Unfortunately, the FUBAR Application Server uses the server machine’s file system for its JNDI namespace. Every JNDI lookup performed in the web application is translated into a file 1/0 operation, which results in very poor performance. Which J2EE pattern can help with this performance issue?()A Transfer ObjectB Service LocatorC Intercepting FilterD Model-View-Controller
单选题Your company has a server that runs Windows Server 2008 R2.You have a new application that locates remote resources by name. The new application requires IPv6.You need to ensure that the application can locate remote resources by using IPv6.What should you do?()ACreate a new Pointer (PTR) DNS record.BCreate a new Quad-A (AAAA) DNS record.CCreate a new Signature (SIG) DNS record.DCreate a new Route Through (RT) DNS record.
单选题A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()Athe production environment does not require an outageBthe production environment requires an outage to install the SVCCthe production environment requires an outage to install the DS8700Dthe production environment requires an outage to remove the EMC systems
单选题Company.com is implementing an HACMP solution. The application ahs a license key based on The hostname. The hostname is also the name used for one of the TCP/IP interfaces. The application vendor has worked with HACMP systems before and is aware of the issue. The preferred method for resolving this issue is to:()A include the hostname in the resource group definition.B include the license key in the resource group definition.C obtain a second license key for a standby system from the application vendor.D Set the hostname to be one of the TCP/IP interface included in a resource group.
单选题Company.com performs a cluster verification on a regular basis. Cluster verification is successfulbut the cluster sometimes fails to start the applications during a fallover. Investigation of the issue has revealed that the non-shared component of the application configuration information is not being kept up to date on the secondary nodes. What can be used to help resolve this issue?()A A pre-eventB Error notificationC Application monitoringD Custom verification methods
单选题Company.com has non-IBM fibre attached storage. The storage is connected to a node in the cluster that has multiple adapters and virtual paths. There is a concern about detecting the loss of one of the fibre adapters since there is no indication to the administrator that one has failed. What feature of HACMP can be sued to assist with this issue?()A Disk heartbeatB Error notificationC Event notificationD Application monitor
单选题Company.com has crated a process application monitor for an application that is initiated by a "c" Shell script. The application monitor is not functioning as designed. What could be the issue with eh application monitor?()A A process monitor cannot monitor an application started by a shell.B For process monitors to function correctly, they must use the korn shell.C A custom monitor cannot de3termine the status of applications started by shell scripts.D The process monitor script is not existing with a zero return code after checking the status of the application.
单选题Certkiller has an Active Directory forest with six domains. The company has 5 sites. The company requires a new distributed application that uses a custom application directory partition named ResData for data replication. The application is installed on one member server in five sites. You need to configure the five member servers to receive the ResData application directory partition for data replication. What should you do()ARun the Dcpromo utility on the five member servers.BRun the Regsvr32 command on the five member serversCRun the Webadmin command on the five member serversDRun the RacAgent utility on the five member servers
多选题A Company.com developer has created a web application that includes a servlet for each use case in the application. These servlets have become rather difficult to maintain because the request processing methods have become very large. There is also common processing code in many servlets because these use cases are very similar. Which two design patterns can be used together to refactor and simplify this web application? ()AProxyBView HelperCFront ControllerDSession FaçadeEBusiness DelegateFModel-View-Controller
单选题You are a systems administrator responsible for securing a Windows Server 2008 Web server. You havecreated a new Web site called Contoso Intranet that will contain seven Web applications. One of theapplication developers has told you that her Web application requires a new request handler that isprocessed using a .NET library her team created. How can you meet these requirements while also maximizing security for the server?()AAdd a new managed handler to the Contoso Intranet Web site.BAdd a new managed handler for the specific Web application that requires it.CAdd a new module mapping to the Contoso Intranet Web site.DAdd a new module mapping for the specific Web application that requires it.
单选题Company.com has installed HACMP and is configuring a three-node cluster. One of the Applications uses the AIX hostname as a key for authorization to execute on the specific computer. The application vendor was contacted and consented to having multiple copies of the application but required that only one application be active at any one point in time. How can the AIX host name dependency be managed in an HACMP environment.()A It cannot be managed because the application will not work properly with HACMP.B The application start and stop script for the application can manage the hostname.C HACMP will require customization to correctly manage a change in the hostname since it is tied to the primary network adapter.D HACMP will have to be restarted if the hostname is changed. This can be done with customization in the node_up and node_down event scripts.
单选题During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?()A Only one application server per resource group can be monitored.B Process monitoring is part of RSCT and requires no special scripts.C Any application can be monitored as long as it has an application server.D Having all application servers in one resource group improves recovery time.