单选题In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().AswivelBcathead spoolCdrawworksDstand pipe
单选题
In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().
A
swivel
B
cathead spool
C
drawworks
D
stand pipe
参考解析
解析:
暂无解析
相关考题:
I was driving to work yesterday, and it () as if smoke () out of the exhaust pipe. A.looks … cameB.looked … was comingC.is looking … cameD.looks … is looking
A life preserver or buoyant work vest is required to be worn on a ship when a person is ______.A.working on the rig floorB.working over waterC.working on the pipe racksD.operating line throwing equipment
A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps
If passengers are on board when an abandon ship drill is carried out,they should ______.A.take partB.watchC.go to their quartersD.stay out of the way and do what they want
Where must you record the date of each emergency training drill conducted on a ship ________.A.In the logbookB.In the Operations ManualC.On the Certificate of InspectionD.On the muster list
Any ship damaging a pipe could______an immediate danger of fire.A.meetB.faceC.be in font ofD.Follow
Which three service components are in the operate phase?()A、System MonitoringB、Operations ImplementationC、Incident and Problem ManagementD、Change ManagementE、Operations PlanF、Project Close Out
Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck
单选题Which of the following is not an operation mode of AIS?()AA ship-to-ship modeBA ship-to-shore modeCIntegrated with a vessel traffic systemDSending out information through broadcast automatically
单选题The main function of the drawworks on a ship is to().Atransport tubulars from the pipe racks to the derrick floorBmaintain constant tension on the marine riserCstore and secure the excess drill lineDlower and hoist the drill string into and out of the drilled hole
单选题()is applied to the area of the ship’s hull which is out of water when the ship is loaded.ABoottopping paintBTopside paintCBottom paintDPrimer
单选题What is TRUE about hoisting operations?()APersonnel may work beneath suspended loads,as long as they are alert and wear hard hatsBIf a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reachCIf tag lines are used to control a suspended load,they should be secured to the deckDPersonnel not involved in the hoisting operation should be kept clear of the transfer area
单选题() unit is mounted so as to raise and lower the cable from the spurling pipe, which is at the top and center of the chain or cable locker.AThe cable lifterBThe hoisting motorCThe topping wireDThe life-raft
单选题Smoking in bed on a ship is prohibited().Aat all timesBduring evening hoursCunless another person is presentDduring drilling operations
单选题If passengers are on board when an abandon ship drill is carried out,they should().Atake partBwatchCgo to their quartersDstay out of the way and do what they want
单选题During jacking operations and transit,empty void spaces in the hull of a jack up ship provide().AbuoyancyBextra storage spaceCadditional tank capacityDreduced stability
单选题A virtual rise in the center of gravity of a ship may be caused by().Afilling a partially filled tankBusing fuel from a pressed fuel tankCemptying a partially filled tankDtransferring pipe from the setback area to the pipe rack
单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().AliftsBcollarsCelevatorsDclamps
单选题A life preserver or buoyant work vest is required to be worn on a ship when a person is ().Aworking on the rig floorBworking over waterCworking on the pipe racksDoperating line throwing equipment
单选题Any ship damping a pipe could()an immedidate danger of fire.AmeetBfaceCbe in front ofDfollow
单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().Aclose and seal around the drill pipeBclose and seal around casingCcut off pipe inside the preventer stackDclose and seal around drill collars
单选题What will happen if the PSC officers find out your ship’s deficiencies? ()AWe must correct them.BOur ship will be detained.CEither A or BDNeither A nor B
单选题According to the ship regulations,the capacity of a liferaft is required to be marked().Aon the station billBon a sign next to the liferaftCon the Certificate of InspectionDin the Operations Manual
单选题(), where minor repairs are carried out with a ship service, often during a stay in portThis may be remote from a ship repair site.Avoyage repairsBroutine dockingCdamage repairsDconversion
单选题The signal given to commence lowering the lifeboats is().A3 short blasts of the ship's whistleB1 short blast of the ship's whistleC3 long blasts of the ship's whistleD1 long blast of the ship's whistle