单选题If the Charterer sends the vessel on her last voyage at a time when there is no expectation that she will be redelivered within a reasonable time of the end of the period of the Charterparty,and she is in fact redelivered late,he().Ahas properly fulfilled the contractBis not guilty of a breach of contractCis entitled a right to take legal action against any loss or damage he suffered in this connectionDis guilty of a breach of contract

单选题
If the Charterer sends the vessel on her last voyage at a time when there is no expectation that she will be redelivered within a reasonable time of the end of the period of the Charterparty,and she is in fact redelivered late,he().
A

has properly fulfilled the contract

B

is not guilty of a breach of contract

C

is entitled a right to take legal action against any loss or damage he suffered in this connection

D

is guilty of a breach of contract


参考解析

解析: 暂无解析

相关考题:

If the vessel encountered rough voyage,the captain of the vessel shall ________ his note of protest to harbor authorities after vessel's arrival.A.typewriteB.conveyC.submitD.take down

On a voyage charter party when the vessel is in port the charter will specify a definite period of time for loading or discharging of cargo by the Charterer.This time is called ________ .A.DemurrageB.DispatchC.Days of readinessD.Laydays

The term of Landfall means ________ .A.Land first sighted when vessel approaching from seawardB.Land last sighted when vessel leaving from a portC.in sight of one another when vessel underwayD.in sight of an island during a ship on her voyage

On a voyage charter,when a vessel is ready to load cargo,the Master should render to the charterer a ______.A.Notice of ReadinessB.Master Certificate of ServiceC.Shipmasters DeclarationD.Vessel Utilization and Performance Report

SEAWORTHINESS means ______ the vessel with her master and crew is herself fit to encounter the perils of the voyage and also that she is fit to carry the cargo safely on that voyage.A.whichB.whereC.whenD.that

A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the ______.A.vessel operator can collect demurrageB.ship is authorized extra time to discharge the cargoC.charterer must pay dispatch moneyD.effective period of the charter is extended

If the Charterer sends a vessel to an unsafe port,and she is damaged as a result,he will have to indemnify the ______.A.ReceiverB.Cargo ownerC.ShipownerD.Merchant

If the Charterer sends the vessel on her last voyage at a time when there is no expectation that she will be redelivered within a reasonable time of the end of the period of the Charterparty,and she is in fact redelivered late,he ______.A.has properly fulfilled the contractB.is not guilty of a breach of contractC.is entitled a right to take legal action against any loss or damage he suffered in this connectionD.is guilty of a breach of contract

______ is a charter form,in which the bare ship is chartered without crew and Charterer takes over the vessel with a minimum of restrictions.A.Time CharterB.Trip CharterC.Demise CharterD.Voyage Charter

Delivery of a vessel to a charterer is called ______.A.charteringB.dispatchingC.fixingD.tendering

The Captain enters into the Salvage Contract as the representative of ______.A.the owner of vesselB.the owner of vessel and her cargoC.the owner of vessel,her cargo and freightD.the owner of vessel,her cargo,freight and Charterer

That the possible deformation or fracture of the side shell plating or supporting structure due to the lightering activities between the time of the last annual survey and the departure on its last voyage is a potential contributing factor ______.A.deserves further considerationB.has been determined by ABSC.reveals that the vessel experienced heavy lossesD.has been the general consideration of ABS surveyors

A vessel engaged in mine clearance operations is called ______.A.a vessel restricted in her ability to maneuverB.a vessel not under commandC.a vessel constrained by her draughtD.a vessel not under way

单选题SEAWORTHINESS means()the vessel with her master and crew is herself fit to encounter the perils of the voyage and also that she is fit to carry the cargo safely on that voyage.AwhichBwhereCwhenDthat

单选题Which vessel is NOT classified as “restricted in her ability to maneuver” ().AA vessel picking up a navigation markBA vessel transferring cargo while underwayCA vessel whose anchor is fouledDA vessel in a towing operation that restricts the ability of the vessel and her tow to change their course

单选题Where a vessel is redelivered to the Shipowner and is not in the same good order as when delivered due to the Charterer’s fault,and repairs to her have to be effected in order to restore her to that condition,the Shipowner can()the cost of repairs and any loss of profit whilst she is being repaired.AwantBsendCdeliverDclaim

单选题On a voyage charter,when a vessel is ready to load cargo,the Master should render to the charterer a().ANotice of ReadinessBMaster Certificate of ServiceCShipmasters DeclarationDVessel Utilization and Performance Report

单选题A vessel towing where the tow prevents her from changing course shall carry().Aonly the lights for a vessel towingBonly the lights for a vessel restricted in her ability to maneuverCthe lights for a towing vessel and the lights for a vessel restricted in her ability to maneuverDthe lights for a towing vessel and the lights for a vessel not under command

单选题A vessel constrained by her draft may display().Athree all-round red lights instead of the lights required for a power-driven vessel of her classBthe same lights as a vessel restricted in her ability to maneuverCthree all-round red lights in addition to the lights required for a power-driven vessel of her classDthe lights for a power-driven vessel which is not under command

单选题A vessel constrained by her draft shall, when she overtakes a sailing vessel in a fairway,the sailing vessel is().Apriviledged vessel and keep her course and speedBburdened vessel and give way to othersCburdened vessel and keep course nad speedDpriviledged vessel and give way to others

单选题Delivery of a vessel to a charterer is called().AcharteringBdispatchingCfixingDtendering

单选题If the Charterer sends a vessel to an unsafe port,and she is damaged as a result,he will have to indemnify the().AReceiverBCargo ownerCShipownerDMerchant

单选题Leeway is the().Adifference between the true course and the compass courseBmomentum of a vessel after her engines have been stoppedClateral movement of a vessel downwind of her intended courseDdispla ement of a vessel multiplied by her speed

单选题The term of landfall means().Aland first sighted when vessel approaching from seawardBland last sighted when vessel leaving from a portCin sight of one another when vessel underwayDin sight of an island during a ship on her voyage

单选题When a vessel navigates in an area with a small underkeel clearance but with adequate space to take avoiding action she().Ashould not be regarded as a vessel constrained by her draughtBshould be regarded as a vessel constrained by her draughtCshall be regarded as a vessel restricted in her ability to maneuverDshould be regarded as a non-displacement vessel

单选题Which statement is TRUE,according to the Rules().AA vessel not under command shall keep out of the way of a vessel restricted in her ability to maneuverBA vessel not under command shall avoid impeding the safe passage of a vessel constrained by her draftCA vessel constrained by her draft shall keep out of the way of a vessel engaged in fishingDA vessel engaged in fishing while underway shall,so far as possible,keep out of the way of a vessel restricted in her ability to maneuver

单选题Leeway is the().Adifference between the true course and the compass courseBmomentum of a vessel after her engines have been stoppedClateral movement of a vessel downwind of her intended courseDdisplacement of a vessel multiplied by her speed