单选题By this time tomorrow, the ship ()its repair work in the engine room.Awill doBhas doneChad doneDwill have done
单选题
By this time tomorrow, the ship ()its repair work in the engine room.
A
will do
B
has done
C
had done
D
will have done
参考解析
解析:
暂无解析
相关考题:
This ship is bounding _____ Shanghai and due to reach the destination tomorrow. A. inB. forC. onD. out
() the storm, the ship would have reached its destination on time. A. But forB. In spite ofC. In case ofD. Because of
Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair
Cleaning, painting and repair work is known as ______.A.maintenance workB.sailor’s workC.daily work
When a ship were found its equipment does not correspond substantially with the particulars of the Certificate by a nominated surveyor and corrective actions unable to be taken, thenA.the Certificate would be withdrawnB.the ship owner would be finedC.the shipping company must be notified immediatelyD.the ship must proceed to the nearest appropriate repair yard for a repair without delay
In ILO Convention,Hours Of Work means ______.A.any time on board the shipB.short breaksC.time outside hours of workD.time during which seafarers are required to do work on account of the ship
Every ship should hoist ______ when approaching and entering ports.A.its flashing lightB.the ship’s nameC.its identificationD.its signal letters
The communications revolution has influenced both work and leisure and how we think and feel both about place and time,but there have been( )views about its economic,political,social and cultural implications.A.competitiveB.controversialC.distractingD.irrational
The maintenance work for sailors includes cleaning , repairing, and ()(涂漆) work on board a ship.A、paintingB、painterC、painD、pair
单选题The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().Aafter its arrival at the destinationBduring the ship's voyage at seaCbefore they come to the dockDduring the time when the loading or diacharging is going on
单选题()refers to the repair the ship every year.AVoyage repairBAnnual repairCPeriodical repairDSurvey check
单选题When the ship security alert system is activated, it shall not()Ainitiate a ship-to-shore security alertBtransmit a ship-to-shore security alertCinitiate an alert identifying the ship, its locationDraise a security alarm on-board the ship indicating that the ship is under threat
单选题The pilot will()your ship at 0800 hours tomorrow morning. Please keep stand by on channel 12.AgetBboardCgoDcome
单选题The ship will be responsible for the cargo loaded or unloaded().Aonly when the cargo is within its railBduring the time when loading or ynloading is going onCafter the cargo is checked by tallymenDas soon as loading or discharging begins
单选题On a ship,when may a work vest be substituted for a required life preserver?()ATo replace a damaged life preserverBFor use during fire drillsCFor use during boat drillsDAt no time
单选题With the flood, the ship would have reached its destination on time.AIn case of BIn spite ofCBecause of DBut for
单选题The condition where a ship on the end of a tow line is riding a wave crest at the same time as its tug rides a wave crest is known as riding in().AsynchronismBharmonyCcheckDstep
单选题However, where immediate action is necessary to ensure safety of the ship, its machinery and crew, it must be taken by the engineer in chargeWhat dose “it” mean in the sentence above?()AsafetyBthe ship, its machinery and crewCimmediate actionDthe engineer in charge
单选题The notice of casualty to a ship must include().Aa request for assistanceBthe location of the unit at the time of the casualtyCan estimate of the cost to repair damagesDthe amount of fuel remaining
单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.Ahammering and jarringBvibration and poundingCvarying magnetic fieldsDstable or permanent magnetism of the ship
单选题(), where minor repairs are carried out with a ship service, often during a stay in portThis may be remote from a ship repair site.Avoyage repairsBroutine dockingCdamage repairsDconversion