单选题Vessel shall possess()valid for duration of charter Party showing winches and derricks in order.AInternational Cargo Gear CertificateBInternational Loadline CertificateCInternational Safety Construction CertificateDInternational Seaman Identification

单选题
Vessel shall possess()valid for duration of charter Party showing winches and derricks in order.
A

International Cargo Gear Certificate

B

International Loadline Certificate

C

International Safety Construction Certificate

D

International Seaman Identification


参考解析

解析: 暂无解析

相关考题:

On a voyage charter party when the vessel is in port the charter will specify a definite period of time for loading or discharging of cargo by the Charterer.This time is called ________ .A.DemurrageB.DispatchC.Days of readinessD.Laydays

Vessel shall possess International Cargo Gear Certificates ______ duration of Charter Party showing winches and derricks in order.A.validity inB.valid forC.effective atD.effectiveness for

A vessel used for international service shall possess ______ valid for duration of charter party showing winches and derricks in order.A.International Cargo Gear CertificateB.International Loadline CertificateC.International Safety Construction CertificateD.International Seaman Identification

At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be ______.A.at the discretion of the inspector,but in no greater detail than required for original certificationB.at the discretion of the inspector,but in no lesser detail than required for original certificationC.generally similar in scope to the inspection required for certification,but in less detailD.equivalent to the inspection required for certification

A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the ______.A.vessel operator can collect demurrageB.ship is authorized extra time to discharge the cargoC.charterer must pay dispatch moneyD.effective period of the charter is extended

If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders ______ liable to pay demurrage or damages for detention,as the case may be.A.himselfB.the ownerC.himD.the shipper

The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ______.A.BareboatB.DispatchC.VoyageD.Demise

A vessel has a charter party for one voyage to carry a full load of manganese from Durban,South Africa,to Baltimore,Maryland,at a stipulated rate per ton. Which type of contract is involved? ______.A.Bareboat charter partyB.Voyage charter partyC.Demise charter partyD.Time charter party

The owners of the S.S. Short Haul agree to a charter with the Longsplice Steamship Company. The owners stipulate in the charter party that the regular Master must be employed as the vessel's Master for the entire life of the contract. Which charter has beA.BareboatB.LeaseC.TimeD.Voyage

In accordance with Bareboat Charter,______ and the mortgagee(s)advised of the intended employment,planned dry-docking and major repairs of the Vessel,as reasonably required.A.the Charterers shall keep the OwnersB.the Charterers shall keep the ShippersC.the Owners shall keep the CharterersD.the Owners shall keep the Shippers

In Bareboat Charter,the Owners and Charterers shall ______ appoint surveyors for the purpose of determining and agreeing in writing the condition of the Vessel at the time of delivery and redelivery hereunder.A.eachB.jointlyC.severallyD.both together

Failure to comply with the clauses of charter party may result in action ______against the vessel.A.be makingB.being takenC.being madeD.be taking

翻译:In the event the demurrage is not paid in accordance with the above, the Owners shall give the Charterers 96 running hours written notice to rectify the failure. If the demurrage is not paid at the expiration of this time limit and if the vessel is in or at the loading port, the Owners are entitled at any time to terminate the Charter Party and claim damages for any losses caused thereby.

翻译:all bills of lading issued under this charter party shall be endorsed“the printed clauses of the bill of lading shall stand null and void of they are not in conformity with the charter party.”

单选题It is an()condition precedent in every voyage charter-party that the ship shall proceed on the voyage without departure from her proper course.AimplementedBimpliedCimpossibleDimproper

单选题At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().Aat the discretion of the inspector,but in no greater detail than required for original certificationBat the discretion of the inspector,but in no lesser detail than required for original certificationCgenerally similar in scope to the inspection required for certification,but in less detailDequivalent to the inspection required for certification

单选题A vessel has a charter party for one voyage to carry a full load of manganese from Durban,South Africa,to Baltimore,Maryland,at a stipulated rate per ton. Which type of contract is involved? ()ABareboat charter partyBVoyage charter partyCDemise charter partyDTime charter party

单选题A vessel used for international service shall possess ()valid for duration of charter party showing winches and derricks in order.AInternational Cargo Gear CertificateBInternational Loadline CertificateCInternational Safety Construction CertificateDInternational Seaman Identification

单选题Where a time charter-party is wrongfully(),the Charterer is entitled to claim damages amounting the difference between the contract rate for the balance of the period of the charter-party and the market rate for the chartering a substitute vessel.AreproducedBrepatriatedCrepudiatedDrecovered

问答题翻译:all bills of lading issued under this charter party shall be endorsed“the printed clauses of the bill of lading shall stand null and void of they are not in conformity with the charter party.”

单选题Vessel shall possess International Cargo Gear Certificates () duration of Charter Party showing winches and derricks in order.Avalidity inBvalid forCeffective atDeffectiveness for

单选题Sometimes the charter-party()that the vessel must only use safe ports within a certain area.AimprovesBinstallsCcontainsDrequests

单选题A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the().Avessel operator can collect demurrageBship is authorized extra time to discharge the cargoCcharterer must pay dispatch moneyDeffective period of the charter is extended

单选题The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ().ABareboatBDispatchCVoyageDDemise

单选题The owners of the S.S. Short Haul agree to a charter with the Longsplice Steamship Company. The owners stipulate in the charter party that the regular Master must be employed as the vessel’s Master for the entire life of the contract. Which charter has be ().ABareboatBLeaseCTimeDVoyage

单选题If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.AhimselfBthe ownerChimDthe shipper

问答题翻译:In the event the demurrage is not paid in accordance with the above, the Owners shall give the Charterers 96 running hours written notice to rectify the failure. If the demurrage is not paid at the expiration of this time limit and if the vessel is in or at the loading port, the Owners are entitled at any time to terminate the Charter Party and claim damages for any losses caused thereby.