A dead reckoning (DR) plot ______.A.must utilize magnetic coursesB.must take set and drift into accountC.should be replotted hourlyD.should be started each time the vessel’s position is fixed
A dead reckoning (DR) plot ______.
A.must utilize magnetic courses
B.must take set and drift into account
C.should be replotted hourly
D.should be started each time the vessel’s position is fixed
相关考题:
During a recent OSPF election among three routers, RTA was elected the DR and RTB was elected the BDR, as seen in the graphic. Assume that RTA fails, and that RTB takes the place ofthe DR whi le RTC becomes the new BDR. What will happen when RTA comes back online?()A. A new election will take place establishing an all new DR and BDR based on configured priority levels and MAC addresses.B. RTA will take the place of DR immediately upon esta blishing its adjacencies.C. RTA will take the place of DR only if RTB fails.D. RTA will take the place of DR only if both RTB and RTC fail.
A network administrator is troubleshooting the OSPF configuration of routers R1 an dR2.The routers cannote stablish an adjacency relation ship on their common Ethernet link.The graphic shows the output of the show ip ospf interface e0 command for routers R1 an dR2.Based on the information in the graphic,what is the cause of this problem?()A.The OSPF area is not configured properly.B.The priority on R1 should be set higher.C.The cost on R1 should be set higher.D.The hello and dead timers are not configured properly.E.A backup designated router needs to be added to the network.F.The OSPF process ID numbers must match.
A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ______.A.fixB.running fixC.estimated positionD.dead-reckoning position
A chart position enclosed by a semi-circle is a(n) ______.A.fixB.estimated positionC.dead reckoning positionD.running fix
A single line of position combined with a dead-reckoning position results in a(n) ______.A.estimated positionB.assumed positionC.fixD.running fix
Which statement concerning current is TRUE ________.A.Current can be determined by measuring the direction and distance between simultaneous EP and DR positionsB.The drift of the current should be averaged out on a one hour basisC.After the current is determined,it should not be used for further plotting because it is an unknown variableD.The distance between a simultaneous DR position and fix is equal to the drift of the current
Which magnetic compass corrector(s)CANNOT be set on a heading of magnetic east or magnetic west ________.A.Heeling magnetB.Flinders barC.Fore-and-aft magnetsD.All of the above can be set on magnetic east or magnetic west headings
The most accurate method of determining gyrocompass error while underway is by ______.A.Comparing the gyro azimuth of a celestial body with the computed azimuth of the bodyB.Comparing the gyro heading with the magnetic compass headingC.Determining from the chart the course made good between celestial fixesD.It cannot be determined accurately at sea due to drift of unknown currents
Which magnetic compass corrector(s)can be set while the vessel is on a heading of magnetic north or magnetic south ________.A.Quadrantal spheresB.Heeling magnetsC.Flinders barD.Fore-and-aft magnets
A wind vane on a moving vessel shows ______.A.dead reckoning wind directionB.true wind directionC.apparent wind directionD.estimated wind direction
A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs, which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()A、 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.B、 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.C、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.D、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.
A system has a critical need for network services on a small network with a limited number of hosts. System overhead is not a concern. Which of the following should the system administrator do to help ensure connectivity in the event of a gateway failure?()A、Use the ifconfig command to enable dead gate detectionB、Use the no command to set active dead gateway detectionC、Use the route command to set active dead gateway detectionD、Add the line active_dgd=1 to the /etc/gated.conf command and refresh the gated daemon
单选题You should plot your dead reckoning position().Awhen you obtain an estimated positionBonly in piloting watersCat every speed changeDAll of the above are correct
单选题You should plot your dead reckoning position at().Aevery fix or running fixBevery course changeCevery speed changeDAll of the above are correct
单选题You should plot your dead reckoning position().AFrom every fix or running fixBFrom every estimated positionCEvery three minutes in pilotage watersDOnly in pilotage waters
单选题The drift and set of tidal,river,and ocean currents refer to the().Aposition and area of the currentBspeed and direction toward which the current flowsCtype and characteristic of the current's flowDNone of the above
单选题A tug is approaching a broken down steamer in moderately heavy weather preparing to take it in tow. In most cases the().Asteamer will drift stern downwindBtug will drift faster than the steamerCtug should approach stern toDtug should approach from downwind
单选题A dead reckoning (DR) plot().Amust utilize magnatic coursesBmust take set and drift into accountCshould be replotted hourlyDshould be started each time the vessels position is fixed
单选题A dead reckoning (DR) plot().Amust utilize magnetic coursesBmust take set and drift into accountCshould be replotted hourlyDshould be started each time the vessel's position is fixed
单选题A dead reckoning (DR) plot().Aignores the effect of surface currentsBis most useful when in sight of landCmust be plotted using magnetic coursesDmay be started at an assumed position
单选题Which magnetic compass corrector(s)CANNOT be set on a heading of magnetic east or magnetic west().AHeeling magnetBFlinders barCFore-and-aft magnetsDAll of the above can be set on magnetic east or magnetic west headings
单选题Which magnetic compass corrector(s)can be set while the vessel is on a heading of magnetic north or magnetic south().AQuadrantal spheresBHeeling magnetsCFlinders barDFore-and-aft magnets
单选题The most accurate method of determining gyrocompass error while underway is by().AComparing the gyro azimuth of a celestial body with the computed azimuth of the bodyBComparing the gyro heading with the magnetic compass headingCDetermining from the chart the course made good between celestial fixesDIt cannot be determined accurately at sea due to drift of unknown currents
单选题A single line of position combined with a dead-reckoning position results in a(n)().Arunning fixBfixCestimated positionDassumed position
单选题At 2200 you take the following loran readings: 9960-W-15064.5; 9960-Y-43954.8. Which statement is TRUE? ()AThe current is floodingBYou are being set to the left of the trackCThe set is towards the southwestDThe drift is 0.6 knot.
单选题The winds with the greatest effect on the set,drift,and depth of the equatorial currents are the().AdoldrumsBhorse latitudesCtrade windsDprevailing westerlies
单选题Which statement concerning current is TRUE().ACurrent can be determined by measuring the direction and distance between simultaneous EP and DR positionsBThe drift of the current should be averaged out on a one hour basisCAfter the current is determined,it should not be used for further plotting because it is an unknown variableDThe distance between a simultaneous DR position and fix is equal to the drift of the current