In anchoring orders, WALK BACK THE CHAIN means ______.A.pay away the chainB.check up the chainC.take a strain on the chainD.take in the chain

In anchoring orders, WALK BACK THE CHAIN means ______.

A.pay away the chain

B.check up the chain

C.take a strain on the chain

D.take in the chain


相关考题:

Which two statements are true about a job chain?() A. A job chain can contain a nested chain of jobs.B. The jobs in a job chain cannot have more than one dependency.C. A job of the CHAIN type can be run using event-based or time-based schedules.D. The jobs in a job chain can be executed only by using the events generated by the Scheduler

Which of the following must occur when installing SCSI devices into the server?() A. Terminate the back end of the chain.B. Set the jumper to device ID 0.C. Terminate both ends of the chain.D. Set the jumper to cable select.

A chain stripper is used to ______.A.prevent chain from clinging to the wildcatB.clean the marine debris from the chainC.flake chain from a boat's chain lockerD.clean chain prior to an x-ray inspection

What are the two main types of stud link chain ________.A.Oil Rig chain and Oil Field Stud Link chainB.Flash-butt welded chain and Di-Lok chainC.Flash-butt welded chain and Oil Rig chainD.Oil Field Stud Link chain and Flash-butt welded chain

In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack

Where is()(制链器螺杆)?A、compressor barB、chain linkC、chain stopperD、chain locker

Which of the following must occur when installing SCSI devices into the server?()A、 Terminate the back end of the chain.B、 Set the jumper to device ID 0.C、 Terminate both ends of the chain.D、 Set the jumper to cable select.

Which two statements are true about a job chain?()A、 A job chain can contain a nested chain of jobsB、 The jobs in a job chain cannot have more than one dependencyC、 A job of the CHAIN type can be run using event-based or time-based schedulesD、 The jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题In anchor orders, “Up and down” means “()”.AThe chain is not uprightBThe chain is uprightCThe chain is slackDThe chain is not slack

单选题In anchoring orders, up and down means().Athe chain is not uprightBthe chain is tightCthe chain is uprightDthe chain is slack

单选题When anchoring,it is a common rule of thumb to use a length of chain().Afive to seven times the depth of waterBseven to ten times the depth of waterCtwice the depth of waterDtwice the depth of water plus the range of tide

单选题What are the two main types of stud link chain().AOil Rig chain and Oil Field Stud Link chainBFlash-butt welded chain and Di-Lok chainCFlash-butt welded chain and Oil Rig chainDOil Field Stud Link chain and Flash-butt welded chain

单选题When a deck cargo is secured with chain or wire lashings and grab (pear) links,which statement is FALSE?()AThe amount of take-up is limited by the length of the turnbuckleBAt the grab (pear) link,the slack end of chain should be led back and secured to the chain above the linkCThe lashings should be inspected each day and any slack taken upDThe turnbuckle should be secured with a stick or lock nuts

单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().Athe vessel has enough room to swing while at anchorBthe anchor flukes bite into the ocean bottomCthere is a sufficient scope of chain to keep the anchor on the bottomDthere is more chain out than there is in the chain locker

单选题A common means of connecting shots of anchor chain in the field is to use a().AsprocketBKenter linkCswivelDend shackle

单选题In anchoring orders, “Weigh anchor” means “()”.APay away the chainBTake in the chainCCheck up the chainDDrop the anchor

单选题()is used for heaving up and slacking away the anchor and chain.AA winchBA windlassCA deck craneDA lifeboat engine

单选题When anchoring,good practice requires 5 to 7 fathoms of chain for each fathom of depth. In deep water you should use().Athe same ratioBmore chain for each fathom of depthCless chain for each fathom of depthDtwo anchors with the same ratio of chain

单选题After deploying the anchor,a permanent chain chaser is().Aremoved from the anchor chainBconnected to a buoy at the anchorCstripped back to the rig and securedDconnected to a buoy halfway down the chain

单选题Which of the following must occur when installing SCSI devices into the server?()A Terminate the back end of the chain.B Set the jumper to device ID 0.C Terminate both ends of the chain.D Set the jumper to cable select.

单选题When anchoring a small sailing vessel in rough weather,the best anchor line would be composed of().Achain-wireBchain-manilaCchain-nylonDall chain

单选题A chain stripper is used to().Aprevent chain from clinging to the wildcatBclean the marine debris from the chainCflake chain from a boat's chain lockerDclean chain prior to an x-ray inspection

多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobsBThe jobs in a job chain cannot have more than one dependencyCA job of the CHAIN type can be run using event-based or time-based schedulesDThe jobs in a job chain can be executed only by using the events generated by the Scheduler

单选题In anchoring orders, walk back the chain means().Apay away the chainBtake in the chainCcheck up the chainDtake a strain on the chain

单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().Athe vessel has enough room to swing while at anchorBthe anchor flukes bite into the ocean bottomCthere is sufficient weight from the anchor and chain to prevent draggingDthere is more chain out than there is in the chain locker

单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()AOne shot of chain for every ten feet of waterBOne shot of chain for every fifteen feet of waterCOne shot of chain for every thirty feet of waterDOne shot of chain for every ninety feet of water

单选题When anchoring a vessel under normal conditions,which scope of chain is recommended? ()AFour times the depth of waterBTwo and one-half times the depth of waterCFive to seven times the depth of waterDFifteen times the depth of water