The revolution of machinery could __________without a new source of both movable and constant power in the new century.A. be born B. not have been born C. have been born D. have born

The revolution of machinery could __________without a new source of both movable and constant power in the new century.

A. be born
B. not have been born
C. have been born
D. have born

参考解析

解析:考查虚拟语气。当从句中出现without/ but for 等词时,主句要用虚拟语气,根据句意,如果没有新能源,机械改革不会诞生,再结合整句话的时态,应该用could not have been born。

相关考题:

The new executive has done well to make the wholesaler agree________ A.that could benefit both of us.B.then he could get a large discount.C.that is made with certain conditions.D.to be more flexible over terms of payment.

He made a new year _____to read for an hour every day.A:resolutionB:determinationC:appreciationD:revolution

according to the author, the articles of confederation failed because of the following reasons. which is not true?A. The Congress could not raise money to pay the national army and to pay debts owed to France and other nations.B. The Congress had no power to tax any citizen.C. The new states did not cooperate with the Congress or with each other.D. Some new states wanted to be free from the Union

The API changes should provide both source and binary (71) for programs written to the original API.That is,existing program binaries should continue to operate when run on a system supporting the new API.In addition,existing (72) that are re-compiled and run on a system supporting the new API should continue to operate.Simply put,the API (73) for multicast receivers that specify source filters should not break existing programs.The changes to the API should be as small as possible in order to simplity the task of converting existing (74) receiver applications to use source filters.Applications should be able to detele when the new (75) filter APIs are unavailable(e.g., calls fail with the ENOTSUPP erroe) and react gracefully(e.g., revert to old non-source-filter API or display a meaningful error message to the user).71.A.capabilityB.compatibilityC.labialityD.reliability

I hereby ______ that my vessel is fitted with a rudder angle indicator and an engine revolution indicator on the bridge in such a position that the pilot may read both without having to move away from his station; and that the rudder angle indicator and engine revolution indicator are in good working condition.A.delayB.stateC.deleteD.contain

Under INSTITUTE TIME CLAUSES-Hulls,Claims payable ______.A.with deduction new for oldB.without deduction new for oldC.with deduction old for newD.without deduction old for new

Which statement concerning reserve sources of energy for GMDSS is FALSE ________.A.While the ship is at sea,there must be available at all times a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source of energyB.Both the VHF and MF/HF installations must be simultaneously suppliedC.A means of ensuring a continuous supply of electrical power must be provided to all GMDSS equipment that could be affected by an interruption in powerD.If a UPS or equivalent is used to supply power to the ship's GPS receiver or other source of positional information,a means must be provided to ensure the continuous supply of the information in the event of a failure to the ship's main or emergency source of power

I could scarcely keep pace( )the new discoveries in biology.with

The API changes should provide both source and binary( )for programs written to the original API.That is, existing program binaries should continue to operate when run on a system supporting the new API.In addition, existing()that are re-compiled and run on a system supporting the new API should continue to operate.Simply put, the AP(I ) for multicast receivers that specify source filters should not break existing programs.The changes to the API should be as small as possible in order to simplicity the task of converting existing() receiver applications to use source filters. Applications should be able to delete when the new(_______) filter APIs are unavailable(e.g., calls fail with the ENOTSUPP error) and react gracefully(e.g., revert to old non-source-filter API or display a meaningful error message to the user).横线处应选( )。 A. resourceB. stateC. destinationD. source

Which two of these statements correctly describe classic PIM-SM?()A、The IOS default is for a last-hop router to trigger a switch to the shortest path tree as soon as a new source is detected on the shared tree.B、The IOS default is for every one of the routers on the shared tree to trigger a switch to the shortest path tree as soon as a new source is detected on the shared tree.C、The default behavior of switching to the shortest path tree as soon as a new source is detected on the shared tree can be disabled by setting the value in the ip pim spt-threshold command to "infinity."D、The default behavior of switching to the shortest path tree as soon as a new source is detected on the shared tree can be disabled by setting the value in the ip pim spt-threshold command to "zero."

What command would an operator use to move a file from the /old_dir directory to the /new_dir directory without changing the file name?()A、mv /old_dir/file /new_dirB、mv -p /old_dir/file /new_dirC、mv -k /old_dir/file /new_dirD、mv /old_dir/file /new_dir/new_file

After installing a second processor and corresponding heatsink into a server, an administrator notices that the new processor is not showing up during POST.  Which of the following could be the cause of this issue?()A、 The power supply is not sufficient to power the server.B、 The voltage regulator module (VRM) was not installed.C、 The IRQ setting was not set.D、 The DMA setting was not set.

A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()A、The monitor cannot display the increased resolution that is a feature of the new graphics card.B、The power supply does not provide enough wattage to power the new graphics card.C、The new graphics card is incompatible with the existing processor.D、The computer does not have enough RAM to support the new graphics card.

Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A、Include a new HMC in the order to connect to the p5 595B、Include a pair of new HMCs in the order to connect to the p5 595C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()AA desk, as it not rack mountableBEthernet connections to the POWER5 systemsCSerial connections to the POWER5 systemsDUSB connections for the keyboard and mouse

单选题The term power-driven vessel means()in these Rules.Aany sailing vessel with propelling machineryBany vessel propelled by machineryCany sailing vessel with or without machinery for propellingDany sailing vessel with propelling machinery not in use

单选题We have done all we could and now our cherished project is at the mercy of our new CEO.Aunder the guidance ofBin the power ofCwith the guidance ofDon the agenda of

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

多选题A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()AInstall the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra coolingBEnsure a 260V power source for the x445 and BladeCenter is available for fully redundant powerCEnsure a 220v power source for the x445 is available for fully redundant powerDInstall the new 10GBit Ethernet network to take advantage of the new network switch in the x445.EHave their Network Operation Staff review and assist connecting the new server to their existing network.

单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()AThe monitor cannot display the increased resolution that is a feature of the new graphics card.BThe power supply does not provide enough wattage to power the new graphics card.CThe new graphics card is incompatible with the existing processor.DThe computer does not have enough RAM to support the new graphics card.

单选题After installing a second processor and corresponding heatsink into a server, an administrator notices that the new processor is not showing up during POST.  Which of the following could be the cause of this issue?()A The power supply is not sufficient to power the server.B The voltage regulator module (VRM) was not installed.C The IRQ setting was not set.D The DMA setting was not set.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMCBAsynchronous adapters on the new HMCCThe two 570 servers are directly connected to the new HMCDOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMC