A test case normally consists of a unique identifier, requirement references from a design specification, events,aseries of stepsto follow, input,output, actual result, and() 。A.bugB.expected resultC.test reportD.traceability matrix

A test case normally consists of a unique identifier, requirement references from a design specification, events,aseries of stepsto follow, input,output, actual result, and() 。

A.bug
B.expected result
C.test report
D.traceability matrix

参考解析

解析:一个测试用例通常由一个惟一的标识符,要求引用从设计规范、事件、一系列的效仿,比如输入、输出,实际结果,和预期的结果。

相关考题:

● Information systems design is defined as those tasks that focus on the specification of a detailed computer-based solution. Typically, there are four systems design tasks for in-house development.1) The first task is to specify (71) , which defines the technologies to be used by one, more, or all information systems in terms of their data, processes, interfaces, and network components. This task is accomplished by analyzing the data models and process models that are initially created during requirements analysis.2) The next systems design task is to develop the (72) . The purpose of this task is to prepare technical design specifications for a database that will be adaptable to future requirements and expansion.3) Once the database prototype has been built, the systems designer can work closely with system users to develop input, output and dialogue specifications. The (73) must be specified to ensure that the outputs are not lost, misrouted, misused, or incomplete.4) The fourth design task involves packaging all the specifications from the previous design tasks into a set of specifications that will guide the (74) activities during the following phases of the systems development methodology.Finally, we should (75) and update the project plan accordingly. The key deliverable should include a detailed plan for the construction phase that should follow.(71)A. an application architectureB. a distributed systemC. a system scopeD. a system physical model(72)A. database design specificationsB. database organization decisionsC. data structure specificationsD. data distribution decisions(73)A. format and layoutB. transaction detailsC. additional instructionsD. internal controls(74)A. system administrator’sB. system analyst’sC. computer programmer’sD. system designer’s(75)A. adjust the project scheduleB. reevaluate project feasibilityC. evaluate vendor proposalsD. select the best vendor proposal

● A test case normally consists of a unique identifier, requirement references from a design specification, events, a series of steps to follow,input, output, actual result, and (71)(71)A. bugB. expected resultC. test reportD. traceability matrix

要以读方式打开D盘根目录上的一个顺序文件 Test.txt,应使用的语句是( )。 A、Open "Test.txt" For Output As #1B、Open "D:\Test.txt" For Input As #1C、Open "D:\Test.txt" For Output As #1D、Open "Test.txt" For Input As #1

please draw the transistor level schematic of a cmos 2 input AND gate and explain which please draw the transistor level schematic of a cmos 2 input AND gate and explain which input has faster response for output rising edge.(less delay time)。(威盛笔试题circuit design-beijing-03.11.09)

● Which statement about the preliminary design stage of a software development project is true? (75) .(75)A.The preliminary design is an internal document used only by programmersB.The preliminary design is the result of mapping product requirements info software and hardware functionsC.The preliminary design of the product comes from the requirement specificationD.The developers produce the preliminary design by defining the software structure in enough detail to permit coding

please draw the transistor level schematic of a cmos 2 input AND gate andexplain which input has faster response for output rising edge.(less delaytime)。(威盛笔试题circuit design-beijing-03.11.09)

Program( )describes programs objectives, desired output, input data required, processing requirement, and documentation.A.specification B.flowchart C.structure D.address

● Basically, a computer consists of five components: (71), memory, storage, input device and output device.(71)A.keyboardB.mouseC.monitorD.CPU

When steering by hand,which of the following may be a functional input to the steering gear as a result of turning the wheel ________.A.Non-follow-upB.Rudder adjustmentC.Weather adjustmentD.All the above may be activated

Program(73)describes program's objectives, desired output, input data required, processing requirement, and documentation.A.specificationB.flowchartC.structureD.address

Program( )describes program's objectives,desired output,input data required,processing requirement,and documentation.A.specificationB.flowchartC.structureD.address

Software system test plan needs to be compiled in( )phase。软件系统测试计划需要在( )阶段编制。A.requirement analysis需求分析B.Outline design概要设计C.detailed design详细设计D.Coding phase编码阶段

下列选项中属于过滤流Filter Input Stream的子类的是()。A、Data Input StreamB、Data Output StreamC、Print StreamD、Buffered Output Stream

You are designing a test plan for an existing Windows Azure .NET 4 application.  Method calls return incorrect results for certain input parameters.   You need to recommend an approach for debugging the method calls.  What should you recommend?()  A、 Attach the remote debugger to the application.B、 Use the Microsoft Visual Studio 2010 Test Manager tool.C、 Use IntelliTrace to collect only eventsfrom the application.D、 Use IntelliTrace to collect events and call information from the application.

Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:()。A、Implementation PlanB、Business PlanC、Staging PlanD、Detailed Design DevelopmentE、Systems Acceptance Test Plan Development

Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:()。A、Detailed Design DevelopmentB、Systems Acceptance Test Plan DevelopmentC、Staging PlanD、Implementation Plan DevelopmentE、Project Kick-off

A system administrator used the savevg command to back up the testvg each night. There is now a requirement to exclude the /test/static filesystem from the backup. How can this be accomplished?()A、Use the -X flag on the savevg commandB、Put an entry in the /etc/exclude.testvg fileC、Remove the /test/static entries from the /vgdata/testvg.data fileD、Use the touch command to create /test/static/.exclude before using savevg

在自动驾驶的诊断页面中有哪些方式?A、INPUT,OUTPUT,DIAGNOSTICSB、INPUT,REPORT,DIAGNOSTICSC、REPORT OUTPUT DIAGNOSTICSD、REPORT,INPUT,OUTPUT

单选题The test of a towing vessel’s steering gear control system includes each item EXCEPT().Aa test from the alternative power supply,if installedBtiming the movement of the rudder from hard over to hard overCverification that the rudder angle indicator shows the actual position of the rudder(s)Dvisual inspection of the steering linkage

单选题Which conditions will normally cause a SART to operate in the active mode?()AIt will respond only to interrogation by 9-Ghz radar signalsBA SART will normally respond to interrogation from a searching vessel's radar if the radar antenna is at least 15 meters highCA SART will normally respond to interrogation from a searching aircraft's radar if the radar's output power is at least 10,000 watts and the aircraft is at a height of 3000 feet and within 30 nautical milesDAll of the above

多选题Which of the following information will be gathered by the SQL Test Case Builder for the problems pertaining to SQL-related problems?()AADR diagnostic filesBall the optimizer statisticsCinitialization parameter settingsDPL/SQL functions,procedures,and packagesEthe table and index definitions and actual data

单选题The configuration of a Web Services Security management (WSSM) Partner allows for the specification of XSL mapping rules. What is the input and output of these XSL mapping rules?()AThe input to the XSL mapping rules of a WSSM Partner is the binary security token as received on the Web Service request. The output of the mapping rules is a new security token ready for use by the Web Service application. BThe input to the XSL mapping rules of a WSSM Partner is an STSUniveralUser XML document created from the security token received on the Web Service request. The output of the mapping rules is an arbitrary collection of attributes that will be made available to the Web Services application. CThe input to the XSL mapping rules of a WSSM Partner is an STSUniveralUser XML document created from the security token received on the Web Service request. The output of the mapping rules is a new STSUniversalUser XML document that represents the security token required by the application. DThe input to the XSL mapping rules of a WSSM Partner is an STSUniveralUser XML document created from the security token received on the Web Service request. The output of the mapping rules is an IBM Tivoli Access Manager for e-business credential that will be used to authorize the partner's access to the Web Service application.

单选题You are developing a Windows Presentation Foundation (WPF) application. You are implementing a test strategy for the application. You need to ensure that the test class can repeat user input. From which base class should the test class inherit?()AAutomationElementIdentifierBAutomationPeerCKeyboardDUICues

单选题Which implement phase service component consists of preparing for migration,excuting a network migration plan,and completing migration test cases?()Astaging and system migrationBpost implementation support handoff meetingCdetailed design developmentDstaff trainingEmigration plan development

单选题As the designated rudder angle is being achieved, as a result of the original command input, the steering gear follow-up mechanism is()Ain motion, providing a null inputBnot in motion, thus providing a null inputCin motion, providing an input to place the main pump on maximum strokeDin motion, providing an input to place the main pump at null stroke

单选题Operational amplifiers, used primarily in analog circuits, are characterized by()Ahigh input impedance, high gain and low output impedanceBhigh input impedance, high gain and high output impedanceClow input impedance, low gain and high output impedanceDlow input impedance, high gain and low output impedance

单选题You are designing a test plan for an existing Windows Azure .NET 4 application.  Method calls return incorrect results for certain input parameters.   You need to recommend an approach for debugging the method calls.  What should you recommend?()A Attach the remote debugger to the application.B Use the Microsoft Visual Studio 2010 Test Manager tool.C Use IntelliTrace to collect only eventsfrom the application.D Use IntelliTrace to collect events and call information from the application.