In reference to accidental oil pollution,the most critical time during bunkering is when ______.A.you first start to receive fuelB.hoses are being blown downC.final topping off is occurringD.hoses are being disconnected
In reference to accidental oil pollution,the most critical time during bunkering is when ______.
A.you first start to receive fuel
B.hoses are being blown down
C.final topping off is occurring
D.hoses are being disconnected
相关考题:
The most crucial time for project risk assessment is (75) .A.when a problem surfacesSXB The most crucial time for project risk assessment is (75) .A.when a problem surfacesB.during the planning phaseC.during the close-out phaseD.after the project schedule has been published
The most crucial time for any bearing with regards to lubrication isA.during low loadsB.after proper oil viscosity is reachedC.during startingD.after cleaning filters
during bunkering in the last vessel ,what were you assigned to do ?or what was your position during bunkering on your last vessel ?
what is your position (station ) in the muster lists ,for example ,during the fire fighting ,abandon vessel ,oil pollution prevention etc ?
The most crucial time for project risk assessment is ( ).A.when a problem surfacesB.during the planning phaseC.during the close-out phaseD.after the project schedule has been published
Which statement is TRUE of a gasoline spill ________.A.It is visible for a shorter time than a fuel oil spillB.It is not covered by the pollution lawsC.It does little harm to marine lifeD.It will sink more rapidly than crude oil
ACCIDENTAL ESCAPE OF OIL OUT OF A TANK WHEN IT GETS TOO FULL BECAUSE PUMPING WAS NOT STOPPED IN TIME defines ______.A.OverloadingB.Over dischargingC.OverflowD.Overtaking
The most crucial time for project risk assessment is ( ) . A.when a problem surfaces B.during the planning phase C.during the close-out phase D.after the project schedule has been published
The most crucial time for project risk assessment is ( ).A、when a problem surfacesB、during the planning phaseC、during the close-out phaseD、after the project schedule has been published
When deploying IPCC Express 4.0 for the first time, when and where is the licensing of the customer specified? ()A、during Installation Cluster Setup, in the CRS Installer B、after installation, during first-time login, in CRS Application Administration C、after installation, in CRS License Update Utility D、during Installation Server Setup, in the CRS Installer
Why is NTP an important component when implementing IPSec VPN in a PKI environment?()A、 To ensure the router has the correct time when generating its private/public key pairs.B、 To ensure the router has the correct time when checking certificate validity from the remote peersC、 To ensure the router time is sync with the remote peers for encryption keys generationD、 To ensure the router time is sync with the remote peers during theDH exchangeE、 To ensure the router time is sync with the remote peers when generating the cookies during IKE phase 1
单选题When a ship is involved in an oil pollution incident in China, the ship must report without delay to()AChina Maritime AdministrationBthe companyCthe cargo ownerDship owner
单选题ACCIDENTAL ESCAPE OF OIL OUT OF A TANK WHEN IT GETS TOO FULL BECAUSE PUMPING WAS NOT STOPPED IN TIME defines().AOverloadingBOver dischargingCOverflowDOvertaking
单选题Which of the followings needs not to be considered during bunkering?()AAll scuppers plugged by carpenterBTanks sounded from time to timeCWatch kept for leakageDTake oil samples
单选题When daylight savings time is kept,the time of tide and current calculations must be adjusted.One way of doing this is to().AAdd one hour to the times listed under the reference stationsBSubtract one hour from the time differences listed for the subordinate stationsCApply no correction as the times in the reference stations are adjusted for daylight savings timeDAdd 15° to the standard meridian when calculating the time difference
单选题The most likely time for oil pollution while bunkering is when().Afinal topping off is occurringBfirst starting to receive fuelChoses are being blown downDhoses are disconnected and being capped
单选题During extremely cold weather, while starting an engine, it turns too slowly and fails to startThis problem is most likely the result of ()Ahigh fuel oil viscosityBlow fuel oil temperatureChigh lube oil viscosityDenergized glow plugs
单选题When is the most critical time of bunkering in regards to oil pollution?()Alining up the systemsBtopping offCstarting deliveryDconnecting hoses and joints
单选题When a vessel violates an oil pollution act,who may be held responsible?().AMaster onlyBOwners onlyCLicensed officer on watchDAny individual connected with the vessel
单选题To avoid excessive pressures in the fuel oil filling system during bunkering, you should ().Aclose the tank filling valves quicklyBtop off all tanks at the same timeCrill completely all tanks to less than 95% fullDreduce the loading rate when topping off
单选题The most critical part of the bunkering operations, which can result in an oil spill, is when the ()Ahose joints are made upBtanks are being topped offCsystem is being lined upDpumping operation is first started
单选题In reference to accidental oil pollution,the most critical time during bunkering is when ().Ayou first start to receive fuelBhoses are being blown downCfinal topping off is occurringDhoses are being disconnected
单选题The temperature of the fuel oil received during bunkering operations is critical in determining the()Aexpansion space to leave in a tankBflash point at which the fuel will burnCtemperature to which the fuel must be heatedDrate at which the fuel can be pumped during transfer operations