A check line is ______.A.A safety line attached to a man working over the sideB.Used to measure water depthC.Used to slow the headway of a bargeD.Used to measure the overhead height of a bridge

A check line is ______.

A.A safety line attached to a man working over the side

B.Used to measure water depth

C.Used to slow the headway of a barge

D.Used to measure the overhead height of a bridge


相关考题:

What are two way sthat IP datagrams are passed from the ingress line module to the egress line module?() A.over an ATM PVCB.over a FastEthernet busC.overa Gigabit Ethernet busD.over high speed serial bus

What kind of cable should be used to establish a trunked line between two Catalyst switches?A.A straight-through cableB.An EIA/TIA-232 serial cableC.An auxiliary cableD.A modem cableE.A cross-over cable

Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

A mooring line leading 45° to the keel,used to check forward or astern movement of a vessel,is called a ______.A.spring lineB.warp lineC.bow lineD.breast line

A life preserver or buoyant work vest is required to be worn on a ship when a person is ______.A.working on the rig floorB.working over waterC.working on the pipe racksD.operating line throwing equipment

To determine the number of able seamen required on an inspected vessel,you should check the ______.A.Load Line CertificateB.operations manualC.Safety of Life at Sea CertificateD.Certificate of Inspection

To determine the number of certificated lifeboatmen required on a vessel,you should check the ______.A.Load Line CertificateB.Certificate of InspectionC.Safety of Life at Sea CertificateD.operations manual

To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the ______.A.load line certificateB.Operations ManualC.Safety of Life at Sea CertificateD.Certificate of Inspection

Which statement is TRUE about the use of a“gob rope”________.A.The gob rope is a mooring line for tying up lighters for working cargo alongside a vessel anchored in an open roadsteadB.The gob rope is used to secure the towline aft over the centerline of a tugC.The gob rope is a line hung over a vessel's side to assist in boardingD.The gob rope is a rope used in mooring a vessel to a buoy

Where do fatigue failures of wire rope mooring lines usually occur ________.A.In the middle part of the line lengthB.Near the socketed end fitting adjacent to the anchorC.At the point where the line touches the bottomD.At the place the anchor buoy is attached to the line

A line of position is ______.A.a line connecting two charted objectsB.a line on some point of which the vessel may be presumed to be locatedC.the position of your vesselD.not used in a running fix

An isotherm is ______.A.a line on a weather map connecting equal points of both temperature and pressureB.an instrument that measures the climatological effects of temperatureC.a line connecting points of equal barometric pressure on a weather mapD.a line connecting points of equal temperature on a weather map

Mooring lines should be turned end-for-end occasionally. This is because ______.A.a line is weakened by constantly pulling on it in one directionB.normal wear on the line is thus distributed to different areasC.it prevents the line from kinking or unlayingD.it prevents permanent misalignment of the line’s internal strands

What are two way sthat IP datagrams are passed from the ingress line module to the egress line module?()A、over an ATM PVCB、over a FastEthernet busC、overa Gigabit Ethernet busD、over high speed serial bus

以下信息对中,常用来表示通讯在线或离线的是()。A、On line、offlineB、Input、outputC、Run line、stop lineD、CHECK、TEST

If there is another line already on the bollard ,the eye of the second line should be()before placing it over the bollard.A、taken up through the eye of the first lineB、taken up over the eye of the first lineC、made fast to the first lineD、taken up from the eye of the first line

单选题A mooring line leading 45°to the keel,used to check forward or astern movement of a vessel,is called a().Aspring lineBwarp lineCbow lineDbreast line

单选题Besides saving distance along the track line,another advantage of the Scharnow Turn over the Williamson Turn in a man overboard situation because().Ait is fasterBit can be used in both the immediate action and the delayed action situationsCin fog,if the turn is started as soon as the man goes over,the vessel will be at the point where he went over when the turn is completedDit returns the vessel to the original track line on a reciprocal course

单选题You are handling a mooring line and are instructed to Check the line.What should you do().AEnsure the bight is not fouled by taking up slackBPay out the line smartly and keep it free for runningCSecure the line by adding more turnsDSurge the line so it maintains a strain without parting

单选题In Passage 2, the word check (line 60) most nearly means ______.AvalidateBconstrainCdirectDencourageEcompete

单选题Which statement is TRUE about nylon line?()AManila line will usually last longer than nylon lineBNylon line is excellent for use in alongside towingCA normal safe working load will stretch nylon line 50%DNylon stoppers should be used with nylon line

单选题A “check” line is().Aa safety line attached to a man working over the sideBused to measure water depthCused to slow the headway of a bargeDused to measure the overhead height of a bridge

单选题Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().Aafter torque causes line pull to exceed the rated capacity of the winchBbefore the line pull reaches the rated capacity of the winchCwhen the line pull reaches the breaking strength of the fallDbefore the safe working load of the fall is reached

单选题An anchor winch should be equipped with mechanical brakes capable of holding().Ahalf the breaking strength of the mooring lineBthe full breaking strength of the mooring lineCthe maximum expected tension of the mooring lineD50% over the working tension of the mooring line

单选题Safety valves on a boiler vent to the ().Afuel tankBbilgeCatmosphereDauxiliary exhaust line

单选题Which is the winter load waterline on the load waterline mark?().AThe line over the summer load waterlineBThe line above the tropical load waterlineCThe line below the tropical load waterlineDThe line between the summer and the winter north Atlantic load waterline

单选题How are lifelines attached to a life float?()ABy servingBBy splicing one end of the line around the apparatusCSecurely attached around the outside in bights no longer than three feetDWith an approved safety hook or shackle