单选题You are handling a mooring line and are instructed to Check the line.What should you do().AEnsure the bight is not fouled by taking up slackBPay out the line smartly and keep it free for runningCSecure the line by adding more turnsDSurge the line so it maintains a strain without parting
单选题
You are handling a mooring line and are instructed to Check the line.What should you do().
A
Ensure the bight is not fouled by taking up slack
B
Pay out the line smartly and keep it free for running
C
Secure the line by adding more turns
D
Surge the line so it maintains a strain without parting
参考解析
解析:
暂无解析
相关考题:
Mooring winch should be equipped with mechanical brakes capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line
Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line
A mooring line leading 45° to the keel,used to check forward or astern movement of a vessel,is called a ______.A.spring lineB.warp lineC.bow lineD.breast line
To determine the number of inflatable liferafts required on a vessel,you should check the ______.A.Load Line CertificateB.SOLAS CertificateC.Stability LetterD.Certificate of Inspection
If a mooring line should part while you are tying up at a dock,you should make a temporary eye by tying a ______.A.becket bendB.clove hitchC.bowlineD.square knot
The indication of a slipping anchor is a(n)______.A.Decrease in mooring line lengthB.Increase in the opposite amperageC.Increase in the opposite line tensionD.Decrease in mooring line tension and amperage
In order to pay out or slack a mooring line which is under strain, you should ______.A.sluice the lineB.surge the lineC.stopper the lineD.slip the line
单选题You need to make a fixed loop at the end of a line in order to use the line as a mooring line. You have insufficient time to make a splice. Which knot should you use?().AClove hitchBFisherman's bendCBowlineDRound-turn and two half hitches
单选题A mooring line leading 45°to the keel,used to check forward or astern movement of a vessel,is called a().Aspring lineBwarp lineCbow lineDbreast line
单选题To determine the number of able seamen required on an inspected vessel,you should check the ().ALoad Line CertificateBoperations manualCSafety of Life at Sea CertificateDCertificate of Inspection
单选题If a mooring line should part while you are tying up at a dock,you should make a temporary eye by tying a().Abecket bendBclove hitchCbowlineDsquare knot
单选题To determine the number of inflatable liferafts required on a vessel,you should check the ().ALoad Line CertificateBSOLAS CertificateCStability LetterDCertificate of Inspection
单选题In order to pay out or slack a mooring line which is under strain,you should().Asluice the lineBsurge the lineCstopper the lineDslip the line
单选题To determine the number of certificated lifeboatmen required on a vessel,you should check the ().ALoad Line CertificateBCertificate of InspectionCSafety of Life at Sea CertificateDoperations manual
单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()AThe lines may jam and then jump off the gypsyheadBIf there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadCThe lines' surging may cause the vessel to surgeDThe heat generated may cause the lines to temporarily fuse to the gypsyhead
单选题A Chinese stopper (two lines) will hold best when you().Afasten the bitter ends to the mooring line with half hitchesBtwist the ends together and hold them in the direction of the pullCtwist the ends together and hold them in the direction opposite to the pullDtwist the ends together and hold them at right angles to the mooring line
单选题These include deck machinery such as mooring equipment, anchor handling equipment, cranes and ().AboilersBbow thrustersCstabilizersDhatch covers
单选题The indication of a slipping anchor is a(n)().Adecrease in mooring line lengthBincrease in the opposite amperageCincrease in the opposite line tensionDdecrease in mooring line tension and amperage
单选题Most anchor handling equipment incorporates () for mooring purposes.Acable liftersBspur wheelsCbollardDwarpends
单选题Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()APut one line at the low point and one at the high point of the bollard so they don't touchBTake the eye of the second line up through the eye of the first line before putting the second line on the bollardCNever put two mooring lines on the same bollardDThe mooring line forward should be put on the bollard first
单选题A “spring line” is().Aany wire rope used for mooringBa fire-warpCa mooring line running diagonally to the keelDa mooring line perpendicular to the keel
单选题What is normally used to pass a mooring line to a dock?()ADistance lineBGantlineCHeaving lineDTag line
单选题When checking a mooring line,you should().Aensure the bight is not fouled between the ship and the dock by taking up slackBpay out slack smartly and keep free for runningCsecure more turns to hold the line against any strain,then clear the areaDsurge the line so that it maintains a strain without parting