A vessel in ocean service that does not have an approved means of processing oily bilge slops or oily ballast must have ______.A.a fixed piping system for ballast discharge to a reception facilityB.a discharge outlet for the ballast system on each side of the weather deckC.one portable adapter for a shore connection to the ballast lineD.All of the above

A vessel in ocean service that does not have an approved means of processing oily bilge slops or oily ballast must have ______.

A.a fixed piping system for ballast discharge to a reception facility

B.a discharge outlet for the ballast system on each side of the weather deck

C.one portable adapter for a shore connection to the ballast line

D.All of the above


相关考题:

Of the following,______means the sufficiency of a vessel in materials,construction,equipment,crew,and outfit for the trade or service in which it is employed.A.ProficiencyB.SeaworthinessC.CargoworthinessD.Readiness

Any vessel that does not have the necessary certificates on board will ______ the Panama Canal.A.be heavily fined byB.be ordered to depart fromC.not be permitted to transitD.not be required to leave

My vessel is healthy and I request free pratique.What does the sentence My vessel is healthy mean?It means: ______.A.My ship has been maintainedB.My ship has been paintedC.All my crew members have been vaccinatedD.All my crew members have no quarantinable diseases

Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include______.A.approved oily-water separating equipmentB.a fixed or portable containment system at the shore connectionC.a spare pump in case the main pump is inoperativeD.at least one outlet accessible from the weather deck

Bilge keels are fitted on ships to ______.A.Assist in drydock alignmentB.Improve the vessel's stabilityC.Protect the vessel from slamming against piersD.Reduce the rolling of the vessel

Each vessel in ocean and coastwise service must have an approved EPIRB.An EPIRB______.A.must be stowed in a manner so that it will float free if the vessel sinksB.is a devise that transmits a radio signalC.must be stowed where it is readily accessible for testing and useD.All of the above

I HAVE DANGEROUS LIST means ______.A.I have some dangerous cargo on boardB.My cargo is dangerousC.My vessel is inclinedD.My vessel has not been trimmed properly

Letter “H” means“()”.A、I have a pilot on boardB、I require a pilotC、I have stoppedD、My vessel is healthy

单选题My vessel is healthy and I request free pratique.What does the sentence My vessel is healthy mean?It means;().AMy ship has been maintainedBMy ship has been paintedCAll my crew members have been vaccinatedDAll my crew members have no quarantinable diseases

单选题Any vessel that does not have the necessary certificates on board will () the Panama Canal.Abe heavily fined byBbe ordered to depart fromCnot be permitted to transitDnot be required to leave

单选题Which of the equipment listed is most effective in processing bilge slops for overboard discharge?()A100PPM oily water separatorBAssembling the lube oil purifier as a separator and aligning bilge overboardCA 15PPM oily water separatorDA magnetic duplex strainer

单选题The ()pump is usually used as the bilge feed pump to an oily water separator.AturbineBscrewCvaneDejector

单选题Upon arrival at a port, a vessel is not allowed () her ballast water, tanker washings or bilge water and other oily water at will.Ato dischargeBto be dischargedCdischargingDbeing discharged

单选题A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().Aholding its slops onboard until they can be pumped into the city sewer systemBcirculating them through the lube oil purifier to remove water and debrisCholding its slops onboard until they can be discharged to a shore side reception facilityDpumping them into a settling tank for separation before pumping the oily water residue overboard

单选题What is the minimum number of deck officers,able seaman or certificated persons required for a lifeboat on a vessel in ocean service?()ATwoBThreeCFourDFive

单选题During inspection of oil and oily mixtures from machinery spaces, which of the following factors should be taken into account by the PSCO? ()AThe quantity of oil residues generatedBThe capacity of sludge and bilge water holding tankCThe capacity of the oily water separatorDAll of the above

单选题Bilge keels are fitted on ship to().Aassist in drydock alignmentBimprove the vessel's stabilityCprotect the vessel from slamming against piersDreduce the rolling of the vessel

单选题Fuel oil is pumped by means of () from the bunker tanks.Aa transfer pumpBa bilge pumpCa service pumpDa vacuum pump

单选题Which vessel in ocean service is not subject to Annex V of MARPOL 73/78? ()AA 20-foot sailing vesselBA 26-foot tug and towCAn uninspected 35-foot passenger vesselDA Navy Destroyer

单选题Before the oily water separator put into operation, it should be ()Afilled with bilge waterBfilled with oilCfilled with clean waterDbe emptied

单选题A vessel in ocean service that does not have an approved means of processing oily bilge slops or oily ballast must have().Aa fixed piping system for ballast discharge to a reception facilityBa discharge outlet for the ballast system on each side of the weather deckCone portable adapter for a shore connection to the ballast lineDAll of the above

单选题What would have the greatest affect on a vessel’s longitudinal strength? ()ACollision damage to the bow,forward of the collision bulkheadBGrounding damage to the bilge strake,just aft of midshipsCExtensive corrosion to the centerline deck platingDDamage to the side shell,midway between the bilge and the stringer plate

单选题The function of the bilge keel is to().Areduce the rolling of the vesselBserve as the vessel's main strength memberCadd strength to the bilgeDprotect the vessel's hull when alongside a dock

单选题Acknowledgement by you of receipt of a distress message from a vessel which,beyond any possible doubt,is not in your vicinity and is a long distance away must be made when().AVessels nearer the distress vessel acknowledge receiptBVessels nearer the distress vessel fail to acknowledge receiptCEven you have not reveived the distressDEven the vessel in distress expressly prohibit you from providing any salvage service

单选题A bilge suction line,in a fishing vessel with more than 16 individuals aboard,must have a strainer with an open area not less than how many times the open area of the suction line?()AoneBtwoCthreeDfour

单选题I HAVE DANGEROUS LIST means().AI have some dangerous cargo on boardBMy cargo is dangerousCMy vessel is inclinedDMy vessel has not been trimmed properly

填空题What is meant if you go on using the service after changes in the agreement are posted?It means you have ____ the modification.