(75)refers to the process of testing and then eliminating errors.A.DebuggingB.ProgrammingC. AnalysisD.Maintenance

(75)refers to the process of testing and then eliminating errors.

A.Debugging
B.Programming
C. Analysis
D.Maintenance

参考解析

解析:调试指的是测试并纠错的过程。

相关考题:

●Where box testing of software testing is a test for software structure.Which of the following item should noe be included ing the content of white box? (75) .(75) A.boundary value analysisB.statement testingC.branch testingD.path testing

Integration(73)is the process of verifying that the components of a system work together as described in the program design and system design specifications.(73)A.tryingB.checkingC.testing.D.coding

Which of the following statements about testing software with data is (are) true?Ⅰ.The primary purpose of such testing is to find errors.Ⅱ.Such testing can demonstrate the existence of errors but cannot demonstrate the absence of errors.A.NeitherB.I onlyC.ⅡonlyD.Ⅰand Ⅱ

● Integration(73)is the process of verifying that the components of a system work together as described in the program design and system design specifications.(73)A. trying B. checking C. testing D. coding

In the system development process,modularity is a very well-established principle used in the______phase.A.designB.analysisC.implementationD.testing

● Software (71) refers to that the software to meet the specification must be produced.(71)A. testB. supportC. developmentD. process

The Rational Unified Process(RUP)is a software engineering process, which captures many of best practices in modem software development. The notions of(71)and scenarios have been proven to be an excellent way to capture function requirements. RUP can be described in two dimensions - time and content. In the time dimension, the software lifecycle is broken into cycles. Each cycle is divided into four consecutive(72)which is concluded with a well-defined(73)and can be further broken down into(74)- a complete development loop resulting in a release of an executable product, a subset of the final product under development, which grows incrementally to become the final system. The content structure refers to the disciplines, which group(75)logically by nature.A.artifactsB.use-casesC.actorsD.workers

Beneficial backwash refers to the ____effect of testing on teaching and learning. A.positiveB.negativeC.activeD.effective

White box testing of software testing is a test for software structure. Which of the following item should not be included in the content of white box?(75).A.boundary value analysisB.statement testingC.branch testingD.path testing

试题(75)Which of the following is not part of the change-management process of IT supervisor?(75).(75)A.change analysesB.change evaluationC.change acquisitionD.change executing

Functional testing tests whether the output is the expected(75)with the valid input.A.reasonB.resultC.outcomeD.record

( )refers to the process of testing and then eliminating errors.A. Debugging B. Programming C. Analysis D. Maintenance

Which of following statements about testing software with data is (are) true?Ⅰ.The primary purpose of such testing is to find errors.Ⅱ.Such testing can demonstrate the existence of errors but can not demonstrate the absence of errors.A.NeitherB.Ⅰ onlyC.Ⅱ onlyD.Ⅰ and Ⅱ

●Unit testing refers to that each (73) is tested to ensure that it operates correctly.(73)A. subsystemB.deviceC.applicationD.module

●The development process in the software (74) involves four phases: analysis,design,implementation, and testing.(74)A.maintenanceB.lifecycleC.programmingD.upgrading

Which of the following is NOT true about the assessment in language teaching?A.Testing does not equate with assessment.B.Summative assessment focuses on the process of learning.C.The students themselves should be given the chance to evaluate their own performance.D.Assessment means to discover what the learners know and can do at certain stage of the learning process.

Unit testing refers to that each ( ) is tested to ensure that it operates correctly.A. subsystemB. deviceC. applicationD. module

The development process in the software______involves four phases:analysis,design,implementation,and testing.A.maintenanceB.1ife cycleC.programmingD.upgrading

The development process in the software ______ involves four phases: analysis, design, implementation, and testing.A.maintenance]B.1ife] cycle]C.programmingD.upgrading

Software( )refers to that the software to meet the specification must be produced.A.testB.supportC.developmentD.process

The would“it”in the last sentence refers to_______.A.seawaterB.purified waterC.the process of getting rid of the salt in seawaterD.the process of collecting salt from the sea oceans

Software ( )refers to that the software to meet the specification must be produced. A. testB. supportC. developmentD. process

Which of the following is the MOST important step in any disaster recovery plan?()A、 Appropriate use of backup media and offsite storageB、 The disaster recovery testing process过程C、 Classifying systems according to operational impactD、 Use appropriate fire suppressant systems

A customer is in the process of testing their configuration prior to going live. The administrator discovers thatPowerHA is taking 31 seconds to deal with a standard NIC failure. What can the administrator do to speed upthe process of NIC failure detection and diagnosis?()A、Tune the topsvcs NIM settingsB、Tune the grpsvcs NIM settingsC、Activate the fast failure detection (FFD) featureD、Activate the Gigabit fast failover feature on the physical adapters

单选题Which of the following is the MOST important step in any disaster recovery plan?()A Appropriate use of backup media and offsite storageB The disaster recovery testing process过程C Classifying systems according to operational impactD Use appropriate fire suppressant systems

单选题In sewage treatment, the term maceration refers to the process of ()Abreaking up solid matter into fine particlesBprecipitating non-decomposed waste in a collection tankCchemically adjusting the sewage ph to 7-0Deliminating bacterium coli from the sewage

单选题While in drydock your vessel will be belt-gauged.This process involves().Ameasuring the thickness of the tail shaft linerBtaking the vessel's offsets to check for hull deformationCtesting and examining the anchor cables for defective linksDdrilling or sonic-testing the hull to determine the plate thickness