以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity of hatchway; 6) During loading , care about list and heeling angle do not exceed 3; 7) After loading 800t (flexible weight), please pay attention to satisfy the requirement of draft difference in trim 0.5~ 1.0m .A、1)严格按配载计划要求执行;2)分两轮隔舱装;B、3)第一轮每舱1000t,隔舱装载;4)第二轮每舱8000t,隔舱装载;5)在舱口范围内尽量装平;C、6)装货过程中注意左右均横,横倾角不超过3°;7)装载最后800t(机动重量)时,请注意满足尾倾0.5~1.0m的吃水差要求。D、以上都对

以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity of hatchway; 6) During loading , care about list and heeling angle do not exceed 3; 7) After loading 800t (flexible weight), please pay attention to satisfy the requirement of draft difference in trim 0.5~ 1.0m .

  • A、1)严格按配载计划要求执行;2)分两轮隔舱装;
  • B、3)第一轮每舱1000t,隔舱装载;4)第二轮每舱8000t,隔舱装载;5)在舱口范围内尽量装平;
  • C、6)装货过程中注意左右均横,横倾角不超过3°;7)装载最后800t(机动重量)时,请注意满足尾倾0.5~1.0m的吃水差要求。
  • D、以上都对

相关考题:

LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERAL ARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,______ is not mentioned.A.the vessel will shift to another berthB.loading is in normal progressC.she is expected to leave 2400 tonightD.the arrangement of her loading operations is far from satisfactory

While loading cargo,a white trimming light on the starboard side comes on. This indicates that ______.A.the vessel has a list of about 1` to starboardB.the chutes should be directed to the starboard sideC.the chutes in No. 1 hold should be directed to the starboard sideD.a severe list to starboard has developed and all loading should cease

WHEN CONTACT MADE WITH THE RADIO STATION OAS AT SAN JUAN,A PRE-STOWAGE HATCH LIST WITH SEQUENCE OF LOADING TO BE SENT TO LOAD PORT NOT LESS THAN 48 HRS IN ADVANCE.From this fax,the pre-stowage hatch list shall be sent to ______.A.THE RADIO STATIONB.SAN JUANC.OASD.LOAD PORT

Loading cargo operation in hold No.3 stopped owing to ______.A.gangs employedB.windlass troubleC.gangs unavailableD.shortage of navigational charts

______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition

You are scheduled to load a bulk shipment of steel turnings.Which statement is TRUE ________.A.The primary hazard of this cargo is that it is subject to spontaneous heating and ignitionB.The shipping papers should describe this cargo as Waste,Steel BoringsC.After loading,you may not sail if the temperature in each hold of steel turnings exceeds 54℃D.This cargo may not be transported in bulk unless a special permit is issued by the competent authorities

______ is not one of the more commonly adopted solid bulk cargo distributions.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Inhomogeneous hold loading condition

You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.A.use separation cloths between the deck and cargoB.place the cargo on a layer of spaced dunnageC.hose down the deck before loading the cargoD.use bag-on-bag stowage

When loading a tanker,you should ______.A.load only one tank at a timeB.keep the seamen on watch on standby in the mess roomC.keep a strain on the loading hosesD.close valves by closing them down,reopening one or two turns,and re-closing

以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.A、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。D、以上都对

英文备注“Implement the requirement of Stowage plan strictly”的中文意思是:()A、 严格按配载计划要求执行B、 请进行相应的积载工作C、 请根据要求制作积载计D、 积载计划的要求已经确定

以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay two tiers wood block and one tier mat on China wood oil 、 bauxite 、 sausage skin 、 flint clayA、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.3舱二层舱烤烟留通风道30厘米,上铺木板;C、5)桐油、铝矾土、肠衣、焦宝石上铺二层木板,一层席子。D、以上都对

语句 select round(13.4321,2), round(13.4567,3)的执行结果是:()。

英文备注“Two round Loading”的中文意思是:()A、两个计划装载B、分两轮隔舱装C、两个装载舱D、两部分进行装载

英文备注“First round 1000t each hold, separation loading”的中文意思是:()A、第一次两个舱分开装B、第一次装1000t,第二次再装1000tC、第一轮每舱1000t,隔舱装载D、第一轮每舱1000t,分开来装

英文备注“second round 8000t each hold,separation loading”的中文意思是:()A、第二次每舱装8000tB、第二次每舱装8000t,分开来装C、第二轮每舱8000t,隔舱装载D、第二轮每舱8000t,分开来装

英文备注“load evenly as far as possible in the vicinity of hatchway”的中文意思是:()A、在舱口边尽量装平B、在舱口下方尽量装平C、在舱口以外的地方尽量装平D、在舱口范围内尽量装平

Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option

For which two tasks would it be best NOT to use the utility SQL*Loader?()A、When loading selected rows into each table.B、When loading data from an export dump file.C、When loading data from disk, tape, or named pipes.D、When your data is NOT being inserted from a flat file.E、When using a record management system to access data files.

You have an Exchange Server 2010 organization.  The organization contains two servers named Server1 and Server2.  Server1 and Server2 have the Mailbox server role and the Hub Transport server role installed. Server 1 and Server2 are members of a database availability group (DAG).  You need to plan the deployment of Client Access servers to meet the following requirements: .Users must be able to access their mailboxes if a single server fails .Users must not attempt to connect to a failed server  What should you include in your plan?()A、On Server1 and Server2, install the Client Access server role. Implement failover clustering.B、On Server1 and Server2, install the Client Access server role. Configure network interface card (NIC) teaming on each server.C、Deploy two new Client Access servers. Implement load balancing by using DNS round robin.Create a Client Access server array.D、Deploy two new Client Access servers. Implement load balancing by using a Windows Network Load Balancing cluster. Create a Client Access server array.

关于ROUND()函数,下列计算那个是不正确的()。A、Round(103.456,2)的返回值为103.46B、Round(3274.56,-1)的返回值为3270C、Round(3274.56,-2)的返回值为3300D、round(1256.233,2)的返回值为1256.24

单选题The stowage factor should be calculated().Abefore the stowage plan is madeBwhen the stowage plan is madeCafter the stowage plan is madeDbefore loading

单选题In order to reduce the accumulation of static electricity while loading petroleum products, you should().Astart to load at maximum pressureBstart to load slowlyCincrease the air flow into the tankDuse the overall method of loading only

单选题For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of().Athree barrelsBfour barrelsCsix barrelsDeight barrels

单选题Which narrative regarding loading software is incorrect?()AThe approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletBA Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipCFollowing a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestDA Loading Program may be provided as a classification requirement or as an Owner’s option

单选题The British Royal Society for the Prevention of Accidents (ROSPA) is petitioning to keep the UK on British Summer Time all year round, and they claim that nearly 450 serious accidents occur each year because of the time change.Aall year round, and they claim that nearly 450 serious accidents occur each year because of the time changeBall throughout the year, and they claim that nearly 450 serious accidents occur each year because of itCall year, claiming that nearly 450 serious accidents occur each year because of itDall year round, claiming that nearly 450 serious accidents occur each year because of the time changeEall year round, and they claim that nearly 450 serious accidents occur each and every year because of the time change

单选题Loading cargo operation in hold No.3 stopped owing to().Agangs employedBwindlass troubleCgangs unavailableDshortage of navigational charts